Glasgow Underground


Lucky Luke

New member
I heard rumourings that there is a plan to extend the system which for the last 100 years has been restricted to 1 loop line and 15 stations.
Is this going to happen and where will it go? I understand Glasgow has quite a few unused tunnels underneath it that could be used.
 
It's been like that for who knows how long, and nothing has ever happened.
Now, of course, there is real pressure to improve the Subway. If Glasgow gets the 2014 Commonwealth Games, then it'll have to be improved and expanded, because public transport to the east end is pretty non existent at the moment.
Also, the current rolling stock is getting near to its expiry date or whatever they call it.
The problem with expanding the subway to a second loop is that there are lots of abandoned mine shafts underneath the city, which would make construction very dangerous; and the rock on which Glasgow is built is much harder than that in other parts of the country, so it would be considerably more expensive.
 
The suggested expansion routes (yellow), existing (red):

Subway.jpg
 
No that plan for a circular route has been scrapped because it would be too expensive.
Now being considered is a straight line route between Bridgeton station in the west through to Celtic Park in the east, with the line meeting the existing one at St Enoch. The plan is to use existing tunnels under the city to cuts costs, and also to refurbish the present line.
More info at:
www.spt.co.uk/subway/latest.html
 
The platforms are also ridiculously short, and some of the island platforms are about only 2 metres wide!
 
I wouldn't say they are short ... the trains only have 3 cars each and they fit perfectly along the length of all the platforms at every station.

The island platforms, however ... yeh, I suppose they are a bit narrow ... dangerous if you've had a few drinks, perhaps.
 


Back
Top