The Restaurant building is already above ground, glad they are moving quick on the Creighton Phase 2, The Dual Brand Hotel is supposed to go in the last remaining frontage at the NE corner of the property where would the High rise go?
More than 200 new hotel rooms are planned at the site of the reimagined Park Central Mall.
Plaza Companies, Holualoa Companies and Fayth Hospitality Group announced Tuesday that they will collaborate on developing a Hilton dual-branded hotel at Park Central at 3121 N. 3rd Ave. The hotels will comprise 207 rooms between Home2Suites and Tru by Hilton. Under the partnership, Plaza Cos. is the construction manager, Holualoa is the asset manager and Fayth will be the hotel operator upon completion of the hotel.
The group has selected Layton Construction as its general contractor. Bell Bank will provide construction financing. Construction is expected to begin before the end of the year.
Should break ground before the end of the year...
https://www.bizjournals.com/phoenix/news/2022/10/04/plaza-holualoa-cos-fayth-plan-midtown-hotel.html
![]()
Im surprised how short it is TBH this area cant support more hotel rooms?
I don't think other midtown hotels on Central have been killing it. I'm not sure what the demand looks like in midtown. Who is the person staying in Phoenix who doesn't want to be either at a resort, downtown, near the airport, or near where their family lives? Midtown is none of those things.
I don't think other midtown hotels on Central have been killing it. I'm not sure what the demand looks like in midtown. Who is the person staying in Phoenix who doesn't want to be either at a resort, downtown, near the airport, or near where their family lives? Midtown is none of those things.
It will be a great location, a little cheaper option than the downtown hotels and just a couple light stops away. More new restaurants be added as we speak, great centralized location. Everything AZ Denial said as well. I do wonder what is going on at that Ramada hotel on Osborn. It says it’s closed for repairs, it’s been closed for probably over 6 months now.
Temporary fencing is up for the hotel lot. Not long until another lot bites the dust. Hopefully, the 2nd phase of Creighton will start in the near future and that will pretty much take care of all the Park Central blacktop fronting Central Ave.
Can't you use the 9 story garage to the south and avoid all that?
Perhaps it could be downtown overflow as you suggest but there's a lot of new hotel rooms going in downtown so that problem is decreasing.
A lot of new hotels downtown? Help me remember:
- Home2Suites behind Footprint Center
- Moxy (Marriott) in the Luhrs Building
- The Edith behind Hanny's
Any others?
A lot of new hotels downtown? Help me remember:
- Home2Suites behind Footprint Center
- Moxy (Marriott) in the Luhrs Building
- The Edith behind Hanny's
Any others?
Fairmont Downtown/The Blue
A lot of new hotels downtown? Help me remember:
- H
- Moxy (Marriott) in the Luhrs Building
Exited to see the signs up for EoS. I didn't notice any actual construction, but it looks like it will be on the North side, perhaps upstairs? This will shave 20 minutes or more off my drive to the downtown location that is not 24 hours.