Oh my
^ Can't wait to see a wall of balconied, white condo towers on that waterfront site!!!
=======================================New York developer Kar Properties LLC just dropped $33 million on a 2.9-acre site on Miami’s riverfront — triple the amount it sold for in March 2011.
While plans for the lot have not been announced, the property at Southwest Third Street between Miami Avenue and Southwest First Avenue, can hold up to 920 apartments and 100,000 square feet of office and retail space, the Daily Business Review reported.
Last year, Kar purchased another 1.8-acre riverfront plot at 24 Southwest 4th Street for $27.5 million, which the developer intends to turn into a residential condominium building.
I hope that the condo towers look like marine life.
It will be nice to have public access to the waterway and have it connected with Museum Park on the other side of 395.
====================================The former Miami Herald building officially turned its last page Monday morning, as demolition commenced at the one-time home of the media outlet. The site will eventually give way to a resort and residential complex.
The 14-acre site, purchased for $236 million by Malaysian gambling giant Genting in 2011, will house a mix of condo towers, a 500-room hotel and ground-floor commercial space for shops and restaurants. Genting originally planned to build a mega-resort casino on the property located between MacArthur and Venetian causeways on Biscayne Bay, but squashed its proposal after facing a backlash over the project’s size.
It will be nice to have public access to the waterway and have it connected with Museum Park on the other side of 395.
===========================================Eduardo Costantini’s Consultatio received a $332 million construction loan for its luxury Oceana Bal Harbour condo project.
The Argentine developer told the Miami Herald it obtained the mortgage from a consortium of lenders led by HSBC. Consultatio started building the 240-unit Oceana in December 2013. The all-glass tower is rising on the former site of the Bal Harbour Beach Club.
Miami-Dade County has not recorded the transaction.
“We thought it would be convenient for the company to obtain such a credit facility,” Costantini told the Herald.
The firm is close to finishing its first U.S. development, Oceana Key Biscayne. The project is slated for a July completion. Consultatio did not receive outside financing for the Key Biscayne project.
=======================================A 36-story Arquitectonica-designed condo project is preparing to launch sales in Edgewater.
Sakor Development, led by former Related Group exec Barbara Salk and construction contractor Stephen Kornfeld, plan to build the tower at 2701 Biscayne Boulevard after buying the property last year. The project will be called Cascades at East Edgewater or Ion at East Edgewater.
328 residential units, along with 20,000 square feet of retail space, are included in the ‘eco-friendly’ project. Interiors are being designed by Hirsch Bedner Associates.
The project is down the block from Icon Bay, which includes a public park.
If I remember correctly there is a 50 foot setback from any waterway within the city of Miami.
^^^^^
Its coming down over the next several days according to the representative from Genting. In stages. Its a large structure.