I'm Wondering if there Auto Repair Shop is also up for sale, and also The Car Store on Main Street.
No signs at either of those locations.
I'm Wondering if there Auto Repair Shop is also up for sale, and also The Car Store on Main Street.
No signs at either of those locations.
The lot at the corner of Pine Wood and Cleveland Ave. has been cleared. Any word?
Residential and commercial development planned for Riverview
Wednesday, October 15, 2014
Times and transcript
By: Eric Lewis
Location: A2
A new commercial and residential development is in the planning stages in Riverview.
Known as Dobson Landing, the proposed 22-acre project is located on vacant lands near the corner of Gunningsville Boulevard and Pine Glen Road, behind existing businesses on Pine Glen such as the Riverview Animal Hospital.
The project is expected to include roughly 100 low-to medium-density housing units,150 high-density units,seven acres of commercial land and eight acres of parkland or green space.
http://22864.vws.magma.ca/index.php?&article_id=13892
The lot at the corner of Pine Wood and Cleveland Ave. has been cleared. Any word?
Still no signs up as to what is going in there. What I did notice as I drove by there today was that the grade they are creating is a good 5 feet below street level and they are still digging down.
Another piece of land being cleared in Findlay Park. It's on Whitepine Rd. between the new apartments and the Tim's. Just checked the site plan and it looks like it should be building E, a 24 unit building.
The Town of Riverview is beginning construction of the new $16.6 million operations centre at 300 Robertson Street (east of Gunningsville Boulevard). Mayor Ann Seamans, along with members of Council and town staff, celebrated the groundbreaking for a new building to replace the current public works garage and provide a functional workspace for the parks and facilities division.
The consolidated operations centre will include an office building, fleet storage space, maintenance shops, service bays and vehicle wash areas with secure yard facilities for construction materials. Expansion potential is possible on the new 15 acre site, however the building is designed to accommodate planned growth without renovation for the next 25 years.
Establishing a new Operation Centre was identified as a strategic priority of the Town of Riverview in the 2013 Strategic Planning process. The funding plan for the new centre was approved as part of the Town of Riverview’s 2015 budget. Site excavation started in June 2015 on land owned by the Town of Riverview adjacent to Mill Creek Nature Park east of Gunningsville Boulevard. The new building will break ground as the first construction project in the Mill Creek Development Region and is scheduled to open in October, 2016.
There is a proposal for an asphalt plant that would be built on a 9-hectare piece of land off Niagara Road.
A Nova Scotia-based company, Dexter Construction, has applied to re-zone the land.
Hopefully this goes through as it will trigger upgrades to roads, and diversify the economy of Riverview.
There is a proposal for an asphalt plant that would be built on a 9-hectare piece of land off Niagara Road.
A Nova Scotia-based company, Dexter Construction, has applied to re-zone the land.
Hopefully this goes through as it will trigger upgrades to roads, and diversify the economy of Riverview.
Are there any nearby residents that would be affected???
Their biggest concern is the water table. Many homes are between the plant and the river.
There are a lot more homes there than I expected. I'm wondering where else they can drop a plant that close to Moncton with a road system already in place that wouldn't have people.
Their biggest concern is the water table. Many homes are between the plant and the river.
There are a lot more homes there than I expected. I'm wondering where else they can drop a plant that close to Moncton with a road system already in place that wouldn't have people.