Latest development in around L.A.
Citywatch.....I'm not in real estate business.....related to it in a grand scale.
Anyway, I'm just like you hoping downtown L.A. will be a great destination
for everyone. The time for downtown L.A. is really happening now
it will take another 10 years or so for all of these to materialize.
L.A. is one giant theme park and there nothing like it maybe Tokyo
in a smaller scale but very dense with exciting nightlife galore.
Infrastructure is there now and more to come. Been in downtown L.A. for school, work and lived well over 37 years. Go Bruins.....Lakers are just eating
me up....
:yes: :yes: :yes: :yes: :yes:
In recent months development activity has been moving at a rapid clip in Downtown Los Angeles, with plans for everything from a 76-story condo tower near Pershing Square - which could become the tallest residential structure in the West - to a $4 million sushi restaurant.
While some developers have encountered troubles and downscaled or even delayed their projects, dozens of other others have been announced. In particular, Downtown's condominium market appears unfazed by the reported slowdown, with nearly 40 projects in the pipeline, including a handful set to open this year.
The apartment market is also making a strong showing with about 30 buildings being refurbished or built from the ground up. With thousands of new residents moving in, entertainment and cultural amenities are opening. A proliferation of restaurants and bars are set to hit the scene, in addition to new theaters and performance venues.
In all, Los Angeles Downtown News is tracking more than 170 projects, from Chinatown to USC to City West to the Los Angeles River. Each entry includes a grid reference to an updated, full-color Downtown Development map, which appears on page 27 (Some projects are beyond the map's boundary and are denoted by NA).
NEW PROJECTS
These projects were either announced or garnered public interest in the last three months.
655 HOPE
Demolition has begun on the $15 million adaptive reuse transformation of the high-rise at 655 S. Hope St., and construction is set to begin soon, said Larry Carr, a project manager with developer SECK Group. Plans call for the 17-story building to feature 11 floors of residential space and 80 live-work units ranging from 600 to 1,268 square feet, including five two-story "townhouse" units with floor-to-ceiling windows. The roof deck will include a wet bar. Qdoba Restaurant and Camille's Fresh Fair Restaurant occupy the ground level of the Financial District project. Van Tilburg, Banvard & Soderberg architects designed the remodeling. Carr said the condominiums will be available in early 2008. Prices start in the $400,000s. B7
751 S. SPRING ST.
According to city records, a plan for a 32-story tower at 751 S. Spring St. is headed to the Community Redevelopment Agency. The project would sit adjacent to the Chapman Building, a new condominium complex, and would contain 257 for-sale units and 9,558 square feet of ground-floor retail space. The developer of the project, Spring Street Plaza LLC, could not be reached for comment. C7
1027 WILSHIRE BLVD.
A 51-story tower at 1027 Wilshire Blvd. in City West would be the city's tallest purely residential structure. The project by 1027 Wilshire LLC, which includes Amidi Real Estate Group and Central City Development Group, would house 402 condominiums. Hamid Behdad, the former adaptive reuse czar of Los Angeles and the president of CCDG, said the project is in the plan check stage. According to the Amidi website, the development would include 875 parking spaces, have a gross area of 522,000 square feet and cost $400 million. The developer hopes to break ground this year and open in 2010. A7
1133 S. HOPE ST.
The first project in Downtown by Vancouver-based Amacon group, at 1133 S. Hope St., is in the planning stage; it has been reviewed, though not yet approved, by the city Planning Department. The developer hopes to break ground within a year on a 29-story building that would rise on what is now a parking lot across the street from South Group's Elleven. Plans call for a slender 25-story tower atop a five-story parking structure with one level underground. An outdoor area with a pool would be on the podium level. The building would have 159 units, 250 parking spaces and 6,700 square feet of retail. Neighbors in the Flower Street Lofts, immediately to the west, have protested the project, arguing that it would block views and hamper access. B9
BOTTLE ROCK
South Park's Met Lofts at 11th and Flower streets will house a wine bar. Bottle Rock co-owners Adam Fleischman and Fred Hakim plan to open the modern, 4,000-square-foot space by early fall; it will be their second location. The combination wine shop, tasting room and small plates cafe has its flagship establishment in Culver City. The lofty interior is expected to draw the Staples Center crowd as well as residents in the 264-unit complex. Wine bottles will average $50 or less. Customers can sip their wine along with cheese, charcuterie, panini and chocolate. B8
BROCKMAN MARKET
Louie Restaurant and Gourmet Market is scheduled to open in the refurbished Brockman Building at Seventh Street and Grand Avenue later this year. The 10,000-square-foot space will include a mid-priced version of gourmet grocer Dean & Deluca. Plans call for the market to be open from 6 a.m. until late evening, and it will feature homemade baked goods, specialty sauces and soups, European pastries, organic vegetables, seafood, and fresh mozzarella pizza. The restaurant will include a Milan-style coffee bar, a hot carving station, seasonal salads, and a bread and cheese area. It will sit the below the Brockman's 80 new condominiums. C7
CHAYA BRASSERIE
Chaya Brasserie, a high-end Asian fusion restaurant with glitzy locales in Venice and Beverly Hills, plans to open in City National Plaza, according to leasing officials with building owner Thomas Properties Group. The restaurant is expected to arrive by 2008 and occupy 7,000 square feet inside the twin 51-story black granite office towers at Fifth and Flower streets. Chaya is known for its Italian, Japanese and French cuisine. B6
DONALD T. STERLING HOMELESS CENTER
Donald T. Sterling, real estate mogul and owner of the Los Angeles Clippers, has moved ahead with plans to build a $50 million homeless center at the corner of Sixth and Wall streets in Skid Row. Sterling announced that he purchased the lot in April and is currently looking for partners to manage the services. While Sterling has yet to bring any specific plans to the city, he said he would like the facility to include a medical center, legal center and homeless court. There is no timeline for the project. NA
GIANNINI BUILDING
