New subdivision developments


Little snipit from the Kanata Lakes community hall. Watson was their the entire 2 hours to support the residents in the fight against the redevelopment!!


https://ottawacitizen.com/news/loca...atest-intel-on-kanata-golf-course-development

Funny how he's prepared to fight along side citizens of Kanata North and even spend millions in City resources to stop this proposal, yet casts aside citizens of Vanier with no second thought when it comes to the Salvation Army mega shelter, which goes against main street guidelines and will only further sink a community already struggling. Same with Trinity at Bayview, which goes against a CDP designed only a few years ago when the Confederation Line plans were already established. More than twice the height and none of the 25% social housing (though this was partially settled with the $6+ million fund).

Absolutely insulting!!

I'm not sure you can really compare these items apples-to-apples. Plus, in Vanier there's a really vocal minority against the shelter, when really you should have been able to identify a crises brewing from years ago with the number of halfway houses and other types of small scale shelters already in Vanier who all struggle financially to maintain their buildings and residents happy. All I see are these 'shelters' which have no day-to-day programming, where tenants have nothing to do but leave their apartment and walk the streets in Vanier. Its not like the John Howards (or worse the for-profit half-way houses) selected Vanier at random to put up shop.
 
The amount of single-detached houses that break ground in Ottawa surprise me sometimes. It's almost impossible to built single-detached houses in new subdivisions in Gatineau nowadays, and that's including areas as far as Buckingham. This has also been the case for at least 5 years. I would get rid of that minimum entirely, 30% is still way too high.

Ottawa is currently growing much faster than Gatineau; this would possibly influence development patterns on both sides of the river.

In any case, by allowing suburbs to become denser, we should be reducing the cost of new housing, as developers can have a greater number of units to spread fixed costs onto.
 
The lost homes of Eastboro: Buyers angered when sale agreements terminated

James Bagnall, Ottawa Citizen
Publishing date: Jul 14, 2020 • Last Updated 12 hours ago • 4 minute read


When Michel Lebeau delivered a deposit of $46,620 to Ashcroft Homes in October 2017, he had every reason to be satisfied.

He had secured the right to a new semi-detached house in a development southeast of Blackburn Hamlet. Lebeau, a 911 dispatcher at the time, was just 23 and still living with his parents.

“I saved my ass off,” he said.

Assuming all went well with the construction, Lebeau would be able to move into his new $310,800 home on Oct. 15, 2019.

But things didn’t unfold as planned — neither for Lebeau nor for dozens of his would-be Eastboro neighbours. Ashcroft wrote Lebeau twice to inform him of delays in the deal’s close.

On July 6, Ashcroft Homes notified more than 50 buyers, including Lebeau, that it was terminating their sale agreements rather than delaying things even further. The reason, according to the letter: “Ashcroft has been unable to meet the condition regarding the servicing of the subdivision within the time permitted.”

Lebeau and other homebuyers contacted by this newspaper were stunned. Delays were one thing, but cancellation? Quite aside from the inconvenience involved, many had been anticipating significant gains on the value of their new homes even before they moved in.

That’s because each had placed a deposit just as the housing market took off. In Lebeau’s case, average residential house prices in Ottawa have jumped 35 per cent since he secured his new Ashcroft home. That house could be worth an extra $109,000 today.

Similarly with Ziad Jaber, an information technology contractor who put down a sizeable deposit in September 2018 on a $400,000 home. In his case average prices have climbed 28 per cent, which would have produced a gain of $111,000.

Instead, Ashcroft Homes said it would return the deposits “without interest.”

“As soon as we are ready to re-launch the affected homes, we will contact you to offer you an opportunity to purchase at a VIP preferred price,” the builder wrote.

Manny DiFilippo, Ashcroft’s chief financial officer, says he understands buyers’ frustration. “They had their hearts set on this and now they’re disappointed,” he said in an interview with this newspaper. “But any time you develop land, a lot of risks come into play: roadwork, servicing, environmental studies. These all need to be done.”

In this instance, a central issue appears to involve a report on something as prosaic as municipal drainage. The delays appear to reflect a severe case of regulatory paralysis.

City council four years ago hired an independent engineer, Robinson Consultants, to design a downstream drainage system. However, the city says the engineer’s report has had to wait for approvals by various regulatory agencies such as the Ministry of the Environment of an upstream stormwater management system. On top of this, according to David Ryan, the city’s program lead for municipal drainage, public works and environmental services, Ashcroft must include a large area to preserve certain habitats downstream of Eastboro and this must happen “before the drainage engineer (Robinson Consultants) can complete their report.”

