Power Centre Development


^ and Aylmer is already one of the fastest growing areas in Ottawa/Gatineau.. plus there is a heavy anti-development movement in downtown Aylmer (by this I mean NO big box stores) Canadian Tire on rue Principale has tried to expand but met opposition... they actually want to plop a big box on the corner of Vanier and Allumettières, which has met heavy opposition (if you are to believe the letters to the editor in the Aylmer Bulletin).

All of these new people in Aylmer will go somewhere.. there are only so many that will stick to the local 'mom and pop' stores in the old downtown core. if they don't build it in the Plateau, they will go to Ottawa or the old city of Gatineau..the developers know this.

I'd be surprised if one of those plots isn't a new Costco..

Could Pontiac try to lure those big box retail outlets if Aylmer doesn't want them? One possible place would be Route 148 at Maple, just north of exurban development. Not sure what their official plan is though.

Vanier/Allumetieres would be too close to the Plateau development to be viable IMO. Within Aylmer, the most suitable location would be at Eardley/Allumetieres, but it still might not be the best place.

Is there a downtown Aylmer BIA for the Principale corridor?
 
Could Pontiac try to lure those big box retail outlets if Aylmer doesn't want them? One possible place would be Route 148 at Maple, just north of exurban development. Not sure what their official plan is though.

I guess potentially they could but it would be foolhardy in my opinion.

The focus of people in Aylmer is east (the Hull and Gatineau sectors) and south (Ottawa), not west. There are directions that people just don't think of to go run errands. Just seems to be human nature. I live in the central-western part of the old city of Gatineau and even though there are now some big box stores in the Buckingham area now, nobody from my area goes there. We do our stuff in our area, in Hull or in Ottawa.

A power centre with a Costco and Zellers at the corner of Labrosse and the 50 failed a few years ago because most people wouldn't naturally go north-east to run their errands.

And a power centre in Pontiac municipality (essentially Luskville and Quyon) wouldn't have much to draw on beyond Aylmer. Pontiac municipality itself has 5,000 people, and further west, Pontiac County only has 15,000 over a much larger area that extends all the way to Pembroke.
 
Vanier/Allumetieres would be too close to the Plateau development to be viable IMO.

No, believe me.. that corner is quite busy with traffic these days and I'll bet a big box on the corner would be a natural extension of the Plateau retail development, especially once the boul. du Plateau gap is connected.

On the south side of this corner they have built (in the past year); a new Shell station, chicken joint (Au Coq) and a Tim Hortons with possibly the worst queue of cars I've ever seen for such a place (the actually enlarged it to two lanes because of the <bouchon tim horton> every morning.

the 4 way stop at Vanier and McConnell desperately needs a stoplight... I've seen too many close calls at this intersection because people don't know how a 4 way stop works when you all arrive at the same time :D
 
Carleton Place Colonnade has a phase 3 planned
http://www.colonnadedevelopment.com...nd-retail-detail&cntnt01returnid=149&hl=en_US

Carleton-Place-Colonnade-Phase-3-aerial.jpg
 

They might need MTO approval there, since isn't a southern bypass being considered to go in there? That almost takes it to 10th Line. There isn't much transit-oriented development potential there, since even at the ultimate stage, it would not be in a commuter rail corridor (that would probably be about 1.5 km farther north).
 
here's the current plan (Dec. 09), dunno if the province has approved it yet

4443885014_805af6cff5_o.jpg


Highway 7 Development Area Environmental Assessment Study

The Town of Carleton Place initiated the Highway 7 Development Area Study to develop a transportation plan and municipal servicing strategy for the area in their Official Plan located south of Highway 7 and east and west of Highway 15. Within the Study Area, two (2) land use designations are found, Highway Commercial (HC) and Special Study Area (SSA).

This study began as an integrated Environmental Assessment (EA) and Official Plan Ammendment (OPA) process fulfilling the requirements of the Municipal Class Environmental and Planning Acts.

Following the second Public Open House, the Town of Carleton Place Council determined that the Official Plan Ammendment (OPA) and further land use planning for the study area would be reviewed at a later date.

This Environmental Study Report (ESR) presents, to the public and review agencies, a description of the EA study process that was undertaken and the corresponding Recommended Plan that was developed as a result of the EA process. This EA was carried out in accordance with the 'Municipal Class Environmental Assessment, 2007' Schedule for a Group "C" project.
 
application is in for an office building on the train yards lands
http://app01.ottawa.ca/postingplans/appDetails.jsf?lang=en&appId=__7YRS77

Looks like the connection to the train station is not included... :hell:

I've sent a comment to the effect that this connection needs to be a condition of the site plan approval... they can't just keep pushing it further and further into the future.

The site plan for the construction of the Trainyards office building should only be approved if the pedestrian connection to the train station is built at the same time, even if a temporary interim routing is necessary.

