Development Rumours


What development are we discussing? Is there something worldlyhaligonian posted that im not seeing for some reason? right above where u ask about renderings?
 
oh....I can't see it, for some reason my comp doesn't always show images. Any chance someone could repost it, or the link?
 
I have a new subscription to AllNovaScotia.com and I've been reading some interesting details. One fact mentioned is that the failed Midtown proposal cost the developers $230,000. I wasn't sure of this but it looks like the Midtown site will also be included in the Herald development. It seems as though details should be released soon, but presumably it will be delayed by the convention centre selection process (though as many have mentioned this does not seem at all like a viable site).

There are also some specifics for the Triangle Lands office tower - 22 floors and 400,000 square feet of space. It's already approved so construction can begin as soon as ECL is ready. That is definitely a positive since none of the other office buildings will be approved until next year at the earliest.

1801 Hollis is also 22 floors but is only something like 220,000 square feet, so I would imagine that the plans call for the new office building to pretty much fill in the whole lot.
 
Seriously?

Is the Triangle Lands lot actually going to be developed in the near future for sure?

22 stories!!! That would be really good to fill that gap in the skyline.

With Trinity, UG, and The Alexander, downtown would look alot taller
 
Well, until construction actually begins it's speculation, but I've heard it from multiple sources. From a market perspective it's really starting to make sense to build another major office building, particularly given the fact that this site would not require a new development agreement. Downtown vacancies are already getting tight and it would take a couple of years just to construct this building. The developers would want to arrange for major tenants before starting, but rumour has it that these already exist.

I hope it happens soon because that is really a great site for a major building. Currently that end of the downtown just trails off. The new building could add a lot by providing a much better terminus for Granville and adding another block and something more significant at the Northern end of Barrington.

As for UG, who knows what the story is? The brewery tower I suspect will be appealed.
 
I wonder how that would fit in with the Cogswell redevelopments...

Speaking of, anybody ever sit back and stare at the interchange site and wonder just how the hell they would ever redevelop that site? I mean first off it's a major artery, so redirecting traffic would be a huge undertaking in itself. Second, there's so many different grades, Cogswell Street before it turns into the interchange and Lower/Upper Water are drastically different heights, it would be quite interesting to see how they rectify those differences and turn it into something usable.
 
I don't think it would be that difficult to figure out the grades, though of course either the whole thing would end up sloping or it would be tiered in some way. I do think, however, that a lot of people hugely overestimate the amount of new land that would be made available. The calls to build a new metro centre, office towers, convention centre, double-sized Taj Mahal replica, etc. on this site 2/3 of the time do not seem to be based on any solid understanding of what is actually there (sadly, this is a common thread in Halifax urban planning commentary).
 
Here's a picture indicating the site and showing a really skewed view of what the massing might look like:

original.jpg


It will probably be connected to the existing Delta hotel. Not sure if they are permitted to build on top of the existing structure at all.
 
Well, until construction actually begins it's speculation, but I've heard it from multiple sources. From a market perspective it's really starting to make sense to build another major office building, particularly given the fact that this site would not require a new development agreement. Downtown vacancies are already getting tight and it would take a couple of years just to construct this building. The developers would want to arrange for major tenants before starting, but rumour has it that these already exist.

I hope it happens soon because that is really a great site for a major building. Currently that end of the downtown just trails off. The new building could add a lot by providing a much better terminus for Granville and adding another block and something more significant at the Northern end of Barrington.

As for UG, who knows what the story is? The brewery tower I suspect will be appealed.

With downtown vacancies are beyond tight now, latest news to be release will show less then 3% vacant in "A" class. This is beyond tight and without a new development within the next 12 months to 24 months i believe there will be an outmigration to the business parks.

Remember this development agreement dates back to the early 80's, along with a development agreement for the trade mart site. The site will help with urban infilling, however i haven't heard any tenants who have signed leases yet.
 
Ah. Thanks someone123. I had not clue what "The Triangle Lands" were. I wonder if they will actually fill the lot and make it triangle shaped? Makes sense for now... but one the interchange comes down (if it comes down)... it could seem awkward... since I assume the idea would be to restore a normal street grid.
 
Well there has been outmigration to business parks for several decades. There's currently zero office space under construction downtown but probably something like 700,000 sq ft in the suburbs. Over the past 20 years there has been maybe 20-30 times as much office construction in the suburbs as downtown (which the various cities and HRM have been subsidizing for a long time).

Like I said, I know nothing about specific leases signed or not signed but given the overall rates and vacancies a major new office tower does not at all seem far-fetched at this point.

I don't know what shape the new office tower would be but the claim was 400,000 square feet and to accomplish this on 22 floors they would have to fill in a significant part of that lot.

The Trade Mart is another possibility but I hope they develop this site first.

As for the street grid, I believe that triangular parcel may actually predate the interchange (there are images of old maps up somewhere around here). At some point the old downtown grid and North End grids have to meet.
 
It would be nice to finally see something happen of that scale downtown. It's been quite a while. Although I pray that the building has much much much better massing then someones little rendering. Something that size and bulk would not do well for the image of Halifax. I hope it's something truly interesting. Maybe a tiered approach?

I didn't know there was a development agreement for the Trademart? How big can it be? I don't imagine it would happen in a while though, they just did all those upgrades to the entrance.
 
Heh, maybe I shouldn't have used the term "massing" as it implies that that might be the overall form of the final building itself. I guess that's possible but I also hope it's not a giant block.

Bottom line I guess is that it's an unknown until we see renderings.
 
Heh, maybe I shouldn't have used the term "massing" as it implies that that might be the overall form of the final building itself. I guess that's possible but I also hope it's not a giant block.

Bottom line I guess is that it's an unknown until we see renderings.

Interesting to know that that parcel may have always been a triangle shape. I just assumed otherwise. And although we don't know what the building will be shaped like... I have to say... a 22 story "flatiron" might be interesting. I've always found the trapezoid shape of Hancock tower interesting too.
 
There were a few Victorian or older "flatiron" style buildings in that part of town at one point. Unfortunately, they were all demolished for the interchange.
 


Back
Top