Metcom Management plans to convert the Giannini building at 649 S. Olive St. into 100 to 120 live/work condominiums. The units would range from studios to two bedrooms, a spokesperson for the developer said. The building is classified as historic and has a grand lobby with detailed ceilings and carved sculptures. Metcom plans to have retail in the basement, ground floor and mezzanine and may look for one name-brand store to fill the space. Floors two through 12 will be residential and the rooftop will have a gym and a swimming pool. Metcom Management, which also owns the AT&T building, bought the Giannini building nine years ago. C6
LUCAS ONE
After two years of planning, Hi Point Development LLC said it will break ground early next year on a seven-story complex at 1135-1147 W. Seventh St. The City West project would have 115 condominiums and 7,500 square feet of commercial space. The units would range from one bedroom to two bedrooms with a den, and the development would feature a gym, pool and spa area, along with a rooftop deck. A7
MILLION DOLLAR THEATRE
The legendary theater at Third Street and Broadway, built by Sid Grauman, is being renovated and will reopen in June, said manager Robert Voskanian. The Million Dollar Theatre, which seats more than 2,000 people, will host film screenings, movie premieres, stage performances and concerts. Voskanian said the next phase of the renovation includes replacing the carpet, drapes and some electrical repairs. The theater has been completely repainted and is awaiting a shipment of gold tiles for the lobby, which will house an upscale concession stand. The $1 million-plus refurbishment is more than halfway complete, said Voskanian. C6
MARRIOTT HOTEL RENOVATION
In March Los Angeles-based investment company Namco Capital Group, through its subsidiary LA Hotel Venture, purchased the 469-room, 1983 Downtown Marriott hotel and announced it would undertake a $30 million renovation. According to the developer, that renovation could be complete within 18 months, though it is still in the planning phase. The exterior and interior work will include a redesign of the lobby, new high-end eateries in refurbished retail space, upgraded banquet rooms, lighting and room improvements as well as the addition of a spa. The hotel will continue to operate under the Marriott name. B6
ORCHID HOTEL & OLIVIA RESTAURANT
A new boutique hotel with a Mediterranean tapas restaurant and lounge is set to open early next month at Eighth and Flower streets (across from the Gas Company Lofts). After two years of renovation, the 1920s Orchid Hotel at 819 S. Flower St. has been turned into a sleek 68-room venue. Developer Michael Rahimi of the Orchid Hotel Group is behind the project, which features modern finishes, earth tones and rooms with flat screen televisions. A health spa is set to open in spring 2008. A nightclub is scheduled to open on the lower level later this year. B7
ORIGAMI BISTRO & BAR
Located on the ground floor of the Douglas Building at 257 S. Spring St., the Origami Bistro and Bar will be a 3,367-square-foot stylish restaurant and full bar. It will be the second Origami - the original is in Valencia - and will feature steaks, sushi and martinis. An opening is expected this fall. C5
PARK FIFTH
On a parking lot just north of Pershing Square, developer David Houk plans to build what could be the tallest structure in the western United States. Park Fifth is expected to break ground in October on nearly half a block bounded by Fifth, Olive, Hill and the Subway Terminal Building. According to documents filed with the city, a building entitled for up to 76 stories and housing 750 condominiums would front Hill Street. Another 40-story high-rise at Fifth and Olive is earmarked for a five-star hotel. The 234-room facility would take up the first 15 floors of the smaller tower, with the upper levels devoted to luxury condos with hotel service. Leo A. Daly is the local architect, while New York-based Kohn Pedersen Fox Architects is handling the overall design. Completion is expected in 2010. Houk said he has funding for the project. C6
WASHINGTON MUTUAL BUILDING
Developer Kim Benjamin has announced plans to transform the Washington Mutual building at 315 W. Ninth St. into more than 100 condominiums. The adaptive reuse project is in the early planning stage. Benjamin said it would contain 40,000 square feet of office, restaurant and retail space. C8
WITMER TOWER
Hi Point Development LLC is planning a 40-story condominium tower for 1247 W. Seventh St. in City West. The project is in the entitlement stage and there is no timeline set for construction. The building would have 33 stories of residential units atop seven levels of parking. It would feature 198 for-sale units, 7,500 square feet of retail and a full gym and spa. A7
RESIDENTIAL FOR SALE
711 N. BROADWAY
Construction could start early next year on Bridge Residential Advisors' $10 million conversion of the four-story BC Plaza office building in Chinatown into 53 housing units. The condominiums would average about $500,000 and range from 525 square feet to 1,100 square feet. Los Angeles-based firm Habitar is working on the redesigns of the structure at the northwest corner of Ord Street and Broadway, said Bridge representative Jim Osterling. The update would rehabilitate BC Plaza's outdated fa蓷de, ground-floor storefronts and central plaza. The ground floor would remain retail space and the project would include a courtyard and an exercise room. The structure has approximately 130 spaces of underground parking. C3
717 NINTH
Developer Meruelo Maddux Properties broke ground earlier this year on a 35-story tower that will feature a glass curtain resembling a wall of water. Steel laying and utility relocation have been ongoing and crews began pouring the concrete for the foundation in April. The two-thirds-of-an-acre site is adjacent to the coming Ralphs supermarket. Plans call for the tower at Ninth and Flower streets to contain 214 units and a 6,800-square-foot ground-floor seafood eatery. Mambo Architecture is designing the $120 million project. Completion is slated for mid-2009. B8
756 S. SPRING ST.
Construction is underway on the 12-story edifice once known as the Great Republic Insurance Building, which developer Spring Main Development LLC is transforming. However, project architect David Gray said the market-rate, 72-unit condominium project is not scheduled to open until early 2009. The building is open on three sides - on Spring, Eighth and Main streets - and the large windows will allow more light than many adaptive reuse projects. The average unit will be 800 square feet and feature hardwood floors and exposed brick walls. A rooftop gym and Jacuzzi are also planned. A construction cost has not been announced and no retail contracts have yet been signed, said Gray. D7
808 N. SPRING ST.
Kor Group, which in 2005 purchased the 150,000-square-foot building at 808 N. Spring St. in Chinatown, has not announced any plans for the property. Kor paid $9.2 million for the structure and filed permits to turn it into as many as 123 lofts. The 10-story edifice is the tallest in Chinatown. C2
