You know the old saying about life: When one door closes, another opens. Well, it's true in architecture, too, as I just realized after walking to the corner of Illinois Street and Lake Shore Drive--right next to the Chicago Spire hole and within eyeshot of Navy Pier. The Spire is dead! Long live Navy Pier! Chicago isn't going to build a 2,000-foot-tall, twisting tower, so it can focus its civic energy on rebuilding--and re-imagining--a 3,300-foot-long, ramrod straight pier. We were going to stare at the skyscraper icon, but we can stare at--and walk right through--the lakefront icon.
- Restoring the pier's clean-lined image, the silhouette it projects to the city and the lake, has to be a major part of the revitalization that pier officials announced Wednesday. Yet the experience of the individual on foot is every bit as important as the image the pier projects to people behind the wheel on Lake Shore Drive.
- How can a tourist from Oshkosh get to the pier without running through traffic jams? Can an indoor ice skating rink help make the pier more alluring in the winter? How can the child on the pier, which is elevated above the surface of Lake Michigan, get closer to the water so she could reach out and touch it--or feel its calming coolness on a warm summer day?
- On Wednesday, according to Bob O'Neill, who heads the Grant Park Conservancy, pier officials meeting with an advisory panel of civic and business groups were talking up the need for new connections to the water and bringing more greenery to the hard-surfaced pier. Currently, the greenery largely consists of ugly wood planter boxes.
- But just how the pier is greened is a big question mark. You could scatter little patches of grass or other green toupees on its surface. Or you could integrate such greenery into an overall design. That points to the need for pier officials to ask for redesign teams that include landscape architects as well as architects and traffic engineers.
- The teams will face real constraints. The budget is not going to be Millennium Park's $500 million--more like one-tenth of that, at least for starters. Beyond the proposed expansion of the Shakespeare Theater, much of the existing structure will remain, though there will be plenty of room for interior re-configuration.