^^SO we get a less intense use....both less residential and less commercial because of some irrational concern that Wrigley must remain taller than its neighbors....priceless....it boggles the mind

If you ask me it should be 15 stories minimum Christ its is a little over a block from redline access and at the intersection of 2 bus lines.....

.....not to mention the essentially bottomless Cache of a near Wrigley address

Given the current environment they need to have the neighborhood and city totally on board before they can even attempt to nail down financing.
I don't think they did too badly all things considered and it will definitely add quite a bit of density.

Now if only something similar could be done about the land caddy corner across the intersection...
 
^^^ I agree with you lawfin, but I think the design is a great precedent for the area. This building is relatively large for the area and there are lots of parking lots/crappy 1 story buildings (see McDonalds and t-bell) that will bite the dust in the future. This sets a minimum expectation for the potential developers of those sites. Hopefully this will allow someone to get away with something bigger and denser in the area in the future.
 
Okay, round three of being belittled for not thinking the parking meter lease was such a great idea. The inspector general released a report (pdf) finding that the city undervalued the meters by almost half--as what his office describes as a conservative estimate (because it employs a discount rate of 7%). The report is very readable and addresses a lot of the likely challenges to its conclusions.

Daley's response:

“Like anything else, you can issue any type of report,” Daley said. “I can criticize anything. Constructive criticism [is] accepted. But all of a sudden you’re challenging all the financial people about this financial area. If you want to, so be it.”

Asked if he had appointed the inspector general to issue such reports, the mayor shrugged and replied, “Today, everybody can do anything they want, I guess.”

Come on, guys. This man is embarrassing. He's incoherent. He has nothing of substance to say about the report so he criticizes the inspector general for not sticking to the narrow role Daley prescribed for him.

Of course the City Council is complicit in all this, I'm not laying the entire thing at the mayor's feet. They obviously didn't have to approve this deal less than two days after it was announced.

But think about the justification the mayor is giving for the lease: if we didn't do it, our finances would be in the toilet. In other words, if we didn't eat the next 75 years' worth of revenue from this source and deprive future generations of it, we would have had to change our consumption in the present. So we are straightforwardly taking revenue directly from the future, which is a different thing from engaging in a PPP simply for efficiency's sake. Even if we think this was the right thing to do, the inspector general points out that there were plenty of other options for raising the necessary revenue--the 75-year lease raised way more money than the city was arguing we needed.
 
Poetry Foundation Building

Can't remember now who was asking recently about the Poetry Foundation's new building. Sentinel, was it you? Anyway, forgive me if this is redundant/has already been posted. Not exactly "news", but don't recall reading about it on the board:

CHICAGO — The Poetry Foundation board of trustees has selected John Ronan Architects to design its planned home for poetry in Chicago. The board made the unanimous decision at its September 19 meeting.

Eighteen firms applied to design the project. Chicago-based John Ronan Architects was chosen from a group of three finalists including Rafael Viñoly Architects, of London and New York, and Tod Williams Billie Tsien Architects, of New York. Founded in 1997, Ronan’s firm recently completed the widely heralded Gary Comer Youth Center, home of the South Shore Drill Team, in Chicago.....Located on the southwest corner of Dearborn and Superior Streets in downtown Chicago, the new building is expected to encompass 25,000 square feet and include offices for the Poetry Foundation headquarters, editorial offices for Poetry magazine, a library and archives containing 30,000 volumes now housed at the Newberry Library, a public reading room with access to the collection, a visitors’ center, a garden or similar outdoor space, and multipurpose space designed to support the newly created Harriet Monroe Poetry Institute as well as the Foundation’s roster of public programming events such as readings, lectures, and panel discussions. The Foundation expects the project to be designed in an environmentally responsible manner.​

-----
​
From Ronan's website:

http://www.jrarch.com/#/projects/institutional/poetry_foundation

The Poetry Foundation is a not for profit organization which grew out of Poetry magazine dedicated to the promotion of poetry in contemporary culture. Their headquarters building, in the River North neighborhood of Chicago, is comprised of a building in dialogue with a garden space. The garden space that is created by erosion within an implied volume as determined by the property boundary, resulting in a relationship whereby the building pushes into the garden and vice versa. Visitors reach the building by walking through the garden; the building’s internal arrangement is configured to allow for views from all spaces back out onto the garden.

