MIAMI | Development Thread


62 Story Tower Proposed For Brickell

https://www.goldenduskphotography.c...ower-by-jds-development-proposed-for-brickell

4GPFCH4.jpg

Those trees would NEVER survive.

Architects really need to stop this stupid practice of throwing some trees on their designs to make them interesting or somehow "green". Trees atop a 62-story tower would die within a week.
 
Those trees would NEVER survive.

Architects really need to stop this stupid practice of throwing some trees on their designs to make them interesting or somehow "green". Trees atop a 62-story tower would die within a week.

I don't think good idea. They will not like it. That's very stupid idea.
 
WYNWOOD 12-STORY OFFICE BUILDING PROPOSED AT 2500 N. MIAMI AVE, DESIGNED BY KOBI KARP

gQLoTrI.jpg


A 12-story office building proposed for Wynwood has been submitted to the city for review.

The infill development site is at the corner of NW 25th Street and North Miami Avenue, and will complement a residential building proposed by the same developer at 2400 N. Miami Ave.

The project will include over 99,000 square feet of office space, with floorplates ranging from 7,000 square feet to over 14,000 square feet on levels 2 through 12.

On the 8th story, a green amenity deck with a fitness room and conference center is planned, along with a rooftop terrace.

The ground floor of the building will have 5,704 square feet of retail and an office lobby.

No parking will be built on the site. Instead, it will be centralized within the garage at the residential building proposed by the developer at 2400 N. Miami Ave.


Kobi Karp is the architect, with East End Capital the developer.

The Wynwood Design Review Committee is scheduled to review the proposal at a meeting tomorrow (March 10).
==================
NXT
 
FINAL VOTE ON $5 BILLION FUNDING FOR MIAMI INTERNATIONAL AIRPORT EXPANSION SET FOR NEXT WEEK

Miami-Dade commissioners are set to vote next week on issuing $5 billion in bonds for renovation and expansion of Miami International Airport.

Commissioners voted unanimously earlier this month to approve the bonds, and a second and final reading is scheduled for March 17.

Around $1 billion will cover projects that are already underway, with the remaining $4 billion to cover projects between 2020 and 2036.

The Central Terminal will see the biggest changes, including demolition and rebuild of Concourses F and G. There will also be a new check in area, and even the curbside and exterior will be rebuilt.

In the North Terminal, four new widebody gates will be added by reconfiguring space. The regional gates at D60 will also be expanded and rebuilt.

The South Terminal will be expanded with several new gates and a new retail area.

The funding and plans will be structured to allow the airport to speed up or slow down the expansion based on any rise or fall in demand.

Here’s a full list of what is being funded at MIA from 2020 through 2036. The total value reaches $4,015,563,000 when including work at other county airports like Opa Locka:
Code:
MIA North Terminal Gate Optimization Phase l
MIA Concourse “D” West Expansion — D60
MIA North Terminal Ramp Level Restrooms
MIA Central Terminal Redevelopment Phase 1
MIA Central Terminal Redevelopment Phase 2
MIA New CC F Enabling Up—gauge and Down-gauge Project
MIA New Concourse “F”
MIA Concourse F New Apron Phase 1 and Phase 2
MIA Concourse F Demo Phase 1- Headhouse Demo and New Hardstand Area
MIA Concourse F Demo Phase 2 — CC_F Pier Demo and New Apron Phase 3
MIA Lower Concomse E FIS Renovations ~ Phase 2
MIA Central Terminal Upper Drive Facade and Curbside
MIA Concourse “G” Demolition
MIA Concourse “E” and “F” Taxi Lane and Apron Rehabilitation
MIA South Terminal Apron and Utilities Relocation Phase 1
MIA South Terminal Expansion East (New Gates) Phase 1
MIA South Terminal Apron Enabling — Demolition of Building 3050
MIA South Terminal Centralized Checkpoint
MIA Concourse “H” – Glazing, Curtain Wall Assessment and Corrective Action
MIA Terminal Wide Re-roofing and Lightning Systems Upgrades
MIA North and Central Terminal Passenger Loading Bridges Phase 2
MIA Tenant Relocations
MIA Vehicle Fueling and Car Wash Facility
MIA Demolition Building 3039 and Fuel
MIA Temporary South Terminal GSE Facility & 20th Street modification AOA
MIA Demolition Building 703 and 703A
MIA Demolition Building 703 Environmental Assessment and Remediation
MIA Building 5A Tenant Relocation
MIA Building 702 Apron & Airside Improvements
MIA GSE Facility for North Terminal
MIA Demolition Building 5A
MIA Building 702 Expansion
MIA Demolition Building 704
MIA Consolidated Cargo Fumigation Facility
MIA West Cargo Truck Parking
Land Acquisition
MIA Runway 9-27 Rehabilitation
MIA Perimeter Road Bridge
MIA NW 37th Avenue Improvements
MIA New Hotels
MIA Fuel Storage Facility Expansion (Tank No. l)
MIA Fuel Storage Facility Expansion (Building and Tank No.2)
MIA Runway Incursion Mitigation (RIM) Hot Spot 5 (Corral area)
Credit: NXT
 


Back
Top