CHICAGO | General Developments


Status
Not open for further replies.
there's no doubt that piece of property could be better utilized with maximum allowed density, instead of a 1 story mcdonalds with a drive-thru. i was never trying to give praise to that particular mcdonalds, i was only responding to the notion that it was the most offensive mcdonalds in the city from an urban design standpoint, a notion with which i wholeheartedly disagree because the Rn'R mcdonalds wins that award by a country mile.

+1 on R&R... Hayward, really?! Chicago & State is a waste of that land, for sure... but it is in NO way as bad as R&R... which not only wastes an entire block of the central core, but is also one of the most ostentatious and atrocious pieces of shit in the entire McDs arsenal of shit buildings. It's 'WOW' bad. No joke... when I was in town for Halloween with my buddy, we drove past it (he has little to no interest in Architecture or urban development), and he very boldly said: WHAT THE FUCK IS THAT?! That basically sums up one's reaction to the R&R: WTF. :haha:

Also, Wrigley and N. Clark are worse also, IMO. :tup:
 
So the Lincoln Park Hospital redevelopment just lost their lease with Fresh Market. The grocer apparently was unwilling to accept the loading dock and delivery-hour restrictions that the community demanded.

:hell:
 
Actually there's ONE suburban style McDonald's I can recall in Manhattan (where all the tall buildings are), and that one is on the west side (Hudson Yards), and it's going to be gone once all the west side developments begin. Same should happen in Chicago, but I doubt it'll happen to the Rock and Roll McD's becuase that brings in alot of money.
 
So the Lincoln Park Hospital redevelopment just lost their lease with Fresh Market. The grocer apparently was unwilling to accept the loading dock and delivery-hour restrictions that the community demanded.

:hell:

^ The more important thing is they got the zoning approved. So they can still operate that building as a commercial space. It doesn't have to be a grocery store
 
Some updates from the south side...apologies if any of this has already been covered but it's been a while since I had the time to log on here.

Bronzeville

The buildings on the NE Corner of 35th & Michigan were torn down. This has been an abandoned strip of buildings for as long as I've been in the area (starting with my freshman year at IIT in 1999). DuSable finally finagled a structural condemnation out of the City and had it torn down. Right now it's some surface parking and lawn area with a decent wrought iron-type fence around it. DuSable has a PD on the books with the City for the property to expand the school at this spot.

Across the street to the south, the Church's Chicken at 35th & Michigan is finally no more. Urban Partnership Bank has a new branch location just finishing up. It's a hideously awful use of a corner lot with a tiny building sitting in the middle of a parking lot, but it's a hell of a lot better building and use than was the Church's. And at least now there will be landscaping.

Payless Shoes along the 35th St. corridor is also closing down. No idea if anything is going in in it's place, but here's hoping the monstrosity of a building just comes down for something else.

Pilgrim Baptist Church is beginning its reconstruction efforts. I am currently bidding on the first phase, which will put in superstructure steel, restore the masonry, put a roof on, add faux windows/doors to finish the enclosure, put in decorative uplighting to showcase the building, and an exhaust system to keep moisture out of the interior as much as possible. It's a first step to help get the donation money flowing for the rest of it, basically.

Further South

Related Midwest is redeveloping Parkway Gardens at 63rd-66th & King Drive to the tune of $40 million. Masonry restoration, mechanical/electrical/plumbing work, and interior renovations are well underway. We have the site work contract. Tree Removal and Pruning is complete and Storm Sewer upgrades began this week. Aside from storm water detention going in through the winter months, the site work will mostly take place after it warms up a bit more in the spring. A major undertaking both for Related, renovating the buildings, and us on the site, as the buildings remain 95% occupied during the renovations.

The Ray & Joan Kroc Corps Community Center is at about 75-80% and is on pace for a late spring finish.
 
Avondale negihborhood

Belmont and Rockwell - anyone know the story behind this ?
P1090639.JPG

Nov 19

P1090658.JPG

Nov 19

And N on the river ...
P1090651.JPG

Nov 19
 
The buildings on the NE Corner of 35th & Michigan were torn down. This has been an abandoned strip of buildings for as long as I've been in the area (starting with my freshman year at IIT in 1999). DuSable finally finagled a structural condemnation out of the City and had it torn down. Right now it's some surface parking and lawn area with a decent wrought iron-type fence around it. DuSable has a PD on the books with the City for the property to expand the school at this spot.

De La Salle, not DuSable.

That building was once the Pickford Theatre. The original plan was to incorporate it as part of the new school development. The concern was the building's bowstring truss roof. Those are prone to collapse during a fire, as was the case at another building on the south side last year that led to the death of two firefighters.

The plans to build a new school on that site are on hold pending availability of funds.
 
