[Moncton] Riverview Developments


I wonder if TierToo Properties would be interested in acquiring this building/land? They've been heavy into acquisitions with the Riverview Mall and 1222 & 1234 Main Street among many other properties.

The reason that I thought about them is because of their Microtel Inn and Suites properties.(Summerside & Antigonish) Could this concept work in Riverview?
 
^^

The developer of 55 queen owns this land. I feel Riverview is in need for a walkable uptown/downtown and I feel all the development in Riverview right now is in the Findlay park area. Although I don’t feel that’s there’s any reason a person would pick a Hotel in Riverview over downtown Moncton.

I only really see hotels doing well in Riverview for things like sports tournaments. In which case itd be better to be located close to the Byron Dobson arena where you have soccer fields, hockey rink, football and baseball.

As far as having an uptown area, any hotel located on the waterfront will bring out the pitchforks unfortunately if its more than 2 stories. You will hear a lot of irrational "the views of the river will be blocked"

The only things that are in the area that is rumored would be the dobson trail, and the big sliding hill area where you have some of the winter festival activities. There is also easy access to mill creek.
 
Does anyone know what the item "26-1281 Icon Development (Phil Ripley) Terms and Conditions Application" is for? Neither of the links currently work.

https://www.townofriverview.ca/town-hall/planning-and-development

Link: https://www.townofriverview.ca/site...er 2026 26-1281 PAC Report w attachments.pdf

"Conditional Use application to allow 16 parking stalls on a separate lot." "The first two buildings have been completed in Phase 1 and Phase 2, and the applicants, Pineridge Living Ltd., now aim to move forward with the construction of the third building in Phase 3"

I'm not to sure what this means for Infinity.
 
Link: https://www.townofriverview.ca/site...er 2026 26-1281 PAC Report w attachments.pdf

"Conditional Use application to allow 16 parking stalls on a separate lot." "The first two buildings have been completed in Phase 1 and Phase 2, and the applicants, Pineridge Living Ltd., now aim to move forward with the construction of the third building in Phase 3"

I'm not to sure what this means for Infinity.

I figured when we saw the conditional use application that we'd see the 3rd building in Riverview as their next project.

It'd be nice if ICON would throw us a bone by doing something, anything on the Infinity site this fall. At this point, they're just one of the many 6 floor developers in greater Moncton. But at least the 30 floor tower is still listed on their site!

By my count there are four current developers in greater Moncton who've had public plans for buildings taller than 6 floors but unfortunately nothing has proceeded so far.
 
I figured when we saw the conditional use application that we'd see the 3rd building in Riverview as their next project.

It'd be nice if ICON would throw us a bone by doing something, anything on the Infinity site this fall. At this point, they're just one of the many 6 floor developers in greater Moncton. But at least the 30 floor tower is still listed on their site!

By my count there are four current developers in greater Moncton who've had public plans for buildings taller than 6 floors but unfortunately nothing has proceeded so far.

Trevor Richie (St. Bernard’s Square)
Thrive (Riverview @ Chocolate River Station)
Icon (Infinity Tower)
What’s the last developer?
 
I imagine Resolute Living for the tomato building.

I wasn't counting Thrive's Chocolate River Station since they are no longer active, so I guess it's actually 5.

The other was the initial Corey Craig plan to construct two high-rise residential towers: one at 15 storeys and one at 16 storeys. (Casino area)

It would be great to see even 1 or 2 of these developers build something taller than 6 floors at some point in the future. The only one that seems to be still on the table is the ICON Infinity building.
 
:previous:

I think you would almost have to include Ashford into this discussion, since any plans for Downing Street seem at least dormant (if not dead).
 
I mean Thrive is not actively building new buildings, but they are still active managing their existing buildings so I count that as active. I forgot about the tomato building. You could probably add Shannex to the list as well. They had previously proposed several tall buildings behind Mapleton Centre. And now they’re proposing the their new development behind Northwest Centre.
 
:previous:

I think you would almost have to include Ashford into this discussion, since any plans for Downing Street seem at least dormant (if not dead).