Given the major development at the Trainyards site (including this one), the construction of this connection cannot simply continue to be pushed back further and further into the future. Any pretense this development has as being transit-friendly will continue to be lip service until an effort is actually made to connect it to the Transitway.

From a report in 2008 (http://www.ottawa.ca/calendar/ottawa/citycouncil/occ/2008/11-12/pec/ACS2008-ICS-PLA-0215.htm):
While there is presently no bus route on Trainyards Drive, there are existing bus routes on Terminal Avenue (121) and Industrial Avenue (125), which serve the development. As part of the planning process, OC Transpo is circulated development applications for the Trainyards and will adjust their route requirements in accordance with demand. Eventually, when the office portion of the Trainyards development is constructed, there is to be access with the VIA rail site, which is presently served by the 94, 95, 101 and 102 routes.

Well... it's two years later, and this is the start of the office portion. It's time to get this done.
 
^the response is likely to be built around the rationalization that link be postponed until work starts on the LRT station in that vicinity
 
Construction Begins at Kemptville Colonnade, Including new Walmart
May 2010

Walmart Canada has started construction on its new 93,000 square foot Supercentre at the Kemptville Colonnade in Kemptville, Ontario. The Walmart opening is scheduled for January 2011.

The 40 acre site at the Highway 416 and Highway 43 Interchange will serve as the regional shopping destination for the Township of North Grenville and beyond, a trade area of approximately 80,000 people. It will become a major employment node and convenience for Eastern Ontario’s fastest growing community.

Already committed to joining Walmart are a 7,320 sq. ft. Scotiabank and a 15,000 sq. ft. Staples which will open in July 2010. Approximately 300,000 sq. ft. of national, regional and independent tenants are expected to join Walmart over the next two years with several more announcements expected shortly.


New retail plaza proposed for the SW corner of Spratt/Limebank: The proposed plaza will consits of 4 buildings havng an approximate total floor space area of 4,895 m². There will be 334 parking spaces provided. Needs rezoning.
 
Looks like an improvement to the area.

I wonder why the buildings proposed for along Carling don't actually follow the street line? Their street interface would be that much better if they actually were on the street instead of following some other, imaginary grid.

Still - better than what's there.
 
I wonder why the buildings proposed for along Carling don't actually follow the street line? Their street interface would be that much better if they actually were on the street instead of following some other, imaginary grid.

Oh come now, what has happened to your dripping cynicism?

It's obvious, really: the grid they're following allows them to carry on without having to alter the parking stalls significantly. If they did what you want, they'd have to deal with these icky angles and such that they would end up filling in with paint and would collect abandoned shopping carts.

The little cut-outs would provide an opportunity for placing larger items like trees, benches, bicycle parking and the like, as well as more outward facing windows, should they have the inclination to do so.

Still - better than what's there.

Not much of a bar to surpass, is it?

It sure is depressing when more single-storey retail pads replacing parking lot is how we measure progress. I would have liked to see at least two more storeys on these buildings so as to really start urbanizing this part of Carling in earnest.


It looks the community association wanted a larger setback of the corner building from Fairlawn so that the building there could contain a café with an outside patio. I wouldn't usually be in favour of greater setbacks but that's not a half-bad idea - were it not for the fact that the area is already saturated in coffee/donut/bagel shops. That said, a pub or restaurant with a patio might have been an option.
 
Oh come now, what has happened to your dripping cynicism?

It's obvious, really: the grid they're following allows them to carry on without having to alter the parking stalls significantly. If they did what you want, they'd have to deal with these icky angles and such that they would end up filling in with paint and would collect abandoned shopping carts.

Huh? How? I'm not suggesting making any changes to the ass-end of the buildings, just the street front.

The little cut-outs would provide an opportunity for placing larger items like trees, benches, bicycle parking and the like, as well as more outward facing windows, should they have the inclination to do so.

That can be done while still paralleling the street.

It sure is depressing when more single-storey retail pads replacing parking lot is how we measure progress. I would have liked to see at least two more storeys on these buildings so as to really start urbanizing this part of Carling in earnest.

No kidding. Perhaps whoever has the fun of ripping Carlingwood apart and putting it back together will get things right.

It looks the community association wanted a larger setback

STOP THE PRESSES!!!! A community association wanted a larger setback!!!?!?!?!? SAY IT ISN'T SO!!!!!!

(There's your dripping cynicism!)
 
Huh? How? I'm not suggesting making any changes to the ass-end of the buildings, just the street front.

But then they wouldn't be building boxes anymore... you can't build on a suburban development model if you depart from building boxes.

STOP THE PRESSES!!!! A community association wanted a larger setback!!!?!?!?!? SAY IT ISN'T SO!!!!!!

Seldom though do they actually come up with a decent reason for it, and they didn't have issues with the setbacks on Carling either (though the City imposed its own extra setbacks to allow Carling to be widened, presumably for LRT and/or bike lanes).
 