Provo MSA Development Thread


Here is what their freeway system looks like:


20091220-d4k7x8x7k3t3gnbk99muma835r.jpg


This is just before the freeway goes under the city.

Looks like there could be bicycle lanes or a rail system on the left.

University Parkway is much wider than this.
 
Here is what their freeway system looks like:


20091220-d4k7x8x7k3t3gnbk99muma835r.jpg


This is just before the freeway goes under the city.

Looks like there could be bicycle lanes or a rail system on the left.

University Parkway is much wider than this.

Point is, Zurich, despite the fact that it is a dense, urban European city with a nice transit system, needs freeways.
 
Point is, Zurich, despite the fact that it is a dense, urban European city with a nice transit system, needs freeways.

There's a few things that FHWA would point out: One, where's the Jersey Barrier?

Here's a good reason why those barriers are important:

• Video Link


Break down lanes. You need a good 12 feet on the outside and 8 feet on the inside of people to change tires, or else:

P1010002.jpg


Everybody else has to wait while you change your tire!


And finally, auxiliary lanes. You can't have two freeways meet without adding extra lanes for a couple of miles.


Add all of that up, and you pretty much get the U.S. freeway system (with a couple extra lanes thrown in :tup: )
 
:previous:

This could happen on our freeways too. This is another reasons as to why mass transit (excluding busses) is more efficient and safer.

Also, we have other highways besides the interstate that are the equivalent of their motor-ways.
 
:previous:
My point being, they only need 2-3 lanes in each direction on their freeway system.

:previous:
UB, think about this.....if we are already having traffic issues when the freeways here have four or more lanes, what makes you think having only 2-3lanes in each direction is going to work?
My point is being that UC is a pain to get around in with only ONE Freeway that has FOUR lanes in each direction. There needs to be a 2rd freeway kind of like the I-215 in Salt Lake and maybe even having a 3rd freeway like the 2100 S. freeway going East to West.
Frontrunner will help alot I think once that gets on line. :yes:
 
:previous:

I think your right about frontrunner helping. My larger point is that widening the freeway is not a lasting solution. Alternate transportation options--such as frontrunner--are.
 
You're right UB in that the widening of I-15 is not a 'Singularly' lasting solution. I look at it kind of like certain types of vehicles, such as CNG fueled. While they may not be the perfect eternal solution, they are an excellent bridge and piece of the puzzle. Of course it is critical to also include BRT, FrontRunner and hopefully a near-future TRAX/Trolley situation for Utah County. Except for the freeway over Utah Lake, I think Transit is heading in the right direction for the Southern Metro.

With the 'Utah Invented' new and hugely improved generation of tranmissions ready to role out soon for the big rigs, it is extremely critical for the Crossroads of the West to maintain and build a superb rail and freeway infrastructure system, for the hauling of a huge amount of freight from and through our Wasatch Metro.
 
Urbanboy -

Ultimately, a city widens a freeway again-and-again while it still can. At some point it becomes too expensive to purchase additional right of way, and the freeway's size becomes static. A good example would be the 210 corridor near Pasadena (which also included a LRT line in the ROW). They will never widen 210 ever again. But I'm sure glad they got five lanes each way while they still could.

I suspect that I-15 in Salt Lake County is pretty much as wide as it's ever going to get. Mountain View Corridor is, by design, able to grow to roughly I-15's size. After that, I suspect there will never again be another north-south freeway in Salt Lake County, nor any other north-south freeway widening project in Salt Lake County.
 
Spanish Fork rebuilding North Park

http://www.deseretnews.com/article/705355274/Sp-Fork-rebuilding-North-Park.html

SPANISH FORK — Construction is in full swing for a new North Park to replace the old park that was torn up to become a business-recreation area.

City leaders contracted construction of the recreation phase themselves, rather than wait on business development, which is now in a holding pattern. A dedication is scheduled for the city's 24th of July celebration. The park is just off the I-15-U.S. 6 interchange and is scheduled to be rebuilt with the state's I-15 Core project...

..
 
Last edited:
Developer addresses residents' frustration

Caleb Warnock - Daily Herald | Posted: Sunday, January 10, 2010 12:05 am |

HIGHLAND -- Days ahead of a legal appeal, Highland residents packed a hearing on Saturday morning to voice their frustrations and concerns about a high-density housing subdivision.

In December, planning commissioners gave approval to a 160-unit subdivision of 3-story townhouses, to the surprise of at least some elected officials. Commissioners hadn't wanted to give approval, but were told by city staff they had no choice.

Saying the Planning Commission acted beyond their authority, Councilman Brian Braithwaite filed a legal appeal, which will take place on Thursday, he said. It was not immediately clear what time the appeal was scheduled to take place.

On Saturday, Braithwaite and Councilwoman Kathryn Schramm hosted the meeting with residents. Developer Grant Gifford addressed the crowd, and came away with a few metaphorical bruises.

"It's frustrating," he said after the meeting. "I've never built a project where everyone is throwing rocks at me."

Braithwaite told those gathered that while the city acknowledges the concerns of residents, Highland must also be fair to developers.

"We have to be fair to the people who own this property and we have to be willing to say we accept [something] so they feel they can buy a piece of property and do something without being lynched," Braithwaite said.

One resident in the audience encouraged the others to fight "70-foot buildings and high-density housing" by demanding change from elected officials.