808 S. OLIVE ST.
There has been no movement on plans for New-York based Moinian Group's property at 808 S. Olive St., a spokesperson for the company said. Moinian Group, which is also developing the Figueroa Central project in South Park, has preliminary plans to build a residential complex and a boutique hotel. The land is currently a parking lot. C7
1010 WILSHIRE
Condominiums at 1010 Wilshire will go on sale in September. Developer Amir L., LLC's 16-story adaptive reuse project in a former City West office building will hold 227 units, some of which will have 1,000-square-foot terraces. The company got its start in Silicon Valley and intends to bring some technological flair to the building, installing flat-screen televisions in some common areas and pre-wiring for LCD panel displays in the units' bathrooms, a spokesperson for the project said. Killefer Flammang is the lead architect on the project. CNI, now with Perkins + Will, did interior design of the public spaces, and Bijan and Associates designed the exterior skin, which will be complete in October. Units will range from 800 to 1,200 square feet. Residents will be able to purchase custom designed furniture manufactured specifically for the building. The rooftop will have a swimming pool and an eight-and-a-half-foot glass railing to protect the area from wind. A7
2121 LOFTS
The 2121 Lofts, at 2121 E. Seventh Place, is gearing up for residents. The renovated compound of historic industrial buildings will have 78 live-work spaces in a 125,000-square-foot property. Concerto Development is working with architecture firm Killefer Flammang to update existing units with new kitchens and amenities, and to construct 19 townhomes that will be available for move-ins late this month. The lofts and townhomes range from 750 to 2,100 square feet and include mezzanines, teak and lacquer cabinetry, 18-foot ceilings and industrial loading docks that have been turned into patios. The 28,000-square-foot grounds will include a dog park, an outdoor kitchen and spa area, an entertaining area and fire pit and private herb gardens. While it awaits residents, the project has been used to host events, including a lecture by photographer Jeff Dunas and a fashion show with designer Jeffrey Sebelia. The first phase is on sale now and prices range from approximately $400,000 to $900,000. NA
BARKER BLOCK
Developer Kor Group recently announced that the Westside restaurant Urth Caf will open an outlet in the Barker Block project, on the block bounded by Hewitt, Fourth, Molino and Palmetto streets in the Arts District. The 297-unit, $75 million project, which occupies an entire block of 19th-century industrial buildings, will open its first phase at the end of 2007. The compound consists of seven structures made of a variety of materials, including wood, brick and cement. Architecture firm Nakada & Associates added double-height ceilings in some units, as well as large windows with views of the Downtown skyline or the Los Angeles River. An interior courtyard runs through the block and will feature retail space, a restaurant and a walkway. The sales office is currently open; prices start at $300,000. Sales will close on building four in the summer. F6
BARN LOFTS
Construction will begin within a month on the adaptive reuse development, said a spokesperson for El Segundo-based Rockefeller Partners Architects, which is designing the project. Developer Barn Lofts LLP is in the planning stage on the effort to turn the 39,000-square-foot brick warehouse at 940 E. Second St. in the Arts District into 40 market-rate condominiums. All the units in the former Spreckels Brothers sugar beet warehouse will be three levels and will range from 1,300 to 2,600 square feet. Interior parking will run through the center of the project with residences on either side. Loading docks will be converted to exterior entrances with balconies. F5
BRIDGE LOFTS
Mark Kriesel, who had planned to build townhouses on a lot at 120 N. Santa Fe Ave. in the Arts District, has cancelled the project and is in the process of selling the property. No new plans for the lot have been announced. F4
BROCKMAN BUILDING
Developer West Millennium Homes bought out its partner, Urban Pacific Builders, in the conversion of the 12-story Beaux Arts structure at Seventh Street and Grand Avenue. The $35 million renovation will create 80 lofts from 850 to 2,280 square feet. Penthouses will have rooftop decks. Louie Restaurant and Gourmet Market is slated to open on the ground floor in mid-2008. The restaurant will have late-night hours and is applying for exterior seating. The building, at 530 W. Seventh St., will boast a rooftop fitness center and Jacuzzis. Santa Monica-based Donald Barany Architects is designing the conversion and units are expected to go on sale in July (reservations are being accepted now). Prices will start in the low $400,000s. C7
CHAPMAN LOFTS
The Chapman Building at Eighth street and Broadway, is scheduled to open in September. The adaptive reuse project is transforming a 13-story, 94-year-old Jewelry District edifice that once housed garment manufacturers. Architect Wade Killefer is designing the restoration and will maintain the original historic hallways that are lined with marble. The building will also keep its original decorative fa蓷de, doors, columns and window trim. The $30 million project will feature a rooftop garden. The residences range from 600 to 1,300 square feet and prices will start around $300,000. C7
CITY FRONT PLACE
No groundbreaking has been announced for developer Dennis Needleman's plan to build condominiums above a strip mall at 530 E. Washington Blvd., just south of the Fashion District. Although the project has been approved by the Community Redevelopment Agency, it will not proceed for at least six months, said a company official. The project would erect three side-by-side five-story buildings above the existing structure with 136 one-, two- and three-bedroom units from 880 to 1,800 square feet. The 200,000-square-foot building would also feature a barbecue area, fitness center, pool and an adjacent eight-level parking garage with 444 spots. Yung Kao of Alhambra-based Architech Group is handling the designs. NA
CITY HOUSE AND OLYMPIC
The Titan Organization plans to build an 800,000-square-foot complex on the southeast corner of Grand Avenue and Olympic Boulevard. The $500 million development would hold two buildings: the 60-story City House, which would have a classic design and include 180 units, and the contemporary, 49-story Olympic. Residences in both structures, designed by Robertson Partners, would start at 1,200 square feet and $700,000. Titan officials have said they are seeking approvals and hope to break ground in early 2008. The towers would rise on a 58,000-square-foot lot that currently houses the Grand Avenue nightclub. The company purchased the property last year for $30 million. C8
CONCERTO
Groundwork is continuing on developer Sonny Astani's three-tower Concerto project at Figueroa and Ninth streets. The 348-unit first phase of the South Park development will include a 30-story tower and a seven-story loft building; there will be 27,500 square feet of retail. Plans call for a second 30-story tower to break ground after the first phase is complete in 2009. The buildings will wrap around a courtyard that will hold a 2,510-square-foot park. The complex will have market-rate units ranging from 750 to 2,325 square feet. Altogether, it will create 619 condominiums. B8
E2 LOFTS
RTI Properties hopes to break ground soon on the conversion of a two-story brick warehouse at 941 E. Second St. in the Arts District, said the company's Michael Donovan. Designs to turn the building into 23 industrial lofts, with two retail spaces on the ground floor, are being fine-tuned in order to meet the $16.5 million budget. The units will range from 831 to 1620 square feet with prices from $455,000 to $985,000. The project would include 15 top-level lofts accessing private gardens with views. The 33,654-square-foot effort would also feature a common rooftop garden, barbecue area and a fitness center. The condominiums are targeted for the artist community, said Donovan. F5
EIGHTH AND GRAND
There is currently no timeline for the construction of a $500 million development by Astani Enterprises that would rise on a parking lot at Eighth Street and Grand Avenue. In February, a spokesperson for the developer said the project is two years from breaking ground. Beverly Hills-based Sonny Astani announced plans last year to develop more than 800 units and 7,200 square feet of retail on the lot. The project, if it gets off the ground, would grow in four stages. C7
EL DORADO
Developer Downtown Properties broke ground early this year on the transformation of a former hotel at 416 S. Spring St. into 65 condominiums. Project manager Bill Stevenson said units in the 12-story building, which has been vacant for several decades, would range from 850 to 1,700 square feet and start at $400,000. Each condo will feature a balcony, and penthouses will have private rooftop gardens. The 1913 structure was originally named the Hotel Stowell. Stevenson said the renovations are slated to wrap by mid-2008. D6
