Paris Transit Thread


5.jpg
Why are their hoods over the escalators? They have a nice, sun-lit metro station (a rarity), and then block the light when you ascend to the surface???
Why are their hoods over the escalators? They have a nice, sun-lit metro station (a rarity), and then block the light when you ascend to the surface???
I think it is to avoid to have things falling into the tracks.
The hoods begin in the area where the escalators are closer to the tracks.
2.jpg

The main issue is not suicides but littering, I think.
_______________________________________________

Tram Express Nord Tangentielle Nord
Construction work in Epinay sur Seine

Tangentielle Nord, now called Tram Express Nord is the construction of a light rail line using Tram-Train rolling stock along the northern part of the Grande Ceinture (big belt) railway line closed to passengers since 1930 and now used for freight train.
DSC81591a.jpg

A new bridge is under in construction
DSC81598a.jpg

Epinay-sur-Seine station
The station will provide a transfer between the RER C, the Tram Express Nord and the T8.
DSC81615a.jpg

We can see the new platforms
DSC81617a.jpg


DSC81619a.jpg


DSC81621a.jpg


DSC81622a.jpg

View from the RER C platforms
DSC81631a.jpg


Google Earth 3D view of the station.
The view is older than my pictures but recent enough to see some construction works.
The view is centered on the Grand Ceinture line.
You can also see the construction of the T8, there is approx 150m between the T8 platforms and Tram Express Nord and RER C stations.
EpineysurSeine.jpg
 
16px-RER.svg.png
16px-Paris_rer_A_jms.svg.png
Charles de Gaulle – Étoile
Modernization of the Champs-Elysées ticket hall
DSC82006a.jpg


DSC82010a.jpg


DSC82012a.jpg

I have seen this only today, a week before this hall had its original 1970's cladding.
 
I think they did a snazzy job with the Charles de Gaulle - Étoile ticket hall. The black ceilings and light rods remind me of the Châtelet RER concourse, though thankfully not nearly as dreary.
 
16px-RER.svg.png
16px-Paris_rer_A_jms.svg.png
Charles de Gaulle – Étoile
New screens replacing the older small ones.
DSC81661a.jpg


DSC81664a.jpg


DSC81675a.jpg


DSC81678a.jpg


Charles de Gaulle – Étoile is the first station with those screens in the central section of the RER A but some other stations located in branches have new screens for some time.

Why did they choose a black painted ceiling... it feels so dark in there... unless, of course, that was what they were going after.
It is less dark in the real life than in pictures.: yes:
 
Those LED screens are not old at all, in SNCF network it is placed instead of the LCD screens where there is no protection from the elements.
This is the conventional SNCF screen
Ecran-Infogare.jpg


Note that the screens on my previous post the IMAGE system is RATP, so it will be only in the RER A (excl Cergy/Poissy branch) and the central and southern RER B.
_____________________________________________

16px-Metro-M.svg.png
16px-Paris_m_4_jms.svg.png
Mairie de Montrouge
Opening of two new entrances with a new ticket hall.
DSC82111a.jpg


DSC82109a.jpg


DSC82105a.jpg

Mairie de Montrouge has now three ticket halls.
DSC82104a.jpg


DSC82099a.jpg


DSC82095a.jpg
 
Stairs that are open to the elements? doesn't it rain? Tho I guess rain is far easier to deal with than snow.
 
16px-Metro-M.svg.png
16px-Paris_m_1_jms.svg.png
Planned extension to Val-de-Fontenay
Three routes are proposed

#1
4.9 km (6.8km or 7.2km with tail-tracks)
3 new stations
-Les Rigollots (Fontenay-sous-Bois)
-Grands Pêchers (Montreuil)
-Val-de-Fontenay (Fontenay-sous-Bois)

112,000 daily passengers estimated for this section

Tra1.jpg


#2
5.1 km (6.9km or 7.3km with tail-tracks)
3 new stations
-Les Rigollots (Fontenay-sous-Bois)
-Fontaine (Fontenay-sous-Bois)
-Val-de-Fontenay (Fontenay-sous-Bois)

107,000 daily passengers estimated for this section

Tra2.jpg


#3
4.3km (6.1km or 6.5km with tail-tracks)
3 new stations
-Les Rigollots (Fontenay-sous-Bois)
-Verdun (Fontenay-sous-Bois)
-Val-de-Fontenay (Fontenay-sous-Bois)

62 000 daily passengers estimated for this section

Tra3.jpg


They are proposing three routes but the document is strongly in favor of the first route.
 
