^The Van Buren tunnel is 30 feet wide—and 1052 feet long. I think pedestrians would be very unlikely to use them unless forced to (as they were in the 1860s by frequent bridge openings). Psychologically they would seem incredibly long and claustrophobic; with no escape, people would fear crime. Think of how long the transfer tunnel between the Blue and Red Line subways seems. Now multiply that by four.

30 feet is significantly wider than the Jackson or Washington transfer tunnels. The height is also more generous.

I agree that the unbroken length of the tunnel is unpleasant, but travelers wouldn't be using the full length. You'd only open the segment between Wacker and Canal, where there would be access points. You could also potentially have an access to a riverwalk-type space, either on the east or west side of the river. There's already an unused platform in the river on the west side, right above the tunnel.

The generous dimensions of the tunnel relative to the human figure mean that you could potentially do a large art installation like the neon at O'Hare, or the color-changing panels at McNamara in Detroit, to relieve the oppressive feeling.

I'm more interested in the Washington tunnel as a busway - it would allow buses to get from Clinton Street to Franklin without the sometimes-long lights at Canal, Wacker, or Riverside Plaza, speeding up quite a few bus routes. The recent decision to establish bus lanes and install next-bus signage along Washington only underscores this.
 
I'm more interested in the Washington tunnel as a busway - it would allow buses to get from Clinton Street to Franklin without the sometimes-long lights at Canal, Wacker, or Riverside Plaza, speeding up quite a few bus routes. The recent decision to establish bus lanes and install next-bus signage along Washington only underscores this.

Seems like they could also be useful as bikeways; bridges and the intersections before and after them strike me as one of the most dangerous for cyclists. The length is less an issue then. They would need a lot of security of course.
 
Is this intersection just going to be allowed to decay into oblivion until there is a billion-dollar project to straighten LSD and move the beach further into the lake? Anyone know anything about that plan/idea?

I've heard several mentions of just filling it in. The section that connects the drake to the other side of Oak is still open.
 
I heard something earlier this year (don't remember the details) that made me think the Oak-to-Ohio shoreline extension might be in the near future. However, I don't see the relationship to the tunnel that's closed or the Michigan/Oak intersection. The tunnel that's closed is not the ramped one from the park past the restrooms to the beach. It's the one with steep stairs under Michigan and the Outer Drive ramp on the north side of Oak. Pedestrians can still cross at the crosswalk on the south side of Oak.
 
^ My thought is that once the Oak Street Beach and LSD are pushed further into the lake, access from East Inner LSD westbound onto northbound LSD will no longer need to butt up right against the Drake with a hard right turn; there could be a separate on-ramp that burrows under the park and LSD much further east. Therefore, pedestrians crossing from the Drake sidewalk north to the beach would not need to contend with highway onramp traffic, and therefore a tunnel would no longer be necessary under Oak. Then to get to the beach side of LSD there would have to be either a tunnel or a ped bridge.

In any event, concrete is cracking and the whole intersection is not up to modern standards in terms of safety / access / traffic volume (especially considering the increase in "luxury ped traffic" in the general Oak-to-Drake-to-Bloomingdales area, it is really incongruous), so regardless of layout, they're going to rebuild the whole thing at some point, no?

Plus, the park between East Inner LSD and LSD is effectively dead and unusable right now, so all of this could help activate that area.
 
^ My thought is that once the Oak Street Beach and LSD are pushed further into the lake, access from East Inner LSD westbound onto northbound LSD will no longer need to butt up right against the Drake with a hard right turn; there could be a separate on-ramp that burrows under the park and LSD much further east. Therefore, pedestrians crossing from the Drake sidewalk north to the beach would not need to contend with highway onramp traffic, and therefore a tunnel would no longer be necessary under Oak. Then to get to the beach side of LSD there would have to be either a tunnel or a ped bridge.

In any event, concrete is cracking and the whole intersection is not up to modern standards in terms of safety / access / traffic volume (especially considering the increase in "luxury ped traffic" in the general Oak-to-Drake-to-Bloomingdales area, it is really incongruous), so regardless of layout, they're going to rebuild the whole thing at some point, no?

Plus, the park between East Inner LSD and LSD is effectively dead and unusable right now, so all of this could help activate that area.

