Provo MSA Development Thread


C'mon people don't fall the 'sprawlsalot' attitude.:koko:

auD1sFd.png


♫ I like big lots and I cannot lie ♫ ----------> :dj
 
UVU Student Housing

It will be 5 stories Developed by PEG Development.

UVU-Student-Housing.bmp


It is actually an attractive development compared to others that have been going up in Orem.

This is needed badly, students are having a hard time finding a place to live around UVU.
https://www.pegdev.com/portfolio/
 
Last edited:
Good to hear. I wonder if and what part the VOID technology will play in this park. Seems to me like a given marriage.

Looking northward at this pic, I'm amazed at how much has filled in over just the past few years. Won't be long before the east side of I-15 runs out of empty land.


20770213_717604801762472_5782334658540856785_n.jpg

https://scontent-ort2-1.xx.fbcdn.net/
 
Saratoga Springs breaks ground on huge $11 million sports complex ​

Karissa Neely, Daily Herald
http://www.heraldextra.com/news/loc...cle_b03d58d5-4dfd-5cdb-b1d7-5ca73ea6f29f.html

According to Saratoga Springs Mayor Jim Miller, the $11 million project, dubbed Patriot Park, has been four years in the making. It will include six baseball diamonds, eight pickleball courts, batting cages, two different playgrounds, five picnic pavilions and concessions and restroom buildings...

...Of the park’s six baseball fields, four will be regulation size, so the city could potentially host major baseball competitions at the park, which is located at about 400 South and Saratoga Road...

...Also unique to the park will be a military monument dedicated to those residents who have served in the armed forces. This monument will greet players and families as they enter. In keeping with that theme, the fields will not be numbered, but instead will boast patriotic designations. Miller said the four large fields will be named for the Army, Navy, Marines and Air Force. They two smaller ball fields will be named for the Coast Guard and the nation’s first responders...



.
 
Last edited:
Podium Breaks Ground On New Corporate Headquarters In Lehi​

Karissa Neely, Daily Herald
http://www.heraldextra.com/business...cle_bf0ad113-fd9b-5f22-ad6f-c94b76555fe8.html

Podium, a Lehi-based software as a service platform that enables local businesses and consumers to interact through messaging tools and online reviews, broke ground on the construction of a new 125,000-square-foot corporate headquarters in Lehi. The company currently employs about 250 people, but is expected to grow to nearly 400 by the time the building is completed in August 2018...

...Founded in 2014, Podium has quickly established itself as one of the fastest growing startups in the nation, growing from 15 employees to 250 in just a little more than 18 months. Podium currently serves more than 13,000 businesses and 100,000 users. The new headquarters will give the company the room it needs to grow...


59e5215ac8523.image.jpg

Courtesy Podium​

.
 
Direct sales company Asea opens international headquarters in Pleasant Grove ​
​


Karissa Neely, Daily Herald
http://www.heraldextra.com/business...cle_fffdcdad-45da-5bf4-b943-52835673d9c8.html

Asea executives lauded the company’s new Pleasant Grove
headquarters building as a new foundation for the company’s
future Monday.

“This building doesn’t represent a culmination, but a beginning
for a new phase of growth,” said Jarom Webb, Asea president.

Webb and other company executives held a grand opening for
the company’s new headquarters in Pleasant Grove, just off
Pleasant Grove Boulevard. The 50,000-square-foot facility is less
than a mile from the company’s production facility, built in 2013.
Between the two buildings, the company now has the capacity to
significantly grow in employees and global reach.


Asea manufactures and markets cellular health products, and in
less than 10 years, the company has expanded from a handful of
employees to an internationally-known direct sales company. Asea
is now operating in more than 30 international markets, with more
than 65,000 active distributors across the globe. Webb said the
company plans to focus on opening areas in Asia over the next few
years. The company already has a presence in Hong Kong and
Singapore, and recently announced plans for Taiwan, Thailand
and the Phillippines.

“Our vision is to become a global leader in cellular health,...
​

asea1-4.jpg

Pleasant Grove, UT. ASEA Corporate Office​

.
 
Mountain Tech Center, Lindon​

More development coming to PG Blvd -- this time on the west side​

Karissa Neely, Daily Herald
http://www.heraldextra.com/business...cle_14daf628-70c3-53bd-9105-1b79975a9cd2.html

Land around the Pleasant Grove Boulevard freeway interchange seems to be sprouting buildings overnight, and it’s not going to slow down any time soon.