FIGUEROA CENTRAL
According to the most recent information available, New York-based Moinian Group hopes to start construction on a $700 million plan to build two towers in late 2007. The project would include a 45-story high-rise and a 33-story tower and would rise near the Anschutz Entertainment Group's $2.5 billion L.A. Live development. Figueroa Central would include approximately 700 lofts, condominiums, townhouses, live-work units and penthouses (including approximately 150 affordable housing units). Plans also call for 250,000 square feet of retail space with a gourmet grocery store and a 40,000-square-foot health club. A boutique hotel option is also on the table for the effort at Figueroa and 11th streets (the land is currently a parking lot). Architecture firm RTKL Associates is designing the development, which would include park space and pedestrian paseos. AEG sold the land to Moinian Group for $80 million. B9
FOURTH AND ALAMEDA
Peklar Pilavjian plans to build 59 artist-in-residence lofts at Fourth and Alameda streets in the Arts District. The $30 million project would offer units in a 1923 structure that once housed the Bekins storage company. The five-story, 67,000-square-foot building will feature concrete floors, high ceilings and condominiums ranging from 650 to 1,400 square feet. The project is expected to open in mid-2008. Pilavjian said a second residential phase fronting Alameda would unfold on the same lot and would feature ground-up construction. E5
GLASS TOWER CONDOMINIUMS
Amir Kalantari said he anticipates a summer groundbreaking on a 25-story, $60 million ground-up residential glass tower at 1050 S. Grand Ave. in South Park. The owner and developer said the glass-clad high-rise designed by Destefano and Partners would hold 128 high-end condominiums ranging from 850 to more than 3,500 square feet, costing from $450,000 up to $3 million. Kalantari said the venture, which would include 23 retail spaces, would take two years to complete. C8
HAI WEI TERRACE
Developer Kim Benjamin is drawing up construction plans for his project at Figueroa Terrace and College Street. The 102-condominium Hai Wei Terrace will rise on a hill overlooking Chinatown. Benjamin said that 10% of the units will be reserved as workforce housing for local firefighters, police officers, health care officials and LAUSD employees. Plans also call for an exercise facility and a rooftop deck. The development will cost between $30 million and $35 million, Benjamin said. The units will range from around 800 to 1,400 square feet, and many will be set up for families. B3
JARDIN
Portland-based South Group plans to break ground this year on Jardin, two luxury condominium towers at 624 W. 12th St. and 1200 S. Figueroa St., and has plans for a third tower at 1241 S. Flower St. Jardin will include 648 condominiums that range from 800 to 4,500 square feet and include hardwood floors, decks and balconies. The project will also house 982 parking spaces for residents, and ground floor retail. GBD Architects and TVA Architects Inc. will collaborate on the design of the 23-story and 32-story towers, which like other South Park projects by South Group will be built to green LEED certification standards. No opening date has been announced. B9
L.A. LOFTS
Groundbreaking on a 25-story, 250-unit condominium tower in South Park has been pushed back and construction will begin early next year instead of the middle of this year, a spokesperson for Venice Development said. The 250,000-square-foot, ground-up project at Hope Street between 11th Street and Olympic Boulevard is designed by Killefer Flammang Architects and will have 10,000 square feet of retail and 400 parking spots. The company previously developed the Packard Lofts. B8
MILL STREET LOFTS
Although groundbreaking has not yet occurred, Paul Solomon of developer Linear City said plans are on track for a 16-story, 113-unit, ground-up condominium project at 673 Mateo St. in the southern portion of the Arts District. Units would start at 550 square feet and top out at 2,400 square feet. The 132,000-square-foot development would include a landscaped park with a swimming pool and jacuzzi. Solomon said an opening is planned for 2009. Behnisch Architects is handling the designs and Marina Del Rey-based Cunningham Group is the construction architect. Linear City also developed the nearby Toy Factory Lofts and Biscuit Company Lofts. E5
MURA
The five-story ground-up condominium complex at 629 E. Traction Ave. in the Arts District could open by late summer, said Pulte Home Corporation's Marketing Manager Suzanne Finne. She said only a few of the 190 one- to three-bedroom residences remain unsold. The Togawa Smith Residential-designed project includes some two-story units; floor plans range from 662 to 1,500 square feet. The 235,000-square-foot development will include a fitness center, outdoor fireplace, pool and barbecue area, as well as a water feature. E5
PAN AMERICAN LOFTS
The 111-year-old former office building at Third Street and Broadway is awaiting a certificate of occupancy and should open by summer. Developer Urban Pacific Builders' $20 million transformation put 40 condominiums into the 115,000-square-foot structure that once was home to the Mexican consulate and a Giant Penny store. Three-quarters of the units have been sold. Santa Monica-based architect Donald Barany molded the old hallways and offices into units that range from 660 to 1,250 square feet and encircle an inner courtyard. The developer kept the original dark wood staircase that spirals up the building's 10 stories. Most units have exposed brick and windows that are set deep into the walls. Penthouses feature wrought-iron staircases that lead to a mezzanine and a private rooftop patio. The 6,400-square-foot ground-floor retail space will contain an existing wedding chapel and apparel business; plans have not yet been announced for the remaining storefront space. Prices range from $365,000 to $775,000. C5
ROOSEVELT LOFTS
The Roosevelt Lofts released its second phase of condos and half have been reserved, said April Fissell, the director of sales. The $80 million conversion of the 1925 building at Flower and Seventh streets will be complete this fall. The 222-unit structure will boast 24-hour valet parking, a concierge, a rooftop pool with cabanas and a fireplace, gourmet kitchens in each unit, a fitness center and a business lounge. Prices start in the mid-$400,000s and go to more than $1 million. Each residence will include an individual, temperature-controlled compartment to store a case of wine. Developer Milbank Real Estate Services hired architecture firm Killefer Flammang to convert the 16-story former office building. A La Salsa, a sushi restaurant, a coffee shop and an upscale restaurant are slated for the ground floor. B7
ROWAN LOFTS
About half of the 206 units in Downtown Properties' Rowan Lofts have been pre-sold, and the building is scheduled to finish in the fourth quarter of 2008, said project manager Bill Stevenson. The adaptive reuse project is converting the 1912 edifice in the heart of the Historic Core into live/work units. The 280,000-square-foot, 13-story structure will offer 500- to 1,400-square-foot condos, as well as an exercise room and a lounge. Some units on lower levels will feature private patios or balconies. Residences still available range from $300,000 to more than $800,000. The development team, which includes Killefer Flammang architects, is restoring the Beaux Art structure's original terra cotta fa蓷de and marble-clad lobby, hallways and stairways. Plans also call for landscaping around the perimeter of the building that will include a fountain, barbecue areas and a 10,000-square-foot private park. D6
SB MAIN
The renovation of a 12-story, 1920s building into 190 condominiums will be ready to open this September, said developer Barry Shy. Shy purchased the property at 111 W. Seventh St., along with the 800,000-square-foot Spring Street Plaza site at 600 and 650 S. Spring St., for $75 million. The SB Main units will start at $300,000. The project will feature a rooftop pool, spa and gym. The building will have ground-floor retail. D7
SB MANHATTAN
Barry Shy is turning a 122,000-square-foot former office building at 215 W. Sixth St. into 198 condominiums. The project is scheduled to open this summer. Units are slated to range from 600 to 1,200 square feet and have metallic lacquer cabinets, granite slab countertops and washers and dryers. The Historic Core building, originally a bank, will have a rooftop pool and spa, a fitness center, a screening room and a recreation room, along with about 20,000 square feet of retail that has yet to be leased. C7
SB SPRING
SB Spring will turn a 200,000-square-foot, 12-story building at 650 S. Spring St. into 190 condominiums, said developer Barry Shy. Formerly part of the Spring Street Plaza site that Shy purchased for $75 million, the development is currently in the application process and construction should be complete in January 2008. The building will feature a rooftop pool and a gym. D7