Some updates from the south side...apologies if any of this has already been covered but it's been a while since I had the time to log on here.

Bronzeville

The buildings on the NE Corner of 35th & Michigan were torn down. This has been an abandoned strip of buildings for as long as I've been in the area (starting with my freshman year at IIT in 1999). DuSable finally finagled a structural condemnation out of the City and had it torn down. Right now it's some surface parking and lawn area with a decent wrought iron-type fence around it. DuSable has a PD on the books with the City for the property to expand the school at this spot.

Across the street to the south, the Church's Chicken at 35th & Michigan is finally no more. Urban Partnership Bank has a new branch location just finishing up. It's a hideously awful use of a corner lot with a tiny building sitting in the middle of a parking lot, but it's a hell of a lot better building and use than was the Church's. And at least now there will be landscaping.

Payless Shoes along the 35th St. corridor is also closing down. No idea if anything is going in in it's place, but here's hoping the monstrosity of a building just comes down for something else.

Pilgrim Baptist Church is beginning its reconstruction efforts. I am currently bidding on the first phase, which will put in superstructure steel, restore the masonry, put a roof on, add faux windows/doors to finish the enclosure, put in decorative uplighting to showcase the building, and an exhaust system to keep moisture out of the interior as much as possible. It's a first step to help get the donation money flowing for the rest of it, basically.

Further South

Related Midwest is redeveloping Parkway Gardens at 63rd-66th & King Drive to the tune of $40 million. Masonry restoration, mechanical/electrical/plumbing work, and interior renovations are well underway. We have the site work contract. Tree Removal and Pruning is complete and Storm Sewer upgrades began this week. Aside from storm water detention going in through the winter months, the site work will mostly take place after it warms up a bit more in the spring. A major undertaking both for Related, renovating the buildings, and us on the site, as the buildings remain 95% occupied during the renovations.

The Ray & Joan Kroc Corps Community Center is at about 75-80% and is on pace for a late spring finish.

Parkway Gardens needs to go. Lot of problems over there. I was hoping to see a total redevelopment of the site.
 
Some updates from the south side...apologies if any of this has already been covered but it's been a while since I had the time to log on here.

Bronzeville

The buildings on the NE Corner of 35th & Michigan were torn down. This has been an abandoned strip of buildings for as long as I've been in the area (starting with my freshman year at IIT in 1999). DuSable finally finagled a structural condemnation out of the City and had it torn down. Right now it's some surface parking and lawn area with a decent wrought iron-type fence around it. DuSable has a PD on the books with the City for the property to expand the school at this spot.

Across the street to the south, the Church's Chicken at 35th & Michigan is finally no more. Urban Partnership Bank has a new branch location just finishing up. It's a hideously awful use of a corner lot with a tiny building sitting in the middle of a parking lot, but it's a hell of a lot better building and use than was the Church's. And at least now there will be landscaping.

Payless Shoes along the 35th St. corridor is also closing down. No idea if anything is going in in it's place, but here's hoping the monstrosity of a building just comes down for something else.

Pilgrim Baptist Church is beginning its reconstruction efforts. I am currently bidding on the first phase, which will put in superstructure steel, restore the masonry, put a roof on, add faux windows/doors to finish the enclosure, put in decorative uplighting to showcase the building, and an exhaust system to keep moisture out of the interior as much as possible. It's a first step to help get the donation money flowing for the rest of it, basically.

Further South

Related Midwest is redeveloping Parkway Gardens at 63rd-66th & King Drive to the tune of $40 million. Masonry restoration, mechanical/electrical/plumbing work, and interior renovations are well underway. We have the site work contract. Tree Removal and Pruning is complete and Storm Sewer upgrades began this week. Aside from storm water detention going in through the winter months, the site work will mostly take place after it warms up a bit more in the spring. A major undertaking both for Related, renovating the buildings, and us on the site, as the buildings remain 95% occupied during the renovations.

The Ray & Joan Kroc Corps Community Center is at about 75-80% and is on pace for a late spring finish.

^ This whole post is sad.
 

Eh...it kind of just means the neighborhood isn't really going anywhere. Most new stuff is institutional. There's no new commercial development except for the bank. If the land for the school is going PD, doesn't that mean they'll probably add athletic fields and stuff as opposed to an actual school expansion?

BTW, I hope Michigan Boulevard Garden Apartment sees a rehab someday in the future.
 
aic, what's involved in the site work? You mentioned the utility upgrades. Is Related also re-landscaping the open spaces? It would be nice to get something like they did at the Cabrini Rowhouses. It really changed the feeling of the space, even if the original buildings had pretty awful design.

4738172508_f9c79e6d62.jpg
 
Status
Not open for further replies.


Back
Top