Steely Dan
devout Pizzatarian
To me it seems like a no brainer to add an infill station to an existing line to service United Center especially in a high public transit usage city like Chicago.
Of course it's a no-brainer, but Chicago sometimes moves painfully slow on grasping the obvious.
The Paulina connector was first built in 1895. The Chicago stadium (the United center's predecessor that once stood on Madison just north of the current arena) opened in 1929.
So the city has only had 93 years to make a station there happen. I think we're gonna need a minimum of three decades of study to figure out if building an infill stop along an existing rapid transit line that's only 750 feet from the front door of a 20,000 seat arena that hosts 200 events/year is a good idea or not.