SB TOWER
The 19-story building at 600 S. Spring St. is scheduled to open in about 18 months with 230 for-sale units, said developer Barry Shy. The adaptive reuse project is on the block bordered by Sixth, Seventh, Spring and Main streets, along with the SB Spring and SB Main structures. The condominium complex will have a rooftop pool and spa. Units will start at $400,000. D7
SHY BARRY TOWER II
Developer Barry Shy's plan to build a 35-story, ground-up structure that would hold 600 live/work condominiums is still seeking city approvals. The building at 601 S. Main St. would rise on what is now a parking lot and would complement several adaptive reuse building transformations on the same block. The tower is scheduled to have two tennis courts and a pool and spa. Shy has said that construction would begin in 2008 and should take two years. D7
SOUTH/LUMA
Luma's opening is imminent. The second phase of Portland-based South Group's South project, Luma is an $80 million development at 11th and Hope streets with 236 units in a sleek, 19-story tower. The project includes penthouses, two-story townhomes and one-, two- and three-bedroom layouts ranging from 750 to 3,400 square feet. Units start in the high $400,000s. Open areas, ceiling heights up to 11 feet and floor-to-ceiling windows characterize the "soft loft" feel. Other amenities include hardwood floors, built-in kitchens with stainless steel appliances, designer fixtures, balconies, Wi-Fi Internet access, four levels of parking and a terrace plaza/pool deck shared with Elleven, the first phase of the South development which opened last year. Luma is expected to be the second residential building in Downtown to earn a LEED certification as a green building. B9
SOUTH/EVO
The South Group broke ground on the 23-story Evo in March 2006; it is the developer's third building in the South project. The $160 million, 720,000-square-foot complex at 12th Street and Grand Avenue is expected to be complete in spring 2008; units will start in the $400,000s. The 311 condominiums with studio and one- to three-bedroom floor plans range from 730 to 3,500 square feet. The interiors will feature modern elements and designer fixtures. Other amenities will include a sixth floor terrace plaza with a pool, spa and lounge seating, and the "Two-Forty" resident lounge with viewing deck and fitness center atop the 23rd floor. Like its sister buildings Luma and Elleven, Evo is expected to earn a LEED certification from the U.S. Green Building Council. C9
TERAMACHI SENIOR HOUSING
Although move-ins were supposed to begin late last year at Teramachi Senior Housing, the developer is still waiting on a certificate of occupancy. The $42 million, 1.6-acre project at Third and San Pedro streets in Little Tokyo is nearly sold out. The new four-story building has a modern design with sleek windows, high ceilings and a pool, and caters to Japanese residents with features like a Zen garden and a koi pond in the center courtyard. Units range from $350,000 to $1 million; some have large decks, skyline views and soaking tubs. Developer Thomas Wong has included a public kitchen and lounge on each floor. VTBS designed the project, which includes 127 units and retail on the ground floor. D5
ZEN
Developer Kawada Company of America is still in the entitlement stage for the Zen tower at Third and Hill streets, and a groundbreaking could occur in 2008, said the company's Steve Westin. Plans have not changed for the 50-story structure being designed by architecture firm Skidmore, Owings & Merill. The project would hold 330 units averaging 1,040 square feet, a 60,000-square-foot fitness club and an 8,000-square-foot retail space with an upscale mini-mart and a sports cafe and lounge. There would also be about 700 parking spaces. The Community Redevelopment Agency has yet to approve the project. C5
RESIDENTIAL FOR RENT
308 E. NINTH ST.
The transformation of a 1924 warehouse at Ninth and Santee streets in the Fashion District has begun. The renovation was delayed slightly due to a conflict with the Planning Department over the rooftop penthouses, said architect and developer David Gray. The five-story building, complete with concrete columns, is 73,000 square feet and will house 38 loft apartments. The eight penthouses, all of which are two stories and include a rooftop garden, will feature large industrial windows, exposed ceilings and raised platform sleeping areas. The construction price has not been announced nor have rents been determined, but the project is expected to be complete by fall 2008, said Gray. D8
717 OLYMPIC
Houston-based Hanover Company is getting ready to pour the last level of concrete for the 26-story tower at Olympic and Figueroa in South Park. The developer broke ground on the project in late 2005 and hopes to complete it by the end of this year. Move-ins will begin by spring 2008, according to a Hanover representative. RTKL Architects is designing the project that will create 156 one- and two-bedroom market-rate apartments averaging 1,061 square feet. Amenities will include an Internet cafe, a coffee bar, a rooftop pool and a fitness center. B8
810 S. SPRING ST.
Developer National City Towers has completed more than half of a 12-story adaptive reuse project in the Historic Core. Earlier this year, the company decided the project will be rental units rather than condominiums. The 135,000-square-foot effort, which has been estimated at $17 million, will include two-story penthouses with a rooftop deck and a Jacuzzi. The 93 units will range from 650 to 1,700 square feet and have cement floors. Santa Monica-based architect David Gray is preserving many of the 1924 building's historic attributes, including the elaborate fa蓷de and lobby and the first-floor, gold-leaf embossed ceiling. There will be ground-floor retail space. Gray said the project is a little more than 60 days behind schedule and that crews are finished framing and have begun installing the electrical system. D7
ALEXANDRIA HOTEL
San Diego-based Amerland Group is in the midst of construction on the Alexandria Hotel at 501 S. Spring St. Amerland purchased the residential hotel last year for $30 million and is turning the 463 rooms into rental units. The renovation should be complete in the first quarter of next year. The Community Redevelopment Agency gave the developer $35 million in tax-exempt bonds to maintain the hotel's affordability standards and to provide 130 units to low-income residents. Amerland is sprucing up the structure and will market the apartments to a diverse range of people working in Downtown, said Jules Arthur, an Amerland partner. The developer plans to install kitchenettes in each unit and refurbish the hallways and common areas. Crews are currently renovating the rental units. The ground floor bar, Charlie O's, is under new management; the bar is now hosting comedy several nights each week. C6
ARTISAN ON SECOND
Developer Trammell Crow Residential has changed the focus of the 118-unit complex at Second and Hewitt streets in the Arts District. The $47 million development, which was originally planned as condominiums, has shifted to rental units. Kim Paperin, managing director of the project, said the move was due to the perceived strength of the rental market. She said the project should be complete by December and that crews are currently hanging drywall and completing the roof and the framing. The one- and two-bedroom units in the four-story building designed by Togawa Smith Martin Residential will range from 916 square feet to 1,770 square feet. Other amenities will include floor-to-ceiling windows, private balconies, a fitness center and spa. E5
BIXEL COURT
The five-story townhome and apartment complex is currently underway on a former parking lot at Fifth and Bixel streets in City West. The project by Bixel Court, LLP and developer Brad Gluckstein broke ground last year and is expected to be complete in the first quarter of 2008. Designed in a partnership with Santa Monica-based Aleks Istanbullu Architects and Downtown-based Birba Architects, the project will include five townhouses, 14 studio lofts and 61 one- and two-bedroom units. Amenities include a 1,500-square-foot gym with a 50-foot lap pool, and two levels of subterranean parking. Crews have begun framing floors two through five, said Gluckstein. A6
BROADWAY PLAZA LOFTS
The former Blackstone department store at 901 S. Broadway has been sold to developer Neighborhood Efforts, said former owner Wolfgang Kupka, president of Vista Affordable Housing Corp. Neighborhood Efforts has not announced any plans, but earlier designs called for 82 loft-style apartments. The conversion hit a wall before Vista sold the project. The delay had left the 89-year-old building roughly 55% complete, Kupka said. The design could remain roughly the same, he said, with 20% affordable housing, and 400- to 1,300-square-foot apartments over 9,000 square feet of ground-floor retail. C8
CANVAS L.A.
