Streetcar????

moosanova

New member
Anyone know when in fact the Seattle Streetcar actually opens????

I know for a fact that rail has yet to be laid on Westlake Avenue.....

Utility work has been done in some spots along the route.... but i have yet to see any major progress as far as rail being laid or even overhead wiring.

and does the 2201 project have anything to do with the sluggish progression of the rail work or other implements of the Streetcar???
 
Some track has been laid along Fairview and Boren.

It's supposed to be operational in November of this year according to the schedule (which can be found here).
 
I just looked at the schedule recently and was amazed that (assuming everything is on schedule) they are about 1/2 way through track construction already.
 
Are you talking about the street between the lake and Cancer Care Alliance? They've torn up the street along there with construction.
 
....

i thought i saw some rail somewhere too, can't remember where though. Across the street from metropolotan? 2201 is a handsome structure!
 
I just looked at the schedule recently and was amazed that (assuming everything is on schedule) they are about 1/2 way through track construction already.

It looks like they're a bit behind given that I've only seen track installed on Fairview and a bit at the turn a block east of Westlake Ave N. Next time I'm around this area I'll keep an eye out for the "maintenance base" building. I don't even recall seeing it's construction underway but maybe I need to look for it. I hope they do more nighttime lane closures next to Lake Union. It recently took me 10 minutes to drive a couple of blocks in that area.

SLU%20Streetcar%20Route%204_11_06.jpg


i thought i saw some rail somewhere too, can't remember where though. Across the street from metropolotan? 2201 is a handsome structure!

Maybe you mean 2200 is handsome or 2201 will be handsome. 2201/Enso will have a street car stop right in front of it last I heard. I don't think this project would have any direct impact on the streetcar. The streetcar should be up and running well before 2201 is completed. If the sidewalk isn't done in front of 2201 I'd think they would just not stop there or have a temporary stop nearby.

Overall - walking will be much more convenient for me than the streetcar for the vast majority of my trips from downtown to SLU.
 
Nice to hear that there's some rail down.

I think I'll likely walk when I need to get to that area as well. I figure I'll take the streetcar once to see what it's like. Otherwise I don't need a direct connection between Downtown and Hooters.
 
Steetcar will be a huge improvement over the walk through what is now not a very ped-friendly areas (esp south of denny, crossing Denny, crossing Mercer, and especially in bad weather
 
I do know that several electrical vaults have already been placed underground, specifically around the westlake mall area...... catenary should be coming during the summer from what i'm hearing..... and track work should begin this summer around westlake mall and move northward beginning sometime around mid may or early june....... should be a cool new addition to seattle... but only for those drunks and weekend hawks fans coming from Jillians and nearby Hooters.....
 
^ Yeah, it is an early arrival to a very underdeveloped area, but once there's more infill and activity, I'm sure the line will become more valuable to the residents of downtown or for those of us who want to stroll the new park at Lake Union or make a quick hop to Whole Foods. I hope they expand the line to U Dub or to points in the southern reaches of downtown.
 
There's more at the City site about an overall streetcar network, that includes extending the SLU one to connect with light rail in the U District, and extending the Waterfront one down Jackson to 23rd and also potentially from Jackson north onto Broadway to connect with the Capitol Hill light rail station and maybe go all the way to Aloha. The last one seems to be a Sound Transit make good for not having light rail go to First Hill.

http://www.seattle.gov/transportation/streetcarnetwork.htm
 
I've thought a streetcar on 12th Ave would be awesome. It's a fairly easy grade, no major up-n-downs. It could connect the emerging 12th Ave hub on Capitol Hill and the Upper International District with Seattle U in the middle and Seattle Central near the north end.
 
^I have to agree with that. 12th Avenue has no major bus route. It would be great for Little Saigon, SU and Capitol Hill, especially considering the proposal for the Goodwill site. I have not heard much about the site's fate as of late.
 
12th could work great. There's so much going on in that corridor - I was walking around yesterday and the activity around SU and Pike/Pine is really exciting.
 