Auber, why are you so dirty?
2014/04/02 Fabrice Pouliquen

auber-eau-ecoule-long-nombreux-murs-lorsque-calcaire-cristallise-seche-depot-marron-peu-ragoutant-forme-alors-1548905-616x380.jpg


What disease has the Auber station? In the 9th arrondissement, the RER A station displays a bad face to the 250,000 passengers who use it every day to get to Opera, the Grands Boulevards stores or one of the many connections it provides.

Infiltration problem

Brown streaks flowing along the walls and form an unsavory foam in some places. Sometimes it's even on the ceiling that foam appears, forming "stalactites" above travelers.
A seal is placed on the ground to collect water dripping from the ceiling in the central hall of the station. "The technique is frequently" say the sellers of the station. This is not the only example of tinkering at Auber. Cables also hang from the ceiling and Karima, a saleswoman in a perfumery face access to the RER A, shows a piece of cardboard covering a hole in the wall in front of his shop.

This decay is partly due to water infiltration, a disease that affects 20% of metro and RER. "Auber station, very close to the water reservoir beneath the Opera, is particularly affected, said Jean-Christophe Archambaud responsible for policy cleaning RATP. The water then flows along the walls causing a lot of limestone crystallizes and dry. "So this brown stuff!

An elevator that smells like urine

But in Auber, dirt is not limited to these infiltrations. Cleaning is also weak. Gobitz Bernard, vice-president of the Association of transport users (AUT) Île-de-France, even took pictures to alert the STIF (Syndicat des transports d'Île-de-France). "The advertising support along the escalators between line 8 and RER station hall were covered with cups, cans and several inches of dust."

Rubbish have since disappeared. However, what does not disappear is the strong smell of urine in the elevator making the connection between the concourse and line 3. "It's a shame, say Florence, a passenger. I take the elevator for five years and this odor is still present. You have to pinch the nose during the ride. It is very painful. "

"Efforts are being made"

RATP says "is aware" of these problems. At Auber as elsewhere. "Major efforts are being made since 2006 to fight against these infiltrations, says Jean-Christophe Archambaud. Forty million will still be invested between 2014 and 2015 to seal 50 stations. "Auber station benefits. New siding, more waterproof, is being installed on the ceiling, along the corridors leading line 9 docks RER.

Driven by STIF, which strengthened its criteria for assessing the state of the network, the RATP has also deployed a new market for cleaning the subway early October. On paper, this translates to more operators in charge of cleanliness in stations, bins emptied more often or the general cleaning every month of the busiest stations. "Whose Auber", says Jean-Christophe Archambaud. "These deep cleanings are an opportunity to strip surfaces with which travelers are in contact and waxing floors docks."

But Auber obviously need more. However, the RATP has been conducting operations since late 2012 "Coups de propre" in some of the busiest stations on the network. "In that context, we are updating the painting, we repair the tiles, we install LED lighting ..." explains Jean-Christophe Archambaud. Madeleine station was right there in late December and the Charles de Gaulle station right now. "And Auber? Not on schedule yet. However, the station hosts many tourists come to do their shopping in nearby stores. As a first image of Paris, you can find much better.
http://www.20minutes.fr/paris/1340897-station-rer-auber-pourquoi-es-tu-si-sale
 
Construction starts on Paris Line 14 extension
Wednesday, June 11, 2014

A groundbreaking ceremony was held in Paris on June 11 to mark the official start of construction on the 5.8km northern extension of Line 14 from St Lazare to Mairie de Saint Ouen.