The contemporary 204-unit ground-up luxury apartment complex Canvas L.A., formerly known as Broadstone Los Angeles, is 65% complete, said project manager Andrew Colquitt of developer Broadstone. Located on a former parking lot at First Street and Beaudry Avenue in City West, the project will be a five-story structure with units ranging from 500-square-foot studios to 1,500-square-foot, three-bedroom residences. Rents will range from $1,800 to $5,000. The building will include 6,000 square feet of ground floor retail as well as a fa蓷de inspired by the Getty Museum. Colquitt said the Thomas P. Cox-designed project could wrap by November. B5
CORONITA FAMILY APARTMENTS
Construction crews continue to erect the frame of a $7.5 million ground-up complex at 204 Lucas Ave. in City West, said Meta Housing Corporate Marketing Coordinator Nancy Morris. The 100% affordable housing development, which could be completed by September, includes 21 one-, two- and three-bedroom units, ranging from 637 square feet to 1,007 square feet in one four-story building. The development will include subterranean parking, a central laundry room, a resident community room, a barbeque area, a courtyard and limited access gates, Morris said. A5
COULTER AND MANDELL BUILDINGS
Crews are putting the finishing touches on the Coulter and Mandell Buildings at 500-518 W. Seventh St., said developer George Peykar. The project will boast shops at Seventh and Olive streets, including a 7-Eleven, a food court and an upscale restaurant that is still being negotiated. Lofts will range from 900 to 1,500 square feet and five two-bedroom apartments will range from 2,300 to 3,000 square feet. Peykar expects construction on the 128,000-square-foot building, which he purchased in 2003 for $8 million, to be complete by July. He is still determining rental rates. C7
DELANO LOFTS
The $11 million conversion of the 13-story Delano Lofts, formerly known as the National Building, is complete and almost ready for move-ins, said developer Izek Shomof. The 130,000-square-foot property at 609 S. Grand Ave. in the Jewelry District features 99 loft-style apartments. Architect Mueller Design created units ranging from 800 to 1,600 square feet; rents are $2-$3 per square foot and 65% of the units are already leased. The former office building was largely vacant, aside from three ground-floor restaurants. The 1926 edifice was originally designed by Parkinson Architects. C7
EMERALD TERRACE
Developers Meta Housing and Century Housing of Culver City are planning a fall grand opening for a $22 million, four-story complex at Lucas Avenue and Emerald Street in City West. The 98,000-square-foot project will feature 85 affordable housing units from 700 to 1,000 square feet. Completion is expected by September, said Meta Housing marketing coordinator Nancy Morris. A5
GLO
Wilshire Court Development Partners is putting the finishing touches on the 201-unit first phase of the ground-up City West apartment complex and is awaiting final approvals. The building, which was expected to be renting by April, will likely open in June, said the developer. Earlier this year, the first retail element, a Starbucks, opened at the project. A 5,000-square-foot restaurant will also occupy the ground floor, although no contract has yet been signed. The initial phase, comprised of two five-story buildings connected via a pedestrian bridge over Ingraham Street (one building at Bixel and Ingraham streets and a second at Bixel Street and Wilshire Boulevard), will feature studios and one- and two-bedroom units averaging 1,010 square feet. A7
HARTFORD PROJECT
Construction could begin this summer on the $23 million affordable housing complex at 440 Hartford Ave. near San Lucas and Fourth streets in City West, said Dora Leong Gallo, CEO of nonprofit A Community of Friends. Designed by architect Killefer Flammang, the 54-unit project will contain mostly three- and four-bedroom apartment, as well as a Boys & Girls Club. NA
JEWELRY TRADES BUILDING
Developer Mideb Nominees Inc. has begun transforming the Jewelry Trades Building at Fifth and Hill streets into 62 loft apartments. Already about 30% complete, crews are now hanging drywall for the residential conversion. The nine-story, 1913 adaptive reuse property next to the Alexandria Hotel will boast one- and two-bedroom units and rent for just over $2 a square foot, according to a Mideb representative. The building features a terra cotta-colored exterior and Renaissance-influenced detailing. Originally, a first floor corridor with walls of marble and glass opened to storefronts while high-end retailers took up floors three through nine. A new Rite-Aid opened on the ground floor in April. Architects Morgan, Walls & Morgan designed the building. C6
JUDSON C. RIVES BUILDING
Renovations to the 10-story complex at 424 S. Broadway by Flatiron Development's David Gray and Phil Miller are moving forward and will likely wrap this fall. Gray said crews are now hanging drywall and finishing the historic restorations of the lobby, with its mix of marble and metal vaulted ceilings. The 60-unit adaptive reuse project, which will employ historic tax credits, is estimated at $11 million. The 74,000-square-foot former office building will include a refurbished glass canopy, landscaped rooftop gardens and a Jacuzzi. Plans also call for new balconies overlooking the Broadway theaters and the building's courtyard. The project has 60 parking spaces and rents will be between $1,100 and $3,400. C6
JW APARTMENTS
The 61-unit affordable housing project being built in City West at 1328 and 1405 James M. Wood Blvd. has changed its name from the Wood Apartments. The $20.5 million development encompasses two towers on either side of the street. The north tower is roughly 60% complete, said a representative of developer 1010 Development. The south building is 20% complete and the two components are expected to open in September and October, respectively. There will be one application process for both towers, beginning in the summer, according to 1010 Development. The 58,000-square-foot JW Apartments will incorporate 40 two-bedroom units averaging 800 square feet and 21 three-bedroom units averaging 1,259 square feet. The complex will include 1,340 square feet of office and social service space, a 1,740-square-foot community room and a 3,000-square-foot childcare center for more than 30 preschool students. Pasadena-based Ken Kurose Architects is handling the design, with Ruiz Brothers doing the construction. NA
MERCANTILE ARCADE BUILDING
Developer Fifth Street Funding encountered delays on a $20 million adaptive reuse conversion of the 1924 Arcade Building at 541 S. Spring St., and no opening date is known. According to the most recent information available, problems with a new HVAC system have postponed the project. The plan involves creating 140 market-rate apartments in dual Beaux Arts towers connected by a three-story retail arcade. Architect Killefer Flammang is handling designs in the 195,000-square-foot project. C6
METROPOLITAN BUILDING
Completion on the adaptive reuse project at 315 W. Fifth St. is now set for April 2008. South Broadway, LLC is converting the 10-story Metropolitan Building into 84 live-work apartments. El Segundo-based Rockefeller Partners Architects is designing the transformation of the Beaux Arts-style structure, which will have residences on floors three through nine. Apartments in the 163,000-square-foot edifice will range from approximately 650 to 1,500 square feet. Three penthouses will range from 1,200 to 2,300 square feet. The ground floor will remain a Fallas Paredes department store though the storefront will be modernized. Historic details, such as original tiles and windows, will be left intact. C6
NORTHWEST GATEWAY
A $55 million, mixed-income housing complex is well underway, with several stories of wood framing visible, at Second Street and Glendale Boulevard. Meta Housing Corporate Marketing Coordinator Nancy Morris said the five-story edifice in City West will include 276 studio, one- and two-bedroom apartments between 527 and 1,820 square feet and will also house a computer lab, pool, spa, dog park, fitness center and two levels of underground parking. The property contains the Belmont Tunnel, which runs beneath Bunker Hill, and was designated a Historic-Cultural Monument by the Cultural Heritage Commission. Completion is scheduled for early 2008. A5
ORSINI II
The 566-unit luxury apartment complex at 550 N. Figueroa St. is set to open in July, said a representative of developer G.H. Palmer Associates. Construction is currently underway. The ground-up project is the second phase of the three-part Orsini development. It will include a swimming pool, sun deck, spa, gymnasium, landscaping, and a basketball court; it will be connected to Orsini I by a pedestrian bridge over Figueroa Street. Rents for studio apartments will start at $1,250 while two-bedroom units will go for $1,725. B4
PIERO II
Plans are proceeding on developer G.H. Palmer Associates' 350-unit apartment complex on Sixth between Bixel and St. Paul streets in City West. A pedestrian bridge over St. Paul will connect a rooftop swimming pool deck to the already open Piero complex, also constructed by Palmer. The Piero II has been scaled down from its original design for 600 luxury units and will now include a mixed-use component. Last year the city ruled that the project must include an affordable housing element. A7
ROSSLYN LOFTS
Renovations to the Rosslyn Lofts are on hold and San Diego-based developer Amerland Group is in talks to buy the property. Owners Rob and Joseph Frontiera began converting the building at 111 W. Fifth St. - formerly known as the Frontier Hotel - to upscale apartments on a floor-by-floor basis, starting at the top, but the conversion was halted in December by the Community Redevelopment Agency. The agency's board ruled that Frontiera would be required to replace all low-income units on floors three through eight. The Frontieras had announced last year a $12 million plan to update the 1913 building. D6
SB LOFTS
Developer Barry Shy has turned his SB Lofts building at 548 S. Spring St., which had been planned for condominiums, into rental units. The $26 million conversion of the building is nearly complete, Shy said. The project will feature 184 apartments with retail on the ground floor. The units, which will feature raw concrete floors, exposed steel and high ceilings, will range from 600 to 1,200 square feet with rents from $1,200 to $2,500. D7
SIXTH STREET LOFTS
Construction is underway on this adaptive reuse project in the Arts District, according to the most recent information available. Developers Howard Klein and Matt Klein are converting a row of brick-clad warehouses at 1291-1333 E. Sixth St. into 63 live-work units and at least two retail spaces. The project will be comprised of apartments ranging from 600 to 1,800 square feet with rents starting at $1,450, said Matt Klein, and include a swimming pool, along with multiple courtyards and open green space. The building is being designed by Seattle-based Tony Bell Architecture. Move-ins will begin this fall.
TITLE GUARANTEE BUILDING
The $35 million renovation of the 1930 building is nearly complete and should be available for move-ins by July, said developer Daniel Swartz, who owns the 12-story edifice. Swartz said the 74 loft-style units will range from 800 to 4,000 square feet and feature 10- to 14-foot exposed concrete ceilings. The one-, two-, three- and four-story units will lease for $2,000 to $12,000 a month. Architecture firm Killefer Flammang designed the project, which is an update of a property originally drawn by John and David Parkinson. Developer David Houk has announced plans to turn the current surface parking lot adjacent to the Title Guarantee Building into a condo tower that could be as tall as 76 stories. C6
THE UNION
Meruelo Maddux Properties is nearing completion on a $17 million conversion at 760 S. Hill St. in the Jewelry District. The building should be ready for move-ins this summer, said company spokesman Michael Bustamante. Designed by Santa Monica-based Killefer Flammang Architects, the project will update the brick and terra cotta structure - once the headquarters of the Union Bank and Trust Company - creating 92 loft-style apartments ranging from 700 to 1,900 square feet. A restaurant and retail space are planned for the ground floor. Meruelo Maddux acquired the 12-story edifice for $12 million from Heisman Co. C7
UNION POINT
Crews broke ground in January on an $8 million, 100% affordable housing complex at 420 Union Dr. between Fourth and Sixth streets in City West. West Los Angeles-based developer Meta Housing is building a five-story structure with two- and three-bedroom units between 800 and 1,050 square feet, said marketing coordinator Nancy Morris. The development will include laundry facilities, a community room, and a barbecue/picnic area. Morris said construction is slated to wrap later this year. NA
YALE TERRACE
Framing is complete and the roof is being installed in the 55-unit affordable housing complex Yale Terrace. The Chinatown development on Yale between Alpine and Ord streets features mostly family housing, including 18 three-bedroom units and 20 four-bedroom residences (there are some smaller units on lower floors). Advanced Development and Investment is overseeing the project that involves the Community Redevelopment Agency. The complex, which will include space for social service, educational and after-school programs, could open by the end of the year. C3
MIXED USE
BLOCK 8/LITTLE TOKYO
Related Co. broke ground in April on a six-story, 230-unit luxury apartment building on San Pedro Street called the San Pedro Apartments. The building is the first phase of a Little Tokyo project known as Block 8. That six-acre site was divided into four parcels earlier this year, two of which Related sold to other developers. Thomas P. Cox Architects, which worked on Related's nearby Hikari apartments, will design the first phase of Block 8. Related's Rick Westberg said the project will feature a street-level promenade, two-way street and landscaped pedestrian pathways. The building will include two rooftop decks, a clubhouse, fitness center, pool deck and business lounge. Units will be market rate, although an affordable component may be added, Westberg said. The other parcels - one was sold to Kor Group, the other to K. Hovnanian - are still in the early planning stages. D5
BLOSSOM PLAZA
In January the Community Redevelopment Agency approved preliminary plans and $15 million in CRA funding for Blossom Plaza. The project is currently in the final design phase. Developer Bond Companies aims to transform the site of the former Little Joe's restaurant at 900 N. Broadway in Chinatown into a mixed-use project that will connect the Chinatown Metro Gold Line station to Broadway. The $144 million design consists of two residential towers by Nakada & Associates, with 169 condominiums, 10,000 square feet of retail space and a 344-car garage; roughly half of that will be available for public, paid parking. The development will also include a landscaped plaza, which will host cultural events and connect Chinatown shops to the light rail station as well as the new state park. Construction is expected to start in 2008 and take 36 months, according to a CRA spokeswoman. C2
CAPITOL MILLING BUILDING
