Mr Downtown
Urbane observer
Riverside Park
A decade ago, I gave this diagram to Rezmar:
and they later claimed that they'd used it as the starting point for discussions with their land planning team. The big problem is the Rock Island tracks. Back then, they were still legally a "relocatable easement" that could have been moved westward away from Clark Street. One result of the PD approved in 2004 was that the property owners and Metra set in stone the Metra ownership interest right next to Clark. So now there's no way to get into the parcel from the east. You can get an overpass over the tracks at 1240 south, and you might be able to get under the tracks at 15th Street, but you face the wrath of the people on 15th who've so far managed to completely block anything of the sort.
CDOT is currently choosing a consultant to advise on the design of the Wells-Wentworth Connector, and I've been trying to spread the idea of "Riverside Boulevard," a generous (100-foot) ROW fitted with street parking and median landscaping. The problem is at the Chinatown end, where you don't want it to be something daunting for pedestrians to cross. There's also substantial expense involved in passing under the St. Charles Air Line at a logical angle. Everyone wants to cheap out and use the old C&WI underpass, which makes for nasty bends.
If that roadway were built soon, using TIF money before the district expires, developers could start taking down small parcels for townhouse development instead of waiting until the market is frenzied enough to build all the infrastructure and immediately do retail and highrises. They could work their way up to highrises over a decade, the same way Central Station did.
A decade ago, I gave this diagram to Rezmar:
and they later claimed that they'd used it as the starting point for discussions with their land planning team. The big problem is the Rock Island tracks. Back then, they were still legally a "relocatable easement" that could have been moved westward away from Clark Street. One result of the PD approved in 2004 was that the property owners and Metra set in stone the Metra ownership interest right next to Clark. So now there's no way to get into the parcel from the east. You can get an overpass over the tracks at 1240 south, and you might be able to get under the tracks at 15th Street, but you face the wrath of the people on 15th who've so far managed to completely block anything of the sort.
CDOT is currently choosing a consultant to advise on the design of the Wells-Wentworth Connector, and I've been trying to spread the idea of "Riverside Boulevard," a generous (100-foot) ROW fitted with street parking and median landscaping. The problem is at the Chinatown end, where you don't want it to be something daunting for pedestrians to cross. There's also substantial expense involved in passing under the St. Charles Air Line at a logical angle. Everyone wants to cheap out and use the old C&WI underpass, which makes for nasty bends.
If that roadway were built soon, using TIF money before the district expires, developers could start taking down small parcels for townhouse development instead of waiting until the market is frenzied enough to build all the infrastructure and immediately do retail and highrises. They could work their way up to highrises over a decade, the same way Central Station did.

