[Moncton] Riverview Developments


One would think that they're going to install a tower crane at some point. Otherwise, why take down the crane that was there.

And I really like the looks of the retaining wall they built. So glad to see this building going up. That overgrown lot on the main drag wasn't pretty!

Or maybe not. Drove by the site earlier today and the crane is back up. They just changed it's location. It's now at the front of the building close to Coverdale Road. And it looks like there's a major concrete pouring operation going on today.
 
I think someone mentioned before that they plan on putting a boat launch on the Moncton side for the Fire and rescue. So they will probably have a walking area that the fire department can also drive down and tow their boat.

Yes I remember that being mentioned. In the video, it looks like they've been working on it. Good idea!
 
Yes I remember that being mentioned. In the video, it looks like they've been working on it. Good idea!

100% that work on the Moncton side of the bridge is related to the fire/rescue boat launch facility mentioned by C_Boy. If you look closely, you can actually see the ramp leading to the rivers edge on the west side of the bridge abutment. There is also a parking area there, presumably for rescue equipment and ambulances to use. A very good idea!
 
100% that work on the Moncton side of the bridge is related to the fire/rescue boat launch facility mentioned by C_Boy. If you look closely, you can actually see the ramp leading to the rivers edge on the west side of the bridge abutment. There is also a parking area there, presumably for rescue equipment and ambulances to use. A very good idea!

I looked at the video again and I see that. I hadn't notice it before, but right next to the bridge on the west side (Moncton) it looks like there is a ramp. That would be a logical access point to the water. And will it be accessed from coming onto the bridge from the Moncton side then taking an off-ramp under construction? That's what it looks like.
 
The Sparkle Dry Cleaners business at 699 Coverdale was closed about 12 years ago. Because it was a dry cleaners, it required expensive soil testing in order to receive a clean bill of health from the province, which proved to be an impediment to resale for more than a decade.

Hub Renovations spent almost a year working with the owner, local environmental company, the town, and the province to clear the title and the property and make it useable once again as a retail or commercial property.

The soil on the property has been cleared by the province.

The building itself was built as a house in 1948 and is in excellent shape, despite the awful appearance of the cladding and shingles. Unfortunately modern commercial code makes the building impractical for renovations and reuse.

The land and building or building alone has been for sale for the past six months, but the cost of moving or removing the building remained an impediment. Reluctant to smash and relegate a perfectly good structure to landfill, Hub Renovations contracted Nuttall Restorations to disassemble, save and remove the structure for reuse elsewhere.

The land will be flattened and regraded to allow a new structure to be built at this prime location.

There is now a For Sale sign on the property. Hopefully it will be purchased and we see something appealing getting built. Slowly but surely Coverdale Road is seeing infilling of it's abundance of vacant land.
 
There is now a For Sale sign on the property. Hopefully it will be purchased and we see something appealing getting built. Slowly but surely Coverdale Road is seeing infilling of it's abundance of vacant land.

The listing for the land that the recently removed dry cleaners building was on, states that the lot is 1/2 acre. The listing price is $140,000. I'm not sure how that price stacks up, but it's a great location.
 
I see that the Town of Riverview is working with the Anglophone East School Board to put in an 18 "hole" disc golf course in the woods next to Claude D Taylor School.

blakediscgolfmain.jpg

T&T photo
 
Not sure if I missed it or not but is The Current project still happening?

The Current is still on the table. Thrive Properties are in the process of building The Tides a bit farther east on Coverdale Road. After that's finished we'll likely see some action on The Current. Together they'll add 224 units less that a km. apart.
 
I took a drive through The Fairways development this evening. They're coming along nicely with The Kensington Apartments. It's also amazing to see the construction activity happening on the extension of Rosebank Crescent. Several units under construction and sold signs on other lots. They're building one story semi-detached with garages. I remember that they received the zoning approval some time ago.
m132306_1.jpg
 
I was sitting and watching how heavy the traffic on Coverdale Rd. was between 7:00 - 8:00 last night, it was non stop. I know the new bridge will help a lot, but then again there's over 100 new units currently under construction on Coverdale Rd. Not to mention The Current at 150 units coming in the future. Is traffic going to be a problem?
 
I was sitting and watching how heavy the traffic on Coverdale Rd. was between 7:00 - 8:00 last night, it was non stop. I know the new bridge will help a lot, but then again there's over 100 new units currently under construction on Coverdale Rd. Not to mention The Current at 150 units coming in the future. Is traffic going to be a problem?



Yes. :haha:
 
Not to mention a lot more growth coming in the future! I wonder when the 3rd crossing talk will heat up again.

It already should be! In all honesty though making Coverdale 4 lanes again would help immensely! Gunningsville should also be 4 lanes at least up to the traffic circle. There is also probably improvements they could make to the bridge on the Riverview side such as extending the ramp that goes onto Coverdale, although I’m sure these would be costly.

I actually think that a crossing upriver that connected somewhere near lower mountain road combined with a TCH highway exit in that area would help at lot as well. Currently there is no highway exits between Salisbury and Moncton forcing people to use Coverdale Road or Salisbury Road.

Thirdly if a bridge was built from Saint-Anselme to Bridgedale I’d be willing to be that a lot of people from Dieppe would use this road to get to Moncton as apposed to Acadie and Champlain. This would allow them to bypass the really busy section from Acadie to Assumption.
 
It already should be! In all honesty though making Coverdale 4 lanes again would help immensely! Gunningsville should also be 4 lanes at least up to the traffic circle. There is also probably improvements they could make to the bridge on the Riverview side such as extending the ramp that goes onto Coverdale, although I’m sure these would be costly.

I actually think that a crossing upriver that connected somewhere near lower mountain road combined with a TCH highway exit in that area would help at lot as well. Currently there is no highway exits between Salisbury and Moncton forcing people to use Coverdale Road or Salisbury Road.

Thirdly if a bridge was built from Saint-Anselme to Bridgedale I’d be willing to be that a lot of people from Dieppe would use this road to get to Moncton as apposed to Acadie and Champlain. This would allow them to bypass the really busy section from Acadie to Assumption.

Regarding the core of Riverview, having Coverdale Rd. 4 lanes would be a huge improvement. Last night I was sitting at Riverfront Park by the gazebo and the traffic was bumper to bumper. It was flowing, but really backed up when the Pine Glen light turned red.
 


Back
Top