chris08876
NYC/NJ/Miami-Dade
This was recommended for approval via the Development Review Board. 348 units!
===================Hyatt and Gencom have revealed plans for a three-tower development on the Miami River, including a supertall tower.
The supertall tower is planned to rise to exactly 1,049 feet – the maximum permitted by Miami’s zoning rules, according to a representative of the joint venture.
Representatives of the development team are in a attendance at a Miami River Commission subcommittee meeting today, where they are presenting the plans.
The Hyatt-Gencom development is proposed to include:
1,806 apartments (including 264 serviced apartments)
615-room Hyatt Regency hotel
190,000 square feet of Class A meeting space
20,000 square feet of coworking space
12,000 square feet of food and beverage/retail in the podium
Destination restaurant and lounge perched 700 feet over the city, located in a skybridge linking the two shorter towers
50,000+ square feet of new public space
Rebuilt riverwalk spanning 480 feet, completing a key missing connection
Covered pedestrian bridge connection to Metromover’s Knight Center Station
1,100 parking spaces
Two of the towers are proposed to rise 61 stories.
Tower three is planned to become the supertall, with 860 apartments. It becomes one of at least ten supertall proposals in Miami.
The existing Hyatt Regency and James L. Knight Center will be replaced for the new development.
Redevelopment of the complex will also allow for a large and reconfigured arrival and drop-off area, improving access and traffic flow.
Hyatt and Gencom are currently negotiating with City of Miami staff on a lease extension for the property to 99 years from an existing 45 year deal. They then plan to ask the City Commission to place both the revised lease and the proposed development on the November 2022 ballot for a referendum.
Based in Coconut Grove, Gencom is an international owner and developer of luxury hotel and residential properties, with a real estate portfolio valued above $3 billion. Hyatt is regarded by many as being the best major hotel management company.
If the referendum passes, construction is expected to begin in 2025.
=================Another development allowing short-term rentals has launched sales, this time in North Miami Beach.
Nexo Residences is planned to be built at 13899 Biscayne Boulevard.
The property will include 254 residences, which will be delivered fully finished and turnkey.
Prices start in the $400,000s, with units sizes ranging from about 525 to 2,190 interior square feet.
Owners will be permitted to rent their units on a short-term basis without restrictions.
Fortune International Group and Blue Road are the developers.
Frankel Benayoun Architects is designing the project, with consultation from architect Carlos Ott. Interiors, common areas, and landscaping are being designed by Urban Robot.
===================Plans have been submitted to build Motorsport Tower in Miami, next to a new train station planned along the Brightline tracks.
Motorsport Tower is proposed to rise 12 stories include:
206,352 square feet of office
79,676 square feet of commercial/retail
390 parking spaces
The newly planned Brightline commuter rail station is directly adjacent to the site, according to a letter from the project architect. The property is also a part of the Magic City Innovation District.
In a letter to the UDRB, project architect DB Lewis wrote that his design for the tower would be “instantly recognizable” and “will substantially enhance the surrounding urban context with its architecture and pedestrian friendly uses.”
Imperial Capital Group, LLC is the developer.
Miami’s Urban Development Review Board is scheduled to have a hearing on the proposal on May 18.
===================An Urban Development Review Board (UDRB) application has been submitted for review and approval in regard to The Ursa, a 15-story office building proposed for development at 30 Northeast 29th Street in Miami’s Design District. Featuring world-class architecture from design firm Arquitectonica and developed by Sun King LLC, an entity directed by DACRA CEO Craig Robins, The Ursa comprises 274,268 square feet of space including 159,892-square-feet of Class-A office space across 10-stories, 6,780 square feet of ground floor retail space, and 134 parking spaces all within a 222-foot-tall artistically-designed structure. The application was scheduled for review on June 15, 2022 and is now pending approval.
As per the project description included in the application, The Ursa will be the Design District’s first Class-A office building, offering businesses the unique opportunity to set up shop where creativity, culture, commerce, and community flourish together. The building will make an art-form out of it’s office spaces, and New York City-based contemporary artist Daniel Arsham is onboard for curating museum-quality exterior public art and interior art. The project is generally located around the southwestern limits of the Design District, fronting Northeast 39th Street between North Miami Avenue and Northeast Miami Court. Sun King’s assemblage for the project comprises three parcels of land including 30 Northeast 39th Street, 3825 North Miami Avenue and 3840 North Miami Court, totaling 24,934 square feet of floor area and equal to roughly half of the city block.
====================Related Group has submitted plans for the 15-story Icon Residences in North Miami, according to Biscayne Times.
Icon Residences North Miami is proposed to have just 54 condo units.
Prices would average $4.6 million.
The White House Inn at the entrance to the Broad Causeway would be demolished to make way for the new tower, if the city approves.
Related is currently lobbying the city for a height increase to allow the tower. The total height to the top of the mechanical area is 184 feet.
A supermajority of four out of five councilmembers will be needed to approve the project, and some neighbors are opposed while others are in favor.
Related is also in the process of buying out the four-story Mariner’s Bay condo building nearby, and has already secured most units there, the newspaper reported.
UNDER CONSTRUCTION/SITE PREP PROJECTS OVER 400 FT: