Here's my two cents. I'm up in the air on the Utah Lake Crossing idea, on the one hand I say, if they don't want to drive so far they shouldn't move out there, but on the other had I am a realist and I understand that growth is going to occur out there anyway, especially once the Mtn View corridor is eventually extended to Nephi on the west side of Lake Mtn.
However I disagree whole heartedly on the idea of any of the crossing being a causeway, besides maybe a small section maybe a few hundred yards between bridges. I think the best way to cross the lake would be with a series of long bridges conneted by an elevated roadway(similar to the road in the keys). How about a total of 6 miles of bridge and about 2 miles of elevated highway, 1/2 mile on each end to cross over wet lands, and two half mile segments in the lake to connect a serious of three 2 mile bridges. Maybe a two mile bridges are unreasonable, I have no idea. I'm no environmentalist but I would imagine this would be the least disruptive to the eco system of the lake, besides not building anything of course. It would provide a crossing but would still allow for free flow of water and fish through out the lake. Maybe a small land mass in the middle connecting the bridges would be an option also.
It really is a dilema in my mind.
revious:
The way I see it, the MVC will do more than anything to encourage growth with it dead-ending right into 73 right at the mouth of that neck of land between the lake and Lake Mtn.
We can't stop it! At least politically we can't. Not here.
Developers + Legislature -> :cheers:
If that's the case, let's build this baby - and find a way to charge it to the developers.
I just had an idea, what if they just put a ferrie terminal at ither end of the lake?, I'd imagine it'd be alot cheaper then putting a discusting causeway, or a bridge across the lake....any thoughts?
Massive Construction Project To Widen I-15 In The Works
http://www.kutv.com/content/news/topnews/story.aspx?content_id=dc8a3f09-511e-4fda-9d25-e90e2d21a282
The plan is to widen I-15 from Sandy, where the last highway widening project left off, to Payson.
The 43-mile project would cost just under $5 billion _ or $7 billion with borrowing costs, said John Njord, executive director of the Utah Department of Transportation.
.
revious:
I can't figure this state out. We don't have enough money for the Mountain View Corridor (2 billion), yet we have little trouble worrying about a 7 billion project? :koko:
revious:
As with I-15 in Salt Lake County, I-15 in Utah County is at the very heart of congestion at this point in our growth. While the need for Mountain View will be soon upon us as critical, the need for a maximum capacity, state-of-the- art I-15 has already reached the critical point. With limited funds, I am glad to see them both expand I-15, expand critical surface streets, first implement Front Runner, and establish more Trax throughout the Metro, before they deal with Mountain View. While we are a prosperous State, funds are not unlimited, and Mountain View is further down the list at this time.
.
revious:
I think what Delts is trying to say is that Utah Country needs not only the widening of the 1-15 and the plan Mountain View on the west side, but also we need Front Runner and Trax to come down here. With ALL these in place it will better help with the congestion.
Aaaaaaaaaaaaaaaaaaaaaaaaaaaaaahhhhh! :brickwall: