Still not good enough. The homeowners in the area will continue to fight for this project to be downsized a a reasonable level or not built at all. To me 30-40 units total is the max level that I would be okay with. It’s currently zoned R1 for single family housing so this would be a large change.

Josh - I was reading the discussion section and it seems like town staff are pretty much recommending approval of this project, with certain conditions to be met.

I don't think the residents along Buckingham will be pleased though. They've had a great back yard with those woods to enjoy. They won't be happy to lose them.
 
Progress on the new dollarama in Riverview. They have the drywall all done inside as well.
51413-BB4-B2-BB-4-B9-E-8-EAB-B57-D8-AA3647-D.jpg

The new store is opening May 30th.
 
Last edited:
According to the T&T, there is a proposal before town council to convert the old lawn bowling facility adjacent to the Byron Dobson Arena into a pickleball facility with up to eight courts, eventually with a clubhouse and a dome of some form.

Projected cost is ~$200k.
 
According to the T&T, there is a proposal before town council to convert the old lawn bowling facility adjacent to the Byron Dobson Arena into a pickleball facility with up to eight courts, eventually with a clubhouse and a dome of some form.

Projected cost is ~$200k.

That would be another nice recreation investment for Riverview. Pickleball is very popular and a facility like this would see a lot of activity. With a clubhouse and a dome, it sounds like it could be a fine addition for the town.
 
According to T&T article (paywall), Federal and provincial funding will be announced for Riverview's 32 million recreation center today

Riverview project announcement coming Monday

A media advisory from Infrastructure Canada Friday said MonctonRiverview MP Ginette Petitpas Taylor will join provincial health minister (and Riverview MLA) Bruce Fitch, and Riverview Mayor
Andrew J. LeBlanc at a news conference Monday at 9 a.m., in the parking lot of the Mill Creek Nature Park in Riverview
 
The funding announcement has been made. The Riverview recreational complex is a go!

riverviewreccentre.jpg


Federal contribution - $19.9M
Provincial contribution - $6M
Municipal contribution - $13.9M
Private fundraising - $2M
Total cost - $41.9M

The complex will open in 2026.
 
Another rendering of the entrance into the new recreational centre:

riverview-rec-centre-render-1.JPG


The complex is set to include an eight-lane, 25-metre pool along with a leisure pool, a 200-metre walking track, a field house and other spaces for community activities.

According to the CBC article, construction may begin as early as October.
 
Two items of note in the upcoming August 10th PAC meeting:

1) - Yero Diallo, Diallo Developments Ltd., Trites Road (PID 00994335), conditional use application to permit a 12-unit multi-unit dwelling in an R3 zone (File 22-1487).

2) - Kaitlyn Lacelle, Thrive Properties, Bridgedale Blvd (PID 05049960), application to amend the Urban Growth Boundary on the Future land Use, Future Roads, and Zoning maps (File 22-1095).

Item 2 refers to riverviewer's post above. At present, supportive documents are not available, and likely won't be posted until about one week before the meeting. It will be interesting if these documents reveal anything more on Thrive's intentions..........

Re item one: I just noticed that this piece of property is now listed for sale. The $350,000 price includes all the plans for the 12 unit building. Hopefully a developer will step forward and take over the project.
 
It looks like MoeMar is getting ready for their next apartment building on Runneymeade Rd. They have 126 units in two 4 floor buildings so far. I wonder if they'll go bigger with the next building?
 
It looks like MoeMar is getting ready for their next apartment building on Runneymeade Rd. They have 126 units in two 4 floor buildings so far. I wonder if they'll go bigger with the next building?

I thought that was going to be another subdivision for housing? At least according to the last sight plan I had seen. It was an old one though. The lot directly across the street from the apartments by the water tower was sold in 2020 and I figured MoeMar bought that and the next building would go there.
 
I thought that was going to be another subdivision for housing? At least according to the last sight plan I had seen. It was an old one though. The lot directly across the street from the apartments by the water tower was sold in 2020 and I figured MoeMar bought that and the next building would go there.

You could be right. I was told by somebody who works for MoeMar that they have 8 apartment buildings planned. When I saw the site prep happening I just assumed that they'd be proceeding with their next units. The lot is close to the other apartment buildings, but it could also be for more houses.
 
You could be right. I was told by somebody who works for MoeMar that they have 8 apartment buildings planned. When I saw the site prep happening I just assumed that they'd be proceeding with their next units. The lot is close to the other apartment buildings, but it could also be for more houses.

I live on Coachmen and behind me on Oakfield, they started two single dwelling houses. Looks like they are going full out on new housing. Framed and enclosed the first house in a week. By the end of next week the second one will be framed. Certainly doesn't take long.
 
I live on Coachmen and behind me on Oakfield, they started two single dwelling houses. Looks like they are going full out on new housing. Framed and enclosed the first house in a week. By the end of next week the second one will be framed. Certainly doesn't take long.

Yeah, it's a pretty experienced crew that's been working together for a long time. They put out a lot of product, most of which is sold even before construction is complete.

It didn't take long for their apartment buildings to fill up. That's why I thought the site prep they're doing was for the next building. But maybe it's the next cluster of houses.
 
Yeah, it's a pretty experienced crew that's been working together for a long time. They put out a lot of product, most of which is sold even before construction is complete.

It didn't take long for their apartment buildings to fill up. That's why I thought the site prep they're doing was for the next building. But maybe it's the next cluster of houses.

On the west side of runnymeade extension that goes to bridgedale it is zoned for residential mix, the south west corner over to the end of the lot is zoned as multi dwelling so basically apartments. The south east side is zoned commercial. And the east side is zoned single family. Kind of gives you a good indication of what’s going to be going in the future.
 
On the west side of runnymeade extension that goes to bridgedale it is zoned for residential mix, the south west corner over to the end of the lot is zoned as multi dwelling so basically apartments. The south east side is zoned commercial. And the east side is zoned single family. Kind of gives you a good indication of what’s going to be going in the future.

The site prep they're doing is on the west side of Runneymeade, closer to Bridgedale Blvd. than the water tower.
 