I easily have as much construction experience as you.. Probably much much more in fact.. And my viewpoint is very common in the industry
ian, you may well have enjoyed working with them.I know where you are going with that, my experiences have been different.
Having worked with Chandos, PCL, Clark, Ledcor, Bird, Nason, etc. I believe that I am qualified to answer that thank you very much.
They are a HUGE machine and sometimes that helps and sometimes it hinders sure, but overall I enjoy working with them.
That's nice and we are all impressed but if that is Ian's experience, then it is completely valid (this isn't a competition on who has more experience). I for one want a company who is going to be pushing their employees to meet deadlines and budgets, this project is going to be tough to do properly in the 2.5 years it is scheduled for.
^ LOL.. oh Ian
Ask around what PCL stands for in the industry
Of the biggies, they are by far the worst to deal with
^ you display a fundamental lack of understanding of how big projects come together. Maintaining good relationships with subs is one of the key ways that good GC's and their subs and their sub-subs get work done effectively. Good lord... I couldn't imagine not maintaining good relationships with my subs and suppliers.. without them you are screwed
@ Airboy.. I was in the same position, being the BMCS contractor. Generally the last out, working with the TAB guys and the commissioning agents. I've never had a poor experience with PCL personally as I was usually sub to the MC, 99% of which I had a very positive relationship with. But I have heard plenty of negative feedback from very qualified people to substantiate my position.
Clark has been my favorite to work with over the years, with Stuart Olson, Graham and Ledcor rounding out my top 4.
I hear you on your "worst" list as well
There's a reason I like direct to owner design-build work
as an owner, there is absolutely no way i want relationships with subcontractors or suppliers on one of my projects that are not productive relationships.PCL (or other any general contractor) is there to deliver a product to their client. They do that. Not to build a productive relationship with subcontractors or suppliers.
They are hired because they have the ability to throw there weight around and dangle carrots to subs and suppliers. Key relationships are maintained, but everybody else is replaceable.
as an owner, there is absolutely no way i want relationships with subcontractors or suppliers on one of my projects that are not productive relationships.
is there sometimes a nominal premium to be paid in order to achieve that? maybe. but it's probably a lot less than the premium that will be extracted by subcontractors or suppliers without a productive relationship either on the project at hand or projects down the road.
that doesn't mean throwing money at things. sometimes it's a matter of paying quickly and supporting the safety programs (which aren't cheap when properly implemented) and recognizing quality craftsmanship when you come across it (it is there to be found and recognizing it goes a long way towards getting it) and not hanging a trade out to dry on an honest mistake.
if i want to be treated in a particular way and if i want my projects to be treated in a particular way, these are all two-way streets. and for what it's worth, it's not the gc's role or the cm's role to "be the heavy for the owner". owners that use their gc or cm like that deserve what they get and the gc or cm shouldn't always get the blame even though they're sometimes the easier target.
disagree. period. full stop.Re read my last line. Key relationships are maintained, everybody else is replaceable. Disagree or Agree?
I see this (obviously not directed at you kc) all the time, but every single trade, profession or role, on a site thinks that they are the crucial aspect that without them the whole project would fall apart. Their not, I'm not, and unless your paying the bills you aren't either.
As a consultant I have numerous relationships that are critical for me and the success of my projects and the owner I am representing. You guys are absolutely right, but there are also occasions where contractors and consultants are interchangeable with the guy down the street.
disagree. period. full stop.
there aren't two tiers of trades and sub-trades or consultants any more than there are two tiers of fans for oilers hockey.
even where a contractor or a consultant might well be interchangeable with the guy down the street, if an honest price has been provided and honest work is being performed, they are not interchangeable playing cards to be played at a whim or without cause once they have been awarded the work and it has been accepted in good faith.
interchangeable as a result of dishonest pricing or cheating on the work being done? absolutely. in a heart beat. but there aren't two tiers there either. that applies to all of them right up to the gc/cm and the prime consultant.
PCL (or other any general contractor) is there to deliver a product to their client. They do that. Not to build a productive relationship with subcontractors or suppliers.
I agree with your point here. You want good working relationships with the subs to get the job done with the least conflict. I know you and I have worked together in the past as I had to suck up to get balance programs.
Besides a few GCs the Tin Smashers were the worst to work with. MCs were better to work for.
Now in my current position I try to have good relations with all the subs. It’s amazing how well a project comes together when everyone gets along and can keep the Bull Shit to a tolerable level.