A large berm was constructed in the past to separate the Operation Centre from the properties on Harvard Court. This berm, which is now covered in mature growth, will remain and act as a natural buffer. The developer has indicated that fill from the underground parking garage could
be used to increase the size of the berm. Additionally, a mature tree buffer of varying width (between 0m-40m wide), will remain to the northwest of the site. Though the current property abuts R1 zoning, the plan is to subdivide each building so that it is on its own lot, and as such will not abut lower density properties, so the height limits imposed on development abutting R1
will not apply.
The remaining area of the site abutting the properties on Cleveland Ave will remain undeveloped for now, with Building 3 located approximately 50m (150ft) from the property line. There are currently no plans to develop this area, and it is uncertain whether the soil conditions would allow any intensive development. Any future modifications to the site plan beyond the three buildings currently being proposed will be subject to Council approval.