The event was attended by the mayor of Paris Mrs Anne Hidalgo, president of Ile-de-France regional council Mr Jean-Paul Huchon, Paris Transport Authority (RATP) CEO Mr Pierre Mongin and Ile-de-France transport authority (Stif) president Mr Patrick Devedjian.

The extension will relieve the heavily congested section of Line 13 north of St Lazare and will have capacity to carry up to 40,000 passengers per hour. It will interchange with RER Line C, Transilien (suburban) Line L, and light rail Line T3b, which is being extended from Porte de la Chapelle to Porte d'Asnieres.

The €1.38bn project includes the construction of four new stations, Pont Cardinet, Porte de Clichy, Clichy Saint Ouen RER and Mairie de Saint Ouen.

RATP and Stif ordered 14 MP05 rubber-tyred driverless trains from Alstom in 2012 to expand the Line 14 fleet in readiness for the opening of the extension in 2017.

Line 14 will ultimately become part of the Grand Paris express metro network and further two further new sections are planned which will increase the total length of the line to 30km, extending it north to St Denis Pleyel and south to Orly Airport via Villejuif
http://www.railjournal.com/index.php/metros/construction-starts-on-paris-line-14-extension.html?channel=542

plan_l14.jpg


Pont Cardinet
11062014154246.1.jpg


Porte de Clichy
11062014160406.2.png


Clichy Saint-Ouen RER
11062014160943.3.jpg


Mairie de Saint-Ouen
11062014160958.4.jpg


http://scope.ratp.fr/ligne-14-en-route-vers-mairie-de-saint-ouen/
 
Great news. I sense good things coming to Saint-Ouen. Hopefully they won't act as blind nimbys and take a real advantage of this big opportunity given to them, because line 14 is one of the best of the entire network.
 
The new express subway lines of Paris, with their completion dates. The map was published yesterday, following the press conference by the French prime minister on Monday.

The map shows the 208 km (129 miles) of new lines and extensions planned before 2030 (mostly in tunnels).

affae431-a452-4a18-9906-a5a3291c65a5.svg
 
16px-Tramway-T.svg.png
16px-Logo_Paris_tram_ligne6.svg.png
Opening of Tram line T6.

Châtillon-Montrouge - Robert Wagner (Vélizy)
12.4 km
21 stations
The line will later in spring 2016 being extended to Viroflay–Rive-Droite adding two new undergound stations both connected with surburban rail.

Châtillon-Montrouge
DSC96046a.jpg


DSC96055a.jpg


DSC96067a.jpg


DSC96075a.jpg

Pavé Blanc
DSC96085a.jpg

Robert Wagner
DSC96101a.jpg


DSC96115a.jpg
 
After the T6 last saturday, the 9th parisian tram line opened today.
Say hello to the T8.
Unfortunately, the opening was at 4 pm when the sun begins to set.

16px-Tramway-T.svg.png
16px-Logo_Paris_tram_ligne8.svg.png

Saint-Denis - Porte de Paris
DSC96122a.jpg


DSC96129a.jpg


DSC96139a.jpg

Pierre de Geyter
DSC96141a.jpg

Saint Denis - Gare, this where the T8 meet the T1.
The is the first crossing between two tram lines in Paris.
DSC96160a.jpg

After Delaunay-Belleville where line splits into two branches.
The switch had a dysfunction, the driver had to move it manually.
DSC96171a.jpg


DSC96179a.jpg

The branch to Villetaneuse-Université
DSC96194a.jpg

Blumenthal, notice the Z50000 train of Transilien H in the back.
DSC96196a.jpg

Les Mobiles
DSC96204a.jpg

Les Béatus, there is a junior high school here, a lot of excited kids.
DSC96209a.jpg

Rose Bertin, the center of Épinay-sur-Seine with a shopping mall.
DSC96215a.jpg


DSC96217a.jpg


DSC96221a.jpg


DSC96224a.jpg


DSC96225a.jpg

Épinay-sur-Seine - Gare
DSC96228a.jpg

Épinay-Orgemont, the last stop with an island platform.
DSC96234a.jpg
 


Back
Top