does any body know about a 21 story going up by bedford hwy on manor ln.
Yeah, here is the thread: http://forum.skyscraperpage.com/showthread.php?t=164192&page=8
is it starting up?
does any body know about a 21 story going up by bedford hwy on manor ln.
Hmm.. which building are you talking about?
This one?
http://consultpinto.com/projects/details/isl-web-marketing-office-building-halifax-ns
Its going up this fall.
Interesting news. They might run into problems because of Carlton Street, but in principle that's a good spot for some new development. As Halifax grows and development pressure increases 30 storey residential buildings might become more routine. I'd like to see something like a 40 storey building around Young Street. Building up in areas like that is a good way to support more density on the Peninsula while leaving heritage buildings and residential areas relatively undisturbed.
This is interesting... it exceeds the limits proposed for the Centre Plan. The Centre Plan has been very much taking is cues from developers, trying to make it so that in most identified areas for upcoming development that they can get green lit in 60 days like HRMbD. I wonder why the discrepancy.
I'm thinking we need to talk about having mid rise, limited high rise, and then high rise as Centre Plan categories. Having just mid and high seems to limiting. Mid rise of 5 stories seems low to me for parts of Quinpool, I would think "limited" high rise of 8-10 is appropriate, and other places I can see arguments for limiting height to 15-20.
That said, the difference between 20-30-35 in a dense or institutional setting is minimal. I'd designate the whole Young and Kempt Road corridor, the brownfield sites there, at "build it as tall as you want." Why have a limit at all on true highrise development? As long as the builds met the other design criteria, 35-40 stories is no bigs.
Robie/Spring Garden - hard to go from R1/R2 with a two/three story max and put that hard up against 30 stories. I can't see that happening. What exact lot are we talking about? Between Embassy Towers and Spring Garden Terrace (the two Victorian's there could go, that is a large lot) or the other side, where that low brick is, the Medical Arts building?
There was an article in ANS tonight with the alarmist title "Schmidtville At Risk". It was mostly about the potential sale of the NSLC and the owner of the properties next door. Several properties could theoretically be redeveloped as one building site.
The redevelopment could be positive for the area, and you'd think residents would be in favour of the NSLC moving out of the residential area.
Its grandfathered though right?
What's grandfathered?
There was an article tonight about Southwest Properties potentially developing a 21 storey residential tower at the corner of Hollis and Sackville. I believe they own both the parking lot and the Bank of Canada building. It's not really clear if they'd just be building on the lot, just redeveloping the Bank of Canada building, or both. Because 21 storeys are permitted under HbD they could theoretically get a new development approved very quickly.
It would be huge if a good building went up on that prominent corner parking lot. The parking lot by the Bank of Canada building is definitely one of the worst downtown, and presently Sackville is a lot worse looking than other street like Prince or George.
As I've pointed out before, we could see some really impressive changes along Sackville Street over the next few years. Hollis Street will be impressive too if the Sackville/Salter stretch is improved. Hollis already has a pretty strong "canyon effect" going.
The city should also bury the utilities in this area. I guess that might go along with the developments. It is very strange how most of Hollis is buried but then the poles pop up right around Sackville, stop, then start up again after the Maritime Centre.
The former City of Halifax had an agreement with Nova Scotia Power to share the costs, 50/50, of burying the powerlines in the Downtown core. It was inked in 1977 and the plan was to bury all the lines from Terminal Street (wherever that was, maybe Lower Water to Terminal Road?) up to Cunard/Cogswell and from the harbour to Brunswick. This was called the "Short-Term" Pole Free Zone because the idea was that it would actually get done. To HRM and NSP's credit, a lot of it did, but there is still about 1 km of wiring left to do. The Long-Term Pole Free Zone was to extend down to Morris and South, north to Cunard and west all the way to Robie. Almost none of that has happened. I recall reading that the City of Dartmouth also had a 50/50 deal for its Downtown core.
According to the last round of HRM studies, NSP is still willing to stand by the 1977 agreement to finish the Short-Term Pole Free Zone... That is if HRM can find the will to do it! Sadly, spending money on Downtown streetscapes hasn't been a big priority since amalgamation. Over in Dartmouth, they absolutely ripped up Ochterloney this past summer, but the lines stayed overhead. In Halifax, I don't know how the lines didn't end up buried in front of the Vic. I think it was part of the development agreement (burying the services was certainly discussed), but maybe it got axed as a "non-substantial" amendment or maybe NSP or HRM just wouldn't cooperate. Missed opportunities to complete what should be a no-brainer for the Downtowns.