But, according to Kieran Watson, the Ashcroft manager with direct responsibility for the Eastboro file, Ashcroft is waiting to receive a draft report from Robinson Consultants. Without it, Watson said, Ashcroft can’t get the necessary approval from the Ministry of the Environment to start building the next phase of Eastboro.

Robinson Consultants president Derek Potvin did not immediately respond to queries from this newspaper.

Ashcroft, which has already completed the first phase of Eastboro, has plans to build 852 more residences. About 50 buyers had put down deposits. These are the ones who have seen their sales agreements terminated.

Why didn’t Ashcroft wait longer? The company can’t leave things open-ended indefinitely, DiFilippo said, adding that the company intended to “go back and make amends” to affected buyers. “Our business is to build homes and have happy customers in those homes. It’s not in our interest to sell homes and years later cancel them. It just isn’t,” he said.

So where does this leave things? Ashcroft still intends to move ahead with the next phase of Eastboro, but obviously has to wait for that report and Ministry of Environment approval. The offer of VIP pricing for the group of 50 obviously needs to be fleshed out before those affected can decide if they want to stick with Ashcroft.

Some of the buyers are hoping to put some pressure on Ashcroft through Merovitz Potechin LLP, an Ottawa law firm they’ve approached to assess the possibility of a class-action lawsuit. The grounds for such a legal fight aren’t clear. Noah Potechin did not respond to queries from this newspaper.

Lebeau, now 26, a city employee and still living with his parents, is suffering buyer’s remorse. Because his capital was tied up with the Eastboro house, he missed out on the huge move upwards in the local residential resale market. “I can’t afford to buy anything in Ottawa now,” he said.

That’s a bit of an exaggeration. But he’s certainly much poorer than he would have been had he occupied that new home as intended last autumn.

https://ottawacitizen.com/news/loca...ted/wcm/144e95d3-51c7-468d-990d-af4816133eaa/
 
The City has drawn-up a plan for high density along Brian Coburn and the Cumberland Transitway near Mer Bleue, Frank Bender and Jeanne d'Arc.

Et9M4IiWQAEtu38


Et9NnTOXAAUJF9p

https://twitter.com/KatePorterCBC/status/1359891361386942465
 
Not too sure I understand the "high density residential" planned for Brian Coburn.. That wouldn't necessarily be close to Innes, transit, retail, etc..

I'm all for density but not sure this is the spot to do so.. Unless high density is mid-rises and not 10-18 story towers like I'm imagining they're proposing.
 
The CDP was initiated by Richcraft, owner of the land.

On the plan, residents complain that it will create traffic. Say that roads have not kept-up (Innes is a basically a highway and Brian Coburg was completed recently, and expandable, but sure, we'll go with that). Area is not walkable (well duh, that's the point of this plan).

Harder complains that Elgin was given priority over Strandherd extension. Oh, I don't know, maybe because we needed to replace century old infrastructure and sidewalks were woefully inadequate for the thousands of pedestrians?

Kitts is on board. Good opportunities. Transit is key. I agree; build the Transitway before expanding roads. Both are asphalt. Same price. But buses carry more people.

More on the whole debate:

https://twitter.com/KatePorterCBC/status/1359901781527048192
 
One major concern brought-up by a resident, and I kind of get it now that I watched the presentation, is Renaud Road. There are two 90 degree turns, which apparently cause a lot of accidents. I can't speak to that, but I can speak to the long lineups of traffic. What the lady was asking, and I think this was part of past plans, is that Brian Coburn be extended through the NCC farm fields to the first (north) 90 degree Renaud turn.

That would shift major traffic further a few hundred meters away from the Mer Bleue conservation area, so to me this would benefit the environment and the local community.
 
One major concern brought-up by a resident, and I kind of get it now that I watched the presentation, is Renaud Road. There are two 90 degree turns, which apparently cause a lot of accidents. I can't speak to that, but I can speak to the long lineups of traffic. What the lady was asking, and I think this was part of past plans, is that Brian Coburn be extended through the NCC farm fields to the first (north) 90 degree Renaud turn.

That would shift major traffic further a few hundred meters away from the Mer Bleue conservation area, so to me this would benefit the environment and the local community.