Both sides of the freeway are getting attention, and commuters will begin to see a lot more activity on the west side in just a few short months. The Mountain Tech Center development has already broken ground, and will continue to fill in the northeast and southwest land on 600 North there in Lindon.

The Mountain Tech Center is a $200 million dollar, mixed-use development featuring 650,000 square feet of Class A office and industrial space spread over 10 buildings. The first building is a two-story office/warehouse hybrid, with just over 52,000 square feet completed last year. It already has multiple tenants.

The second building is under construction, and as has been announced previously, already has an anchor tenant in Jive Communications. According to Ben Richardson, senior vice president of Newmark Grubb Acres and broker in the development, Jive will take two floors of the new building which should be completed next summer.

The next phase of the development will include a large, 88,000 square feet of office/warehouse/industrial space, divisible to 8,000 square feet. Mark Weldon, Mountain Tech’s developer and president and CEO of WICP Commercial Properties, said this space is unique, and can accommodate office/warehouse uses, distribution uses and industrial or retail uses. The building boasts the first 32-foot clear height building in Utah County...


59e021b97d155.image.jpg

Courtesy, Newmark Grubb Acres


59e021b9df674.image.jpg

Courtesy Newmark Grubb AcresA rendering of the 88,000 sq. feet Flex Building in the Mountain Tech Center development currently under construction in Lindon. The building will feature 32-foot clear height spaces.

59e7cea73da87.image.jpg

Courtesy Newmark Grubb Acres​

.
 
Last edited:
Orem - BRT Update - Utah Valley University (UVU) Campus​
​


https://www.rideuta.com/About-UTA/A...mprovement-Project/Weekly-Construction-Update

10162017b.ashx

Oct. 13th - UVU campus BRT station work

Irrigation installation and finish grading are underway around new station platforms. Platform benches and top slabs will be constructed in a few weeks.

UTA bus stops have been relocated back to their original sites just east of the Sandhill Road/College Drive roundabout. Work continues on station platforms, which are not yet accessible.


Orem - Parkway Update - University Parkway Orem (400 West - 800 East)

10162017c.ashx

Oct. 13th - Roadway widening on University Parkway in Orem

Construction is scheduled to begin in the median of University Parkway between 400 West and 800 East later this summer. This work will clear a path for the BRT portion of the project. Work on the outside lanes is scheduled from Fall 2016 through Summer 2017. Access will be maintained to all businesses. Watch for updates as more information becomes available


University Parkway Diagonal (800 East, Orem - University Avenue, Provo)

10162017d.ashx

Oct. 14th - 16th, Construction progress in this segment

Soil nail wall finishing, barrier placement, paving and irrigation installation are planned next week eastbound between Carterville bridge and 550 W.

Reconstruction of the 2230 N./550 W. intersection is wrapping up and traffic configurations have been adjusted to open more travel lanes at the intersection.

Road base placement and curb installation are underway from 550 W. to Freedom Blvd.

Reconstruction of the outer sections of the Provo River bridge continues.

Paving and irrigation installations are planned next week from Freedom Blvd. to Univ. Ave.


Finished Product
When the new bridge and roadway are complete, there will be three traffic lanes in each direction and room for the BRT in the middle. The College Connector bike route will provide bike access throughout this area.
third_car_road_graphic.ashx

.


.
 
Last edited:
Lone Peak Plaza announced
​
​


Karissa Neely, Daily Herald
http://www.heraldextra.com/business...cle_3c6d3607-49cd-5449-8522-66d14a84cfdd.html

The Lone Peak Plaza development was recently announced, and is slated to be a 125,000-square-foot Class A building. The new five-story office tower delivers unique potential to the dynamic north Utah County market...

...Nature’s Sunshine Products, a leading natural health and wellness company with a global direct sales force of more than 500,000 in more than 40 counties, has already executed a long-term lease to occupy space as the building’s anchor tenant. With 60,000 square feet available on floors four, three and two, pre-leasing will commence immediately as building construction nears completion...


59e01d703e28f.image.jpg

Rendering of Lone Peak Plaza, a Class-A office building coming to Lehi. Courtesy CBC Advisors​

.
 


Back
Top