SSP doesn't consider a building under construction until concrete is poured for the actual foundation which, in Vancouver, is often 5 or 6 floors below grade. I want to see shoring for excavation underway before updating the status. Currently, the site is being cleared of existing structures.
On hold is when the equipment has been removed; the site has been sealed up; signage for contractors has been removed and, nothing has happened for a few months afterwards (without confirmation of cancellation)