While plans for the Capitol Milling Co. project, to be located at 1231 N. Spring St., are set, developer Steve Riboli of S&R Partners said there is not yet a date for a groundbreaking. The mixed-use project would include a 60,000-square-foot structure with 40 apartments and 25,000 square feet of retail. Riboli is working with Larry Bond, who is trying to develop the nearby mixed-use Blossom Plaza, on creating a public space to fuse the two sites. The Capitol Milling structure is a former grain mill and silo. The plans are part of the large-scale Riverview Project at the Cornfield, a development on a triangular piece of land stretching from College Street to the Los Angeles River. The four-phase effort would use the Capitol Milling Co. building as a southern anchor and include up to 300 residential units. John Deenihan, a principal with Downtown-based Rothenberg Sawasy Architects, has been tapped to handle designs. The Riboli family also owns the San Antonio Winery north of Chinatown. C2
CHINATOWN GATEWAY
Plans for the 321,000-square-foot Chinatown Gateway at Broadway and Cesar E. Chavez Avenue received final approval from the Community Redevelopment Agency in April. The proposed five-story mixed-use effort comes from Chinatown Gateway LLC, comprised of partners J.B. Allen Realty Inc., Delia LLC and Equity Residential. Plans call for 280 studio, one- and two-bedroom apartments, and 20,000 square feet of retail. Thomas P. Cox Architects is handling the designs. The project at the southern edge of Chinatown would include 581 parking spaces, most of them below ground, as well as 30,000 square feet of recreational outdoor space, a pool and a landscaped plaza along North Broadway and Cesar E. Chavez Avenue. Building permits and other city approvals must still be granted before a groundbreaking can take place, though company officials hope to begin work within six months. C3
GRAND AVENUE PLAN
The $2 billion Grand Avenue project was approved by the City Council and County Board of Supervisors in February. Now, developer Related Cos., which hopes to break ground in October, is rounding out the plan's details. The development, which will run along the top of Bunker Hill, will ultimately contain 2,600 housing units and 449,000 square feet of retail, along with a 50-story high-rise and a 25-story tower, both a part of the first phase and designed by Frank Gehry. The development will feature luxury amenities including a five-star Mandarin Oriental hotel, a high-end grocery store and health club. Related is also incorporating a 20% affordable housing element, and 30% of the construction jobs have been promised to local workers. Ground is also scheduled to break this year on a 16-acre park that will stretch from the Music Center to City Hall; schematic design for the park will begin soon. The city approved waiving future hotel bed taxes for Related; city officials have said this could equal out to more than $60 million over the life of the project. B5
HERALD EXAMINER
Downtown-based development firm Urban Partners is no longer part of the effort to build a mixed-use project on and around the former home of the Herald Examiner newspaper at 11th Street and Broadway in South Park. Instead Hearst Corp., which has owned the land for nearly 100 years, is taking the lead on the project as it moves through the approvals stage. Plans still call for 40,000 square feet of office space and 30,000 square feet of retail in the lot's historic Julia Morgan-designed Broadway building. The project also includes two new towers: a 24-story, 268-unit structure on the former press building's footprint on Hill Street; and a 37-story, 319-unit high-rise at 120 W. 12th St. No timeline has been established. Architect Brenda Levin is expected to oversee the rehab of the historic building while Thom Mayne's Morphosis will design the new towers. C9
MARKET LOFTS/RALPHS
Rising six stories above the Ralphs supermarket, the 267-condo Market Lofts is set to open in July. Developed by Lee Homes in partnership with CIM Group, the project at Ninth and Flower streets features a landscaped courtyard, swimming pool and spa, fitness center and screening room. Units range from 695 to 1,588 square feet. Market Lofts is the second phase of CIM Group's five-phase South Village project, a $500 million development bounded by Eighth, Ninth, Flower and Hope streets. Additional ground floor retail includes a Robeks, UPS Store, Quiznos and Coldstone Creamery. The 50,000-square-foot Ralphs is on track for a July opening, said a spokesperson for the store. The Fresh Fare concept will feature gourmet offerings including wine, cheese, olives, a deli and a pharmacy. B8
MEDALLION
In July, Old Bank District residents will have front row seats to the construction of their new $125 million neighbor - a mixed-use complex that will rise on the northeast corner of Fourth and Main streets. Developer Saeed Farkhondepour said he has completed the financing and the project should be finished in 18 months. The development, downscaled from an earlier vision, will include 200 rental units that average 800 square feet, 750 parking spaces and ground-floor retail. Farkhondepour said that retail on Los Angeles Street will resemble the current Toy District-style retail already in the area, while the Main Street side of the project will have shops and restaurants. M2A Architects is handling the designs. D6
METROPOLIS
The Community Redevelopment Agency recently approved the 6.3-acre, 836-unit Metropolis and it is heading through planning variance hearings. Located one block north of L.A. Live, the project has been in the works for more than a decade and developer IDS Real Estate hopes to break ground by the end of this year. Los Angeles-based IDS bought the Metropolis project - its first development in Downtown - in December 2005. The company has acquired funding for the multi-phase $1 billion effort. The property is bounded by the 110 Freeway, James M. Wood Boulevard and Eighth and Francisco streets in South Park. The 1.83-acre first phase would have 360 condominiums in a 30-story tower. The second phase would create a 42-story tower with 388 condo units. The third phase would add a 480-room hotel along with 88 residential units, and the final phase would produce a 32-story office tower. Metropolis would include 46,000 square feet of retail and a five-level parking structure. Gruen Associates and Arquitectonica are handling the designs. B8
PACIFIC STOCK EXCHANGE
Plans are being finalized for a massive 870,100-square-foot development around the Pacific Stock Exchange building on Beaudry Avenue (from First to Third streets) that will add on to the existing Stock Exchange edifice. Developer Delson Investment Co. hopes to finish the permit process by the end of the year. The adaptive reuse project would create 685 condominiums atop more than 50,000 square feet of retail with three separate structures built in three phases, said Delson's Michael Delijani. Plans call for an 18-story addition of 729,000 square feet to the existing 10-floor structure at Third Street and Beaudry Avenue. The first phase would hinge on a new five-story building with 138 units on top of subterranean parking and a 30,000-square-foot garden park, complete with a waterfall. Next would come a low-rise with 128 live/work condos and then the 18-floor addition. Nadel Architects is handling the design. The project would include a sports and entertainment facility as well as a swimming pool and tennis courts. A5
SANTEE VILLAGE
Phases two and three of developer MJW Investment's Santee Village, a 780,000-square-foot, nine-structure project on the block between Los Angeles, Maple, Seventh and Eighth streets, are currently for sale. The 64-unit Textile Building, which is part of phase three, came online last year with prices starting in the $300,000s. However, phase two is still being completed. That component is comprised of three buildings totaling 297 units, and move-ins are scheduled for later this year. Phoenix Realty Group last year joined MJW as a partner in the $92 million second phase. Phase one of the mega mixed-use project, Santee Court, came online as rental units more than three years ago. It is nearly all leased but is no longer operated by MJW, according to a Santee Court representative. The three buildings were bought 18 months ago by Texas-based L&B Realty. D7
UNIVERSITY GATEWAY
In March the City Council unanimously approved the $135