ardecila
TL;DR
I imagine the city is trying to avoid eminent domain, which is usually a fairly combative legal process (involving substantial legal fees paid by the city), by making a high initial offer and having negotiations with property owners. If they refuse to sell for whatever reason, then eminent domain may become involved. I don't know whether this project has advanced to this point yet. I do hope, however, that the city does something worthwhile with the excess land, rather than just selling it to the highest bidder. A riverfront park would be wonderful, although it would probably need a decent-sized parking lot - the surroundings aren't very pedestrian-friendly.
left of center - there's no room for a flyover, or even a tunnel really. Elston is a fairly narrow street with a high traffic volume. If a grade separation were built, there would probably be no room left over for turn lanes at-grade, so turning traffic would need to be directed onto neighborhood streets. There's also the issue of property values and quality of life, which probably suffer when there's a huge pier or giant trench outside your front door. Cost isn't the only reason CDOT rejected this plan.
left of center - there's no room for a flyover, or even a tunnel really. Elston is a fairly narrow street with a high traffic volume. If a grade separation were built, there would probably be no room left over for turn lanes at-grade, so turning traffic would need to be directed onto neighborhood streets. There's also the issue of property values and quality of life, which probably suffer when there's a huge pier or giant trench outside your front door. Cost isn't the only reason CDOT rejected this plan.