Harry, it gets weirder. The old tree trunks will be treated, encased in latex and used as sculptural objects in the park. Seriously.
But those trees had to come down to fix the leaky garage top which was the primary driver of this whole operation to begin with. They were contractually and legally ordered to correct that problem due to that suck ass parking meter scam deal Daley stuck it too us for the next 75 years.
You're confusing two different deals. The Grant Park garages were sold to a group including LAZ Parking some years before the parking meter deal was even conceived. Part of the reason for the sale was the need for cash to replace the 40-year-old membrane.
The roots are cooler
![]()
Morton Arboretum - 2010
You guys realize that anything over four floors has to be under the highrise code, right? So a developer looking to build a few units and move on, perhaps with private or friends&family self-financing, is not going to be interested in many months of presales, the hassles of getting a huge construction loan, iffy prospects for a transition loan, months of building code review, and then years to close out the project and move on.
[QUOTE![]()
quick shot from the El, Jan 14, by Thurs they had the next floor opened up as well.
our team is developing a design that will connect two levels of workspace with a bleacher stair for group gatherings, a product development machine shop, and an internal cycling test track
-1118 W Adams - 69 apartments
![]()