Park Central Developments


Was at Park Central today. Here is a quick update:

Creighton moving right along, up to 6 floors

Millennium has lots of equipment on site, but was locked up with no workers. Could be because of weather, very wet, and everything at this point is in the ground.

Lots of work at Zipps. Looking forward to this.
 
The entire slab is poured already and the elevator and stair cores are going up fast. It appears this might be a steel structure? The way the concrete is notched and the fact that the cores are CMU block normally means steel, not concrete. So once they start that, probably right after the cores are complete, it will go up really fast!
 
Looks like Creighton University has officially topped out...