Provo MSA Development Thread


Vineyard connector, Highland Hwy. get funds

http://www.heraldextra.com/content/view/267539/17/

A windfall of cash to expand and build roads is heading for Utah County.

The Utah Transportation Commission on Wednesday approved $170 million to build a new road linking 800 North in Orem to Main Street in American Fork. The new road will run through or near the former Geneva Steel property.
In addition, another $60 million was added to $80 million already approved for the reconstruction of the Highland Highway, also known as State Road 92. Both projects will get underway this winter and are expected to be completed within two years.


.
 
County negotiates corridor plan

http://www.heraldextra.com/content/view/267486/

main.php

Photo by Marc Haddock Construction workers prepare to move a power pole at the intersection of State Street and 1100 East, American Fork (2000 West in Pleasant Grove). The improved intersection is an element of the proposed roadway from the Pleasant Grove I-15 interchange.

.
 
Cedar Hills works to create a unique Wal-Mart - To be a national first of a new Wal-Mart trend


http://www.deseretnews.com/article/1,5143,700228679,00.html

... They feel they have done that by dropping some of the merchandise from their typical stores while still incorporating a full grocery store.

This drastically cuts the size of the building - ... The 18-acre land will also feature a large amount of landscaping with a mix of both evergreen and deciduous trees.
 
UDOT gets another $25 million for S.R. 92 work - New design cuts costs, changes express lanes

http://www.deseretnews.com/article/1,5143,700229590,00.html

The original design presented to the public at open houses in early April indicated that officials planned to have express lanes running continuously from the Lehi-Highland line to I-15 in the middle of the road, with the arterial lanes to the sides. However, after receiving hundreds of resident comments at the public open house, the UDOT team changed courses...

S.R. 92 is just one road in the Access Utah County project, which aims to help the high congestion problems, especially east-west traffic issues. All four projects in Access Utah County — S.R. 92, state Route 77 in Springville, Pioneer Crossing Boulevard in Lehi and Saratoga Springs and the Vineyard Connector — are under the same project management team. That means one group of people coordinates the work on all four roads.


.
 
A Few Lehi Projects Newly Completed/Under Construction

Thanksgiving Point
xy_054DC01E-8149-48B2-BA2A-987305C36FA5__.jpg


Discovery Point
xy_E53C3A7B-4423-46A1-83C8-BD0E611562F9__.jpg


1200 East State
xy_0F65CEA6-955A-4C5E-BF5E-5F7D4260596B__.JPG


Thanksgiving Point
xy_6D9198C7-75B2-49E7-8F3A-C67169B2D18A__.JPG


Mountain Point
xy_EAF4DCFB-FC53-49C6-A09D-B91AD39FEE48__.jpg


210 No. 1200 East
xy_BB370D44-82E1-4BD5-804E-9F1F0DBDCE98__.jpg


4250 North Thanksgiving Way
xy_4A10DD3B-C5C2-4058-9DAE-01519A52AF7F__.JPG


Thanksgiving Point

xy_F6279E1C-09AA-4B11-863A-96958867C581__.jpg
 
Only that area which is designated as a business Park, and it's a pretty densly packed. The Master Plan is actually very diverse. Right now, the commercial part of the development is going gang busters, as is commercial in most places along the Wasatch, especially Northern Utah Valley and Southern Salt Lake Valley.
 
Last edited:
Im not a fan of the office park at T-giving point myself.... its a drain on all citys from Salt Lake to Provo...

I mean, its not even a city, but theyre trying to create one around it...
 
clip_image008_002.jpg


UVU's new energy-wise library praised - Huntsman says 'green' structure making history

http://www.deseretnews.com/article/1,5143,700231650,00.html?linkTrack=rotator-cvr-5550

5592106.jpg

(Jason Olson, Deseret News)

5592105.jpg

Gov. Jon Huntsman speaks to the crowd Tuesday at UVU's new library, the Digital Learning Center, on campus in Orem. the college will celebrate the opening of the building on July 1, when the school officially transitions to university status. (Jason Olson, Deseret News)

.
 
http://www.sltrib.com/news/ci_9456948

This is interesting, although, I'd rather see progress on the Frank Gehry project.