Really the problem is not pedestrians crossing Oak, but them crossing Michigan Ave. Pedestrians are strictly prohibited crossing Michigan Ave on the north side of Oak. They can be ticked and have been, yet throngs of people going to the beach still risk it. That's what the now closed tunnel was supposed to prevent. But it was considered unsafe (security).
 
Does anybody know what is u/c a bit south of the intersection of Clark and Chicago Ave, on the east side of Clark? Seems to be a roughly 5-6 story building with balconies, but it seems to have been u/c for a long time. Is it some sort of stalled project?
 
Really the problem is not pedestrians crossing Oak, but them crossing Michigan Ave. Pedestrians are strictly prohibited crossing Michigan Ave on the north side of Oak. They can be ticked and have been, yet throngs of people going to the beach still risk it. That's what the now closed tunnel was supposed to prevent. But it was considered unsafe (security).
Right, but having peds crossing Mich. even on the north side of Oak would be no problem if they did what I described above for onramp traffic. More broadly, the whole intersection is kind of ugly and hostile to pedestrians, even crossing on the south side of Oak. It's inappropriate for being a grand entrance to Boul Mich, and it's inappropriate for being a grand entrance to the parks/beaches from Boul Mich. It's a forgotten stepchild compared to the beautification throughout Grant Park, or LSE, or the Pioneer Court area, or myriad other areas of downtown. Modest changes there could yield huge improvements in user-friendliness, although I think they might end up having to be coupled with a zillion dollar shift in the roadway.
 
Right, but having peds crossing Mich. even on the north side of Oak would be no problem if they did what I described above for onramp traffic. More broadly, the whole intersection is kind of ugly and hostile to pedestrians, even crossing on the south side of Oak.

And not to mention confusing. How difficult would a sky walk to the beach be? It could be something pretty nice for a low cost.
 
Lakeshore east
21deaf78.jpg


Does anyone know what is to come of this site in lakeshore east?
ec6ef99e.jpg
 
Why do they need a tower crane for the village market? I thought it was only a 3 story building.

It's just the easiest way to move materials around a constrained site. Height has nothing to do with it - it's the long boom. The crane allows materials and equipment to be moved from one side of the site to the other without disturbing work occurring at ground level, or going along the park drive and fouling up traffic for the neighborhood.

Crane companies also have tons of cranes lying around the city after the highrise boom, so you can probably get a good deal on renting one.
 
It's just the easiest way to move materials around a constrained site. Height has nothing to do with it - it's the long boom. The crane allows materials and equipment to be moved from one side of the site to the other without disturbing work occurring at ground level, or going along the park drive and fouling up traffic for the neighborhood.

Crane companies also have tons of cranes lying around the city after the highrise boom, so you can probably get a good deal on renting one.

That's one hell of a cost for a crane for a three story building, no matter what kind of deal they might be getting. Amortizing the setup/takedown, that's going to run them around $65,000/month (higher if it's out there for a short duration since setup/takedown are fixed costs) for an overall fairly inefficient crane setup for that long, narrow site. Not to mention the extra caisson and pad they had to build for it, probably another $20,000 or so. Then you can figure in the full time tower crane operator at probably $20,000/month once you work in OT. Hard to believe they couldn't have just bought the street for multiple regular cranes as needed for a lot cheaper, and given themselves more flexibility to work multiple sections of the site in the meantime.

Unless somebody disallowed use of the street for construction purposes, this feels like a generally lazy decision to me. "Well guys, it's a tough site, and we don't want to mess up traffic, guess we better get a tower crane." And that was that. Even using two stiff-legs seems like it would have been a better logistical choice if they were fine with spending so much money.
 
^It's actually closer to a 5 story building. . . the crane makes sense. . . there's no easy way to get materials from one side of the site to another. . . staging is all done on the west and there's no access through the site to move equipment. . .
 
Relevant to what's stopping construction all over the city. . .

http://www.suntimes.com/news/transportation/2509372,CST-NWS-strike19.article
Long strike taking a toll on unions, contractors

July 19, 2010

BY MARY WISNIEWSKI Transportation Reporter

The construction workers strike has been going on for almost three weeks now, and workers and contractors alike are feeling the pain.

"It's killing us," said Jay Javors, president of Midwest Property Group, whose company is building a high-rise at 210 N. Wells. "We're 10 days behind schedule."

. . .
 