[Moncton] Riverview Developments


Good on Moncton to do that, but I frankly don’t care what the bridge traffic looks like, I wanna know how long it’s gonna take me to get on the bridge. There is a bottleneck on the Riverview side of the bridge stretching out in all directions.

Totally with you. I actually think they should have someone monitor for a few weeks and provide some accurate estimated wait times or get some google analytics on it. Telling people Leave at 7:45 -> 15 minutes, leave at 8am > 20 minutes etc. might give people time to plan.

I'm curious how accurate google maps will be with traffic monitoring. Will report back if I find it helpful at all.
 
Totally with you. I actually think they should have someone monitor for a few weeks and provide some accurate estimated wait times or get some google analytics on it. Telling people Leave at 7:45 -> 15 minutes, leave at 8am > 20 minutes etc. might give people time to plan.

I'm curious how accurate google maps will be with traffic monitoring. Will report back if I find it helpful at all.

That’s a good idea. I’ll check google maps as well.
 
I'm a little perplexed on direction their camera is pointing. No intersection views.

Good on Moncton to do that, but I frankly don’t care what the bridge traffic looks like, I wanna know how long it’s gonna take me to get on the bridge. There is a bottleneck on the Riverview side of the bridge stretching out in all directions.
 
I'm a little perplexed on direction their camera is pointing. No intersection views.

You can get a sense of the traffic on the bridge, but it would have been good to see the intersection on the Riverview side of the bridge. A couple of cameras on that side of the river showing the traffic would have been useful.
 
You can get a sense of the traffic on the bridge, but it would have been good to see the intersection on the Riverview side of the bridge. A couple of cameras on that side of the river showing the traffic would have been useful.

Have to bring that one up with the mayor of Riverview. Dawn Arnold has done her job. :)
 
Cam is a bit "frozen" right now. Bear with us.
Generally speaking, I hear about webcam issues faster than any other IT problem. I guess it helps when hundreds are literally keeping their eyes on them. :)
 
A CAMERA IS BEING SETUP on the Riverview side and will be live in a a couple of days according to the town

The camera is live now on the town of riverview website

Its an interesting globe / 360 camera that gives multiple perspectives. Its a bit trippy since it feels like you are upside down.
 
Interesting tidbit from the agenda for the upcoming April 14th meeting of the Riverview PAC.

Thrive Properties, Gunningsville Blvd (PID 05097753), Conditional use application to permit a 67-unit multi-unit building subject to terms and conditions, and to vary landscaping requirements on a portion of the lot (File 21-417).

Another Thrive Properties project. The address is Gunningsville Blvd, but, at present, I am not sure where on Gunningsville we are talking about. There are currently no supporting documents accompanying the agenda, and I have noticed with Riverview that these documents don't show up until about a week before the meeting. We should know more by then.

Thrive does own land on Gunningsville, on the south side the street, in behind Findlay Park near Findlay Blvd (Dobson Crossing). This probably is what this request for variance is referring to, but we'll see.

dobson-render-1.jpg


dobson-crossing-render.jpg
 
Last edited:
Interesting tidbit from the agenda for the upcoming April 14th meeting of the Riverview PAC.

Thrive Properties, Gunningsville Blvd (PID 05097753), Conditional use application to permit a 67-unit multi-unit building subject to terms and conditions, and to vary landscaping requirements on a portion of the lot (File 21-417).

You gave the PID so its easy look up at http://www.snb.ca/geonb1/
This is plot behind Sobeys from Findlay to Quinn in front of the winter park.

51088983422_b694f8784b_c.jpg
 
:previous:

Thanks! I tried to look up the PID but didn't use the proper website. I will bookmark this. :tup:

Yes, this is the parcel I was thinking of, and this request for variance therefore must be for Building "2" of Dobson Crossing. They must be thinking of starting construction soon (within the year).
 
:previous:

Thanks! I tried to look up the PID but didn't use the proper website. I will bookmark this. :tup:

Yes, this is the parcel I was thinking of, and this request for variance therefore must be for Building "2" of Dobson Crossing. They must be thinking of starting construction soon (within the year).

Bookmark the Property Assessment Public Information map viewer for New Brunswick too!
It gives you the history of property sales and can be searched with PID at:
https://paol.snb.ca/
 
Thrive Properties have enough projects in the pipeline to keep them building for years to come. Just the Riverview developments alone would take a very long time to complete. It'll be good for the town as far as density and the tax base goes. And MoeMar now getting into the apartment building business also helps.

There's still a huge amount of undeveloped land in the town as well.
 


Back
Top