NCC doesn't support that. See this slide deck from the last public consultations. Options 5 and 7 do what this speaker was asking, but NCC isn't on board: https://documents.ottawa.ca/sites/documents/files/briancoburn_blair_environmentalassessement_en.pdf

I think the NCC is OK with options 1 and 4 (which basically just widen the Blackburn Bypass and Navan Rd) but those don't solve the issue of traffic on Renaud.
 
NCC doesn't support that. See this slide deck from the last public consultations. Options 5 and 7 do what this speaker was asking, but NCC isn't on board: https://documents.ottawa.ca/sites/documents/files/briancoburn_blair_environmentalassessement_en.pdf

I think the NCC is OK with options 1 and 4 (which basically just widen the Blackburn Bypass and Navan Rd) but those don't solve the issue of traffic on Renaud.

Apparently now they are negotiating a land swap with the NCC. I didn't get what the City would be giving up (the southern part of Renaud through the fields?)

But anyway, I get it now more than I did before. If Brian Coburn can't be extended to Renaud, any other the other options should come with the complete elimination of Renaud between Kemp and Joshua to force every car north to Innes.
 
One major concern brought-up by a resident, and I kind of get it now that I watched the presentation, is Renaud Road. There are two 90 degree turns, which apparently cause a lot of accidents. I can't speak to that, but I can speak to the long lineups of traffic. What the lady was asking, and I think this was part of past plans, is that Brian Coburn be extended through the NCC farm fields to the first (north) 90 degree Renaud turn.

That would shift major traffic further a few hundred meters away from the Mer Bleue conservation area, so to me this would benefit the environment and the local community.

It is no wonder. Renaud Road as we know it now, was three country roads cobbled together, Renaud Forced Road to the west, a piece of old Kemp Road (that used to go north to Blackburn Hamlet) and 4th Line to the east.
 
Apparently now they are negotiating a land swap with the NCC. I didn't get what the City would be giving up (the southern part of Renaud through the fields?)

But anyway, I get it now more than I did before. If Brian Coburn can't be extended to Renaud, any other the other options should come with the complete elimination of Renaud between Kemp and Joshua to force every car north to Innes.

I’d agree with this.

The city is partly to blame for attracting so much traffic to Renaud by building a roundabout at Renaud and Anderson just a couple of years ago.
 
I’d agree with this.

The city is partly to blame for attracting so much traffic to Renaud by building a roundabout at Renaud and Anderson just a couple of years ago.

The City should not have approved the development along Renaud until they had come to an agreement with the NCC to extend Brian Coburn.

This is a common theme in Ottawa (and no doubt many other places); approved any development and leave the transportation piece to the next Council. Then complain that the transportation piece wasn't done before. Rinse, lather, repeat.

Bonus: suburban Councillors complaining about essential urban infrastructure projects.
 
The City has drawn-up a plan for high density along Brian Coburn and the Cumberland Transitway near Mer Bleue, Frank Bender and Jeanne d'Arc.

Et9M4IiWQAEtu38

Excavation of proposed area to the south of Brian Coburn is already well underway... so this is not "proposal"... at least the part south of BC

I also predict huge traffic issues with "Fern Casey" to Innes connections. My inlaws live in that general area and access to Innes and other parts of Orleans is really lacking. Now it seems it will zig-zag through the new community


... and how silly is that snow dump location... when it was approved about 10 years ago everybody said it was dumb... now it will be contaminated lands
 
High density residential with a beautiful view of towering High Voltage lines just off your balcony. It would be a very energizing place to live, positively electric!
 
Judge upholds legacy agreement protecting Kanata golf course from redevelopment

Jon Willing, Ottawa Citizen
Publishing date: Feb 19, 2021 • 2 hours ago • 3 minute read


A Superior Court judge has upheld a legacy agreement protecting the Kanata Golf and Country Club from bulldozers.

ClubLink, concerned about a dwindling golf business, wants to transform the golf course into a 1,544-home subdivision with development partners Richcraft Homes and Minto Communities.

The City of Ottawa asked the court to decide if a 1981 agreement between the former city of Kanata and Campeau Corp. was still in force. The agreement preserved 40 per cent of land in the Kanata Lakes area as natural space and the protected land includes the golf course.

In a decision released Friday, Justice Marc Labrosse delivered a huge win for the Kanata Lakes residents who have been fighting ClubLink’s redevelopment plans.

Barbara Ramsay, chair of the Kanata Greenspace Protection Coalition, said the community expects ClubLink will seek an appeal of the decision, but residents were still celebrating the city’s win in Superior Court.

“I am ecstatic and very pleased, as I think most people are,” Ramsay said. “We’ve been watching ClubLink and their friends try to jam a square peg into a round hole for two years.”

