Thanks, Bobdreamz! Some pretty impressive photography there! So much construction in what is only the first or second wave of what is to come!Steve
Work begins on Met 2 offices
By Marilyn Bowden
Groundwork is under way at Met 2, the office component of the Metropolitan Miami project downtown, with the start of vertical construction probable in six months.
"We have the site permit, which allows us to do foundation work up to the level of the top of the piles," said leasing representative Jack Lowell, vice chairman of Flagler Development Corp., formerly Codina Realty Group.
Site and foundation work, which requires another permit and would cover development of the ground floor, will be finished in about six months, he said, when developer MDM Group USA expects to have the full building permit in place.
"We are building regardless of whether we have a tenant signed or not," Mr. Lowell said. He said he expects the Met to field one of several large financial tenants looking for space.
The 47-story tower at 200 SE Third St. will house about 750,000 rentable square feet of office space, Mr. Lowell said, as well as a garage and a 376-room Marriott Marquis Hotel.
Completion is expected in early 2009.
The Met's major competitors are proposed office buildings at 1450 and 600 Brickell Ave., just across the Brickell Bridge. The 35-story, 585,055-square-foot 1450 Brickell, a project of Rilea Group, could make it to the market first, said leasing representative John Marshall, because it is a smaller building. Construction is expected to start there when a major tenant is signed.
A major use special permit has been granted to the Foram Group for a mixed-use project at 600 Brickell Ave., the first phase of which would be a 36-story tower containing 490,126 square feet of office space. The permit requires a construction start within two years. The second phase, slated for a 2011 start, would add another 463,483 square feet of offices.
Platinum on the Bay for sale
South Florida Business Journal - 3:03 PM EDT Thursday
by Susan Stabley
Print this Article Email this Article Reprints RSS Feeds Most Viewed Most Emailed
The asking price for Miami's Platinum on the Bay: $44 million.
The Redondo development family has put its second residential condominium tower project on the market. The 320-unit luxury Platinum on the Bay is to rise 56 stories from the edge of Biscayne Bay at Northeast 29th Street.
"Since the market has changed, we're selling the site now," said Carmen Redondo, who doubles as family broker for Kamany Realty.
Platinum on the Bay is listed with LoopNet.
The project ran into trouble more than a year ago due to Federal Aviation Administration height restrictions.
The family, which does business as Maysville Inc., had originally hoped to build up to 825 feet.
But in May 2005, the FAA said the building would need to conform with two other nearby structures, both of which topped out at 544 feet.
The family's first project, Platinum, is expected to be completed in October. Redondo said they have sold more than 80 percent of that project.
Dale said:At this point it may be a toss-up between which is less likely to be built between the stadium and Met 3.
MAH4546 said:Met3 has been delayed ridden, but it is happening, no doubt. We are going to see a lot of projects never happen. Met3 is not one of them.
dave8721 said:This project being dead isn't news but burried in the article was the fact that Platinum on the Bay was originally to be a new tallest before the FAA chopped it down:
http://southflorida.bizjournals.com/southflorida/stories/2006/08/21/daily42.html?surround=lfn
BornInTheGrove said:anybody know what's up with SSC?
brickell said:yes it's the dupont site. Here's a shot of the one under construction. There's two planned, you can see them on the first page.
![]()