This afternoon, Thrive Properties had a crew working at The Tides construction site on Coverdale Road. Looks like they're not wasting any time with this one.
The northeast corner of Pine Glen and Pinewood has been cleared in preparation for new round-about.
Do you know when they're supposed to start the work on it?
that work should be put on hold till the bridge is complete, lets not make drivers detour any more than they have to to get to the bridge.
revious:
I don't think it's so much the capacity of the bridge as it is the design of the intersections and approaches on both sides which is in question.
But, I agree with you, I think aside from the height of rush hour, there shouldn't be too much problem.
I wonder what route they are advising truck traffic to use on the way over to Riverview? In many ways, the best route would be down Wheeler Blvd to the causeway traffic circle anyway, and then up West Main Street to Vaughan Harvey Blvd. Any other approach would entail too much street traffic.
The best route for trucks coming from the TCH and Dieppe, is west on Main under the subway crossing. :runaway:
revious:
I don't think it's so much the capacity of the bridge as it is the design of the intersections and approaches on both sides which is in question.
But, I agree with you, I think aside from the height of rush hour, there shouldn't be too much problem.
I wonder what route they are advising truck traffic to use on the way over to Riverview? In many ways, the best route would be down Wheeler Blvd to the causeway traffic circle anyway, and then up West Main Street to Vaughan Harvey Blvd. Any other approach would entail too much street traffic.
I was just on my way home from work, and the traffic is already backed up almost to Pine Glen Road and it’s 2pm on a Monday. This is not going to be good.