True. The city spent millions on sub grade infrastructure over several years to support the Ashford development. It just seems like too big a project to fizzle out.
 
Last edited:
I wasn't counting Thrive's Chocolate River Station since they are no longer active, so I guess it's actually 5.

The other was the initial Corey Craig plan to construct two high-rise residential towers: one at 15 storeys and one at 16 storeys. (Casino area)

It would be great to see even 1 or 2 of these developers build something taller than 6 floors at some point in the future. The only one that seems to be still on the table is the ICON Infinity building.

I'm not sure if this should count as it seemed more rumour than proposal. The others mentioned had plans presented publicly at PACs/councils.

Many of the downtown Moncton improvements linked to Ashford's plans were coming either way, it was just a matter of time. Streets raised to account for flooding, separating stormwater from sewer, plans for a new east-west street. All were part of city plans for years.
 
I'm not sure if this should count as it seemed more rumour than proposal. The others mentioned had plans presented publicly at PACs/councils.

Many of the downtown Moncton improvements linked to Ashford's plans were coming either way, it was just a matter of time. Streets raised to account for flooding, separating stormwater from sewer, plans for a new east-west street. All were part of city plans for years.

Yeah they had NB power move all the lines to the other side of the road just last year. But then this year we’ve seen nothing in terms of work downtown.
 
I figured when we saw the conditional use application that we'd see the 3rd building in Riverview as their next project.

It'd be nice if ICON would throw us a bone by doing something, anything on the Infinity site this fall. At this point, they're just one of the many 6 floor developers in greater Moncton. But at least the 30 floor tower is still listed on their site!

By my count there are four current developers in greater Moncton who've had public plans for buildings taller than 6 floors but unfortunately nothing has proceeded so far.

Pine Ridge Building #3 is looking more and more like an active construction site. Construction fencing is up and earth moving is occurring.

I am almost certain that this means that ICON has decided to finish off Pine Rige before starting on the Infinity Tower. I doubt we will see any work on the Infinity site before fall 2027 or spring 2028.
 
Pine Ridge Building #3 is looking more and more like an active construction site. Construction fencing is up and earth moving is occurring.

I am almost certain that this means that ICON has decided to finish off Pine Rige before starting on the Infinity Tower. I doubt we will see any work on the Infinity site before fall 2027 or spring 2028.

The first two buildings are probably filling up fast. The market is speaking to them.

On a different Riverview topic, what ever happened with A & W? Was that just a rumour?
 
On a different Riverview topic, what ever happened with A & W? Was that just a rumour?

No, not a rumour. This is essentially from the horse's mouth. The proponent is also building the new A&W in Emmerson Park. That project is delayed until next spring. I imagine the Riverview job has been delayed too.
 
Council requests further review of proposed Riverview turf field
Author of the article:Aditi Roy
Published Jul 15, 2026 • Last updated 18 hours ago • 2 minute read
https://tj.news/moncton-miramichi/council-requests-further-review-of-proposed-riverview-turf-field (paywall)

0715-tt-riverview-council_304300117.jpg


Well, at least town council is not rejecting this proposal out of hand. RHS is the only high school in the metro area without an artificial turf field. If this were to transpire, this would give greater Moncton a total of seven artifical turf football fields.

It just occurred to me that the Canada Games are coming up for Moncton/Saint John in 2029. This could provide a pot of money that could be used for upgrading the field and facilities at RHS. Suddenly I think that this proposal is a definite possibility.
 
Pine Ridge Building #3 is looking more and more like an active construction site.

I drove by the site this morning, and they were doing excavation work! Earth movers, dump trucks moving. I'd say they're racing to get as much work as possible done before the snow flies.

Plus, with all the residential construction going on in Riverview, they probably want to bring building #3 to market sooner rather than later.
 
Cleveland St Apartments Phase 1:


Cleveland St Apartments Phase 2:


Pineridge Phase 3:


I noticed they moved the components of their second tower crane to the back of the I Stor It location on Pine Glen Rd.
 