Perhaps a clue? :shrug:
"His company, G Code Ventures, plans to begin the exterior face-lift as early as September. He said the building - to be renamed "The Factory" - could look like a "luminescent cube" and resemble the coming 80-acre mixed-use Gehry development"


Frank Gehry's architectural designs in Lehi to be unveiled in August

http://www.heraldextra.com/content/view/268643/18/

20080602__Gehry-Lehi-Flash-facility.gif


1st massing model exhibited
lehiskyline2hj6.jpg


Evolution of 2nd massing model exhibited
1_474f2d6f8aeec.jpg



The public will finally be able to see what the much-anticipated Frank Gehry-designed project in Lehi will resemble when the famed American architect's artistic renderings are unveiled in early August.

"The designs will show what the hotel looks like, what the (10,000-seat) arena will look like, how retail plays in, and what some of the homes will look like," Provo entrepreneur and owner Brandt Andersen told the Daily Herald on Tuesday.


What's next

The Utah Flash will hold an open house to announce its new headquarters at "The Factory" (formerly "Open Court") on June 6 from 3 to 6 p.m. The Factory is located just off Interstate 15 in Lehi at 4425 N. Thanksgiving Way.
The Flash will hold a basketball camp featuring Coach Brad Jones June 16-20 and will also host Jazz man Ronnie Price's basketball camp Aug. 6-9.


.
 
Last edited:
Architect's vision of Lehi project to be unveiled

In early August, the public will get a better idea of Frank Gehry's vision for an ambitious 80-acre project in Lehi...

http://www.heraldextra.com/content/view/268657/18/

.

:previous:
:slob:
Just keeps getting push back. First they said the unveiling would happen in March then it got push back to April or May. It's June now and we still have to wait two more months.
Come on guys lets get this project going. :whip:
 
Springville - Historic site gives nod to builder

http://www.deseretnews.com/article/1,5143,700232614,00.html

"People have a fascination, or are drawn to old buildings, and I'm glad they were able to preserve this one," the fourth-generation Reynolds said. "I think this will be a real anchor for Springville, a real drawing point.

5592115.jpg

A 120-year-old building in Springville, newly renovated, was named after Henry T. Reynolds, its oritinal builder. The site will be home for Trivani International. (Jason Olson, Deseret News)

.
 
Delts: I just read your post about plans for the Gehry-Lehi project to be unveiled in August, which reminded me of the renderings for the Gehry's downtown Manhattan project, Beekman Place, which were unveiled last Saturday in the NY Times. What a building!

I have never seen a high-rise building that I liked more. If the Gehry-Lehi project comes close to Beekman Place, what a treasure it will be.

I don't want to get too excited because I'm cynical about the developer. Seems a little young to be taking on a project like this. But, hey, some of the best accomplishments have been done by people too young to know that they cannot do something. Go get 'em Brandt!:banana: :banana: :banana:


^^^
I'm glad you mentioned Beekman, It's been quite a while since I looked at that Gehry project. Did you mean Beekman Tower, which is in the heart of Manhattan's finacial district? Beekman Place is Gehry's project in Brooklyn. I posted some of that work over on the Utah Valley thread, along with this post.

You're right RFPCME, Anderson is a little young perhaps for this size of a development. What he might lack in experience is being made up by many who are much older and wiser behind the scenes. Every great entrepreneur, especially younger ones should have wise mentors. Frank Gehry of course, but also his team understand and have access to many people who understand the nuances of such a project better than most. The Gehry networking opportunities that come into play once Gehry is passionate about a project are enormous. From all indications, Gehry is very passionate about this project, and infact has oft-repeated that he views Traverse Ridge as a statement of his legacy. Also, as has been repeated often , "this is a project that will evolve over a probable ten year period, if the economy so dictates"
What will be extremely interesting, is the Gehry label as a selling point. Who will be those committing in the upcoming announcements? I agree with Anderson that the name will go a long way with cachet appeal. I also think that it will bring in a significant amount of first time discovery to the Wasatch Front, in many of the same ways as the olympics, particurlarly downtown. This Gehry tower effect, will reap tremendous rewards over the next ten years for our downtown skyline. I just can't be more enthuriastic about the current 'perfect storm' that continues to gather momentum for the Wasatch Front.

Beekman Place
04ouro.xlarge1.jpg

Atlantic Yards, the 22-acre Brooklyn development designed by Frank Gehry.

04ouro_group.jpg

Sketch models depicting the evolution of the Beekman Street Tower, a 75-story apartment building in Lower Manhattan, designed by Frank Gehry, who was commissioned by Bruce Ratner. Seventy proposals were produced before the design was finalized.


