Spitfiredude
New member
I try to stay as anonymous as possible with my identity, but working at SDA, this is what I was told would happen. The athletic dept doesn't have money to completely tear down the stadium and redo it. So they will somewhat low ball it. We will see how it goes. The press box is in real need of renovations as well. I'm surprised they're not getting rid of it. I hope the academic center gets revamped. It is out of date as well. Odd to take a recruit through there and then go to the third floor/basement and show him an outstanding renovated football facility.
Details in the release:
Replace lower bowl tread on east and west sides, which would allow for more legroom, and seats and benches with seatbacks.
• All public areas (concourse, restrooms, concessions, ramps, etc.) will be raised and rebuilt with substantially more fixtures and services provided to be consistent with modern football venues across the country.
• Escalators will connect various concourse levels.
• Addition of a new state-of-the-art video board to be installed on the north plaza, as well as a new sound system.
• A unique terrace will be built on the north plaza where concerts and community events can be hosted.
• Current press box will be enhanced and new kitchen installed.
• Upper deck will be reconfigured to increase height between concourses, allowing the development of a new premium seating level for new suites and club space.
• Club area will be air-conditioned and the club seating will be open-air.
• A new student section will be built and plans include a student club area.
• Most unique element of the renovation will be the addition of a “scrim” or video ribbon on the outside of the stadium. Videos and images can be projected off the stadium throughout the year to passers by on either side of the venue.
• SDA is evaluating adding the following to the scope of the stadium project: renovating the football facilities (locker room, sports medicine/training, weight room, equipment room, recruiting center, and office space) and completely revamping the Sun Devil Athletics Academic Center
The good news is that the team will stay in Tempe, which won't knock the economy. Also, they won't be placing that worthless canopy over it. If they were gonna do that, they should have just spent an additional 50-100 million and made it an indoor stadium.
As for the timeline, it is ideal, but seeing how initially we were told they would knock out the north EZ after the 2012 season...we will see.
I do love the idea of the video ribbon and everything on the exterior, but I feel that money could be used for other things in the stadium. If they are truly committed though, it won't need to be used for the interior.
Just to list things in the order they are expected to open:
2014:
AMC Theater
Apartments next to TAC
College Avenue Commons
2015:
Hanover Apartments
USA Place
Omni Hotel
State Farm Phase 1
Hub Phase 2?
2016:
HFL 3?
State Farm Phase 2?
Hub Phase 2?
Street Car (most likely connects State Farm to Rural/Apache)
2017:
Sun Devil Stadium
Completion of State Farm
My wishlist:
Another corporate headquarters announcement for space near Mill (20-40 floor building)
University Square revamped proposal
Residential/hotel component at 7th and Mill (15-30 floor)
Commencement of Hayden Harbor > South Bank proposal
Details in the release:
Replace lower bowl tread on east and west sides, which would allow for more legroom, and seats and benches with seatbacks.
• All public areas (concourse, restrooms, concessions, ramps, etc.) will be raised and rebuilt with substantially more fixtures and services provided to be consistent with modern football venues across the country.
• Escalators will connect various concourse levels.
• Addition of a new state-of-the-art video board to be installed on the north plaza, as well as a new sound system.
• A unique terrace will be built on the north plaza where concerts and community events can be hosted.
• Current press box will be enhanced and new kitchen installed.
• Upper deck will be reconfigured to increase height between concourses, allowing the development of a new premium seating level for new suites and club space.
• Club area will be air-conditioned and the club seating will be open-air.
• A new student section will be built and plans include a student club area.
• Most unique element of the renovation will be the addition of a “scrim” or video ribbon on the outside of the stadium. Videos and images can be projected off the stadium throughout the year to passers by on either side of the venue.
• SDA is evaluating adding the following to the scope of the stadium project: renovating the football facilities (locker room, sports medicine/training, weight room, equipment room, recruiting center, and office space) and completely revamping the Sun Devil Athletics Academic Center
The good news is that the team will stay in Tempe, which won't knock the economy. Also, they won't be placing that worthless canopy over it. If they were gonna do that, they should have just spent an additional 50-100 million and made it an indoor stadium.
As for the timeline, it is ideal, but seeing how initially we were told they would knock out the north EZ after the 2012 season...we will see.
I do love the idea of the video ribbon and everything on the exterior, but I feel that money could be used for other things in the stadium. If they are truly committed though, it won't need to be used for the interior.
Just to list things in the order they are expected to open:
2014:
AMC Theater
Apartments next to TAC
College Avenue Commons
2015:
Hanover Apartments
USA Place
Omni Hotel
State Farm Phase 1
Hub Phase 2?
2016:
HFL 3?
State Farm Phase 2?
Hub Phase 2?
Street Car (most likely connects State Farm to Rural/Apache)
2017:
Sun Devil Stadium
Completion of State Farm
My wishlist:
Another corporate headquarters announcement for space near Mill (20-40 floor building)
University Square revamped proposal
Residential/hotel component at 7th and Mill (15-30 floor)
Commencement of Hayden Harbor > South Bank proposal