ClubLink didn’t say whether it would appeal the decision.

Andrew Tamlin, chief financial officer for ClubLink Corporation ULC, said in a statement: “Having just received the decision today, we will not be responding until we have had a chance to review.”

The “40 per cent agreement,” as it has become known at city hall and in the Kanata community, said the golf course owner had to give the land to the municipality if it no longer wanted to run the golf course. Only if the municipality doesn’t want to run the golf course can the owner apply to redevelop the land.

The City of Ottawa assumes all agreements from pre-amalgamation municipalities.

ClubLink argued the old agreement no longer has teeth under a legal rule of perpetuity and the time limit for control over a property.

The judge made another important ruling in favour of the city when it comes to its obligation to run the golf course if it becomes owner. The city wouldn’t have to operate a golf course forever and it could leave the land as green space for other recreational activities, the judge said.

The judge heard the case during a virtual hearing last year.

ClubLink announced its redevelopment plans in December 2018, two weeks after Kanata North Coun. Jenna Sudds was sworn into office.

“This is amazing news and a major milestone in our fight against ClubLink to protect our Kanata North greenspace,” Sudds said in a message to her constituents posted on her website Friday.

The court case on the legacy agreement is one of two separate legal matters involving the proposed golf course redevelopment. The other is related to the planning application for the development filed at city hall.

Council has rejected the planning application, agreeing with city planners that the scale of the development would be incompatible with the surrounding community. ClubLink is appealing to the Local Planning Appeal Tribunal and a 30-day hearing is scheduled to begin on Jan. 17, 2022.

The court decision could stop the dispute over the planning application.

The Kanata Greenspace Protection Coalition, which had standing in the court hearing, quickly formed in response to ClubLink’s development plans.

The coalition fundraised to fight the proposal and, according to Ramsay, spent more than $100,000 to cover legal costs in 2020.

In explaining the success of the coalition, Ramsay credited residents with specific skill sets for coming forward to take a stand.

“The heart of every community is a community association,” Ramsay said. “Through that you have a spine to bring people together.”

[email protected]
twitter.com/JonathanWilling

https://ottawacitizen.com/news/loca...tecting-kanata-golf-course-from-redevelopment
 
Good to hear. Developers need to be put in their place once in a while. Campeau's legacy lives on.

I know this could be viewed as a loss for densification, but we have to remember this was a legal agreement between Campeau in 81' and the former City of Kanata. It's not NIMBYism, it's upholding a long-time guarantee that the golf course won't be redeveloped at the whim of profit seeking developers. (I do realize that Kanata Lakes will likely oppose any other perfectly legit development and throw their Councillor, who fought for the preservation of the golf course, under the bus if she supports any other intensification in the area, but that's a debate for another day).
 
ClubLink to appeal court ruling protecting Kanata golf club

Bruce Deachman, Ottawa Citizen
Publishing date: Mar 06, 2021 • 2 hours ago • 1 minute read


ClubLink has indicated it will appeal an Ontario Superior Court ruling last month that would prevent the company from building a subdivision on the Kanata Golf and Country Club.

“After carefully reviewing the court ruling on the matter of 7000 Campeau Drive on February 19, 2021, ClubLink has decided to exercise its right to appeal the decision,” ClubLink Corporation ULC’s chief financial officer, Andrew Tamlin, said in a statement Friday. “As this matter is now before the courts, we will not be providing further comment at this time.”

ClubLink, which wants to transform the golf course into a 1,544-home subdivision with development partners Richcraft Homes and Minto Communities, is seeking to overturn a 1981 agreement between the former city of Kanata and Campeau Corp. that preserves 40 per cent of land in the Kanata Lakes area as natural space. The protected land includes the golf course.

Justice Marc Labrosse upheld the agreement in a decision issued two weeks ago.

The “40 per cent agreement,” as it has become known at city hall and in the Kanata community, said the golf course owner had to give the land to the municipality if it no longer wanted to run the golf course. Only if the municipality doesn’t want to run the golf course can the owner apply to redevelop the land.

ClubLink argued the agreement was no longer valid under a legal rule of perpetuity and the time limit for control over a property.

Additionally, though, the judge made another significant ruling in favour of the city, saying it wouldn’t have to operate a golf course forever if it became owner of the land and could leave it as green space for other recreational activities.

With files from Jon Willing.

https://ottawacitizen.com/news/loca...peal-court-ruling-protecting-kanata-golf-club
 