Gehry's Beekman Tower - Manhattan - Under Construction, May 30, 2008
2537316494_42f29cca88_o.jpg


2537316568_e13ab6d51c_o.jpg


2536498909_ed3e036835_o.jpg


2537316630_839cd01d1a_o.jpg


2537316314_0d6b0c92e3_o.jpg


Major New York Developer looks to Frank Gehry to rehabilitate his reputation

nytlogo379x64.gif


By Nicolai Ouroussoff

If Bruce Ratner's recent embrace of high-end architecture has some New Yorkers rolling their eyes, he can't be all that surprised. Not so long ago this developer's most visible cultural contribution to the city was a few kitschy theaters on 42nd Street. In Brooklyn he is known mainly as the creator of Metrotech, a complex of overblown yet banal office towers that seem to crush the life out of the city around it.

And even Mr. Ratner admits that, as a Brooklyn-based commercial builder, he once ranked at the bottom of the city's architectural food chain.

But in recent years he has sought vigorously to polish that image. His conversion began six years ago, when he joined The New York Times Company in selecting Renzo Piano — an architect known for the refinement of his buildings — to design a new Times headquarters in Midtown Manhattan. And it gained traction when Mr. Ratner handed Frank Gehry — whose celebrity has reached the point where he now has a signature jewelry line at Tiffany — the commissions for Atlantic Yards, a 22-acre project involving a basketball arena, hotel, and housing and retail spaces in Brooklyn, and Beekman Street Tower, a 75-story apartment building in Lower Manhattan. Their partnership may soon be one of the most visible on the New York skyline.

But if the Gehry-Ratner lovefest has raised an expectation of innovative design, it has also stirred unease. Few would question Mr. Gehry's talent. The question is whether he has allowed his experimental ethos to be harnessed for the sake of maximizing a developer's profits. It's also fair to ask whether Mr. Gehry and other gifted architects have made a pact with the Devil, compromising their values for the sake of ever bigger commissions. Beyond that, their collaboration points up a major change in the way cities are being built. There was a time when government took an interest in big urban planning projects. Mr. Ratner and Mr. Gehry are operating under a model by which the government plays only a marginal role. Bigger social concerns, like housing for mixed incomes, equal access to parks and transit, and vibrant communal spaces, which were once the public's purview, now increasingly fall to developers to address or not, as they see fit.

The collaboration, along with Mr. Ratner's other high-profile projects, also shows how limited the architect's role remains in such arrangements. Not so long ago American architects complained that they were shut out of the public dialogue. Today they work in a climate in which building is booming, and architecture is revered, but as an aesthetic, not a social, force.

I'm not one of those purists who argue that Mr. Gehry or Mr. Piano should snub commercial developers altogether and limit himself to hammering out projects for, say, art museums or libraries. It is at the intersection between fantasy and practicality that architects are best able to express our civilization's values. But architects will be defined by the clients they choose.

As a young architect working in Los Angeles in the 1960's and 70's, Mr. Gehry has said, he felt imprisoned by his developer clients. "I was constantly pushed around by these guys," he said in an interview. "They had a formula that you had to follow. So you couldn't do things." He found his creative voice in smaller, offbeat projects, like the Danziger Studio (1965) or the Ron Davis House in Malibu, Calif. (1972), for artists whom he knew and liked.

But by 1979 that split — between the projects that paid the bills and those that gave satisfaction — had become a torture. Working on Santa Monica Place, a low-budget mall for the Maryland-based Rouse Company, Mr. Gehry could only tweak the conventional formulas. Not that far away, he had begun tearing apart and piecing together a plain pink bungalow, remaking it as a violent collage of chain link, corrugated metal and plywood: the house that would announce that he had finally broken free.

The experience led him to lay off most of his firm. From then on he swore he would only work for clients that shared his architectural values.

Some 25 years after Santa Monica Place, Mr. Gehry says his recent decision to embrace big developers does not signal any sort of about-face. He argues that his status puts him in an entirely different position.

"They have to meet me as an equal," Mr. Gehry said simply...

..
 
Last edited:
Lehi Excitement!

Delts:

Man, I am getting excited about the Gehry-designed Traverse Ridge project. The more I learn about Gehry and see his work, the higher my excitement. Can't wait for August, or whenever the renderings appear.
 
You and me both RFPCME, Thanks so much for reminding us of the Beekman project in New York. As busy as Gehry is right now with his major projects, it's no wonder the Lehi project is taking more time to complete the final design draft.
 


Back
Top