Full story: http://heraldextra.com/news/local/article_c6e81777-6cc2-59fd-beb0-67742816b9d8.html
 
Provo, Orem officials concerned about I-15 rebuild

Heidi Toth - Daily Herald | Posted: Monday, January 11, 2010 12:05 am


PROVO -- Interstate 15 is on the cusp of being rebuilt in Utah County, and the city that has been working on achieving this for years now has a number of concerns about how it is being done.

Provo Chief Administrative Officer Wayne Parker said the environmental impact study that was presented about two years ago showed the S-curves between the Provo Center Street and University Parkway exits straightened out, which city officials liked, as those S-curves provided a more dangerous roadway.

However, the design that has been accepted showed that UDOT could meet the federal design standards for 65-mph traffic by flattening those curves only slightly and widening the shoulders, and in the process save about $12 million, he said. The total cost of the project is $1.725 billion.

"Our view is that they could do more for very little money in the process of the whole project," Parker said, adding city officials continue to express concern but cannot do much more than that. "It is their freeway."

Full article: http://heraldextra.com/news/local/central/orem/article_4827106a-a1fa-5d71-b9d6-0e0176334829.html
 
BYU propose plan for Eagle Mountain growth

The Associated Press
Updated: 01/11/2010 03:49:10 PM MST

Eagle Mountain » Four Brigham Young University graduate students have proposed a four-point economic development plan to help the city of Eagle Mountain grow.

The students are enrolled in BYU's master of public administration program and have studied Eagle Mountain for months. Their plan focuses on accessing professional networks, coordinated planning strategies, branding and incentives to businesses.

The students proposed a plan to city leaders last week. They say focus should be placed on drawing high-tech companies interested in renewable energy to the city.

Eagle Mountain is preparing to launch a $250,000 advertising campaign aimed at boosting economic development.

City Administrator John Hendrickson says they city recognizes the need for both business and residential growth.

http://www.sltrib.com/news/ci_14161770
 
Provo, Orem officials concerned about I-15 rebuild

Heidi Toth - Daily Herald | Posted: Monday, January 11, 2010 12:05 am


PROVO -- Interstate 15 is on the cusp of being rebuilt in Utah County, and the city that has been working on achieving this for years now has a number of concerns about how it is being done.

Provo Chief Administrative Officer Wayne Parker said the environmental impact study that was presented about two years ago showed the S-curves between the Provo Center Street and University Parkway exits straightened out, which city officials liked, as those S-curves provided a more dangerous roadway.

However, the design that has been accepted showed that UDOT could meet the federal design standards for 65-mph traffic by flattening those curves only slightly and widening the shoulders, and in the process save about $12 million, he said. The total cost of the project is $1.725 billion.

"Our view is that they could do more for very little money in the process of the whole project," Parker said, adding city officials continue to express concern but cannot do much more than that. "It is their freeway."

Full article: http://heraldextra.com/news/local/central/orem/article_4827106a-a1fa-5d71-b9d6-0e0176334829.html

I'm disappointed that the builders aren't rebuilding that stretch of freeway, accidents do seem to happen there quite frequently. Also the planned Provo Center Street interchange looks a bit... weird. Isn't it possible to have a normal interchange there?
 
:previous: There is a similar interchange in Arlington, VA on I-395 and an area called Shirlington. It works well if one is paying attention. ...really paying attention.

This one looks a bit more complex (confusing).
 
Hmmm I see. I guess I'm just not used to seeing this type of interchange design. The graphic provided by UDOT makes it appear as if it is not possible to go straight across center street from one side to the other. This doesn't seem to make much sense considering that center street is the primary way to get to the west side and Utah Lake park. Is there an advantage to building it this way?
 
:previous: There is a similar interchange in Arlington, VA on I-395 and an area called Shirlington. It works well if one is paying attention. ...really paying attention.

This one looks a bit more complex (confusing).

I think it looks exactly like the Shirlington Interchange...perhaps LESS confusing though--I am on that interchange at least on a weekly basis.
 
BYU propose plan for Eagle Mountain growth

The Associated Press
Updated: 01/11/2010 03:49:10 PM MST

Eagle Mountain » Four Brigham Young University graduate students have proposed a four-point economic development plan to help the city of Eagle Mountain grow.

The students are enrolled in BYU's master of public administration program and have studied Eagle Mountain for months. Their plan focuses on accessing professional networks, coordinated planning strategies, branding and incentives to businesses.

The students proposed a plan to city leaders last week. They say focus should be placed on drawing high-tech companies interested in renewable energy to the city.

Eagle Mountain is preparing to launch a $250,000 advertising campaign aimed at boosting economic development.

City Administrator John Hendrickson says they city recognizes the need for both business and residential growth.

http://www.sltrib.com/news/ci_14161770


Nooooooooo!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! Enough ignorance already!!! Please stop the bleeding! Someone slap those students for choosing the wrong town! I hate it when polititians, public or busniness administrative people, or students of these subjects, are completely ignorant of sprawl issues, etc.!!!
 
I don't quite understand why you're upset. It looks like they're just trying to promote smart growth and sustainability, as opposed to sprawl which is probably inevitable... Besides, it was just a project, and they may have been assigned the city, or been given a strict set of parameters.
 


Back
Top