The garden is a conceived of as an urban sanctuary, a space that could mediate between the street and the building, blurring the distinction between public and private. Functions more public in nature (a poetry reading room, a gallery, and library) are located on the building’s ground floor, while offices for the organization are located on the second level, organized into three areas corresponding to operations (foundation administration, magazine-website staff, and programs staff). Upon entering the garden, visitors perceive the double height library space that borders the garden, announcing that they are entering into a literary environment. Once inside, an exhibition gallery connects the library to the poetry reading room, where poets read their work to an audience against the backdrop of the garden.    

Tectonically, the building is conceived of as a series of layers that visitors move through and between. The layers, of zinc, glass, and wood, peel back like pages of a book to define the various programmatic zones of the building. The building’s outer layer, a cladding of oxidized zinc, becomes perforated where it borders the garden, allowing visual access to the garden from the street, encouraging public investigation. Inside the garden, a layer of perforated natural zinc reflects light into the north-facing space, creating a more internalized garden experience that provides a sense of removal to prepare visitors for the programs inside.


“The building will be a destination for visitors wishing to read, listen to, research, or simply enjoy the pleasures of poetry,” said Ethel Kaplan, chair of the board of trustees. “It will be designed from the ground up to honor the art form we serve.” Work is expected to commence
immediately, with an expectation that final design plans will be ready nextsummer. The project is scheduled for completion in 2010.
​
 
^ Sucks that it's replacing historic buildings for no reason. Right across the corner is that little cafe and a parking lot.

Why doesn't the guy provide any renderings in his website?
 
Chicago Riverwalk

June 3, 2009

dsc0212hxp.jpg


dsc0371j.jpg
 
^^^ Maybe they've been asked not to release them by the client? Here is a description from the website of John Ronan Architects:


"Tectonically, the building is conceived of as a series of layers that visitors move through and between. The layers, of zinc, glass, and wood, peel back like pages of a book to define the various programmatic zones of the building. The building’s outer layer, a cladding of oxidized zinc, becomes perforated where it borders the garden, allowing visual access to the garden from the street, encouraging public investigation. Inside the garden, a layer of perforated natural zinc reflects light into the north-facing space, creating a more internalized garden experience that provides a sense of removal to prepare visitors for the programs inside."

Sounds promising and Ronan has had some good stuff before, I hope for the best!
 
For all the week-to-week attention we pay to changes in the 108 N State / Block 37 tenant roster, you never hear anything about the Roosevelt Collection. And now glass has been installed in the Roosevelt retail windows, so this one may hit completion ahead of B37.

Do we know about any of the retail tenants other than the theater?
Or is this sucker drowning just like all the other various retail sites in the city?
 
^^ I know of David Barton Gym, Urban Outfitters, H&M, Banana Republic, Victoria's Secret, and a major bookstore chain (most likely Barnes and Noble, which has little downtown presence, and seems to go for new construction buildings only). A high-end coffee shop is also in the works - not sure what it will be, since there are many upscale coffee chains in the city besides the usual Starbucks and Caribou, from Intelligentsia to Julius Meinl to Argo Tea (okay, not really coffee, but close).

The target date for opening is October 2009, and it looks like they are on track for that deadline.

I could have sworn that Lululemon was also opening a store here, but I can't find anything to back that up.
 
As much as I still am not a fan of Roosevelt Collection (I don't hate it either, just to be fair), it's really going to add some good retail to a part of town that BADLY needs it, IMO.
 
Okay, round three of being belittled for not thinking the parking meter lease was such a great idea. The inspector general released a report (pdf) finding that the city undervalued the meters by almost half--

Once again, someone with zero knowledge of either public or investment finance opining with populist bunk. The William Blair analysis leaked as part of the Reader piece clearly showed that $1.15 billion is on the very high end of the expected bid range. At least Hoffman's analysis was somewhat more informed than the dribble out of Waguespack's office.

No argument from me on the lameness of Hizzonner's response to questioning, though. Ideally the deal wouldn't have been necessary, but since it's impossible to have an adult conversation about revenue from reliable sources like Chicago's absurdly low residential property tax anymore, stuff like this is on the table. Remember, the city now has an extra billion in the bank. Put that in risk free treasuries, and that's $30+ million a year in interest income - when just last year, the city was getting about $25 million in meter revenue and had to pay for maintenance etc.
 
Once again, someone with zero knowledge of either public or investment finance opining with populist bunk. The William Blair analysis leaked as part of the Reader piece clearly showed that $1.15 billion is on the very high end of the expected bid range. At least Hoffman's analysis was somewhat more informed than the dribble out of Waguespack's office.

No argument from me on the lameness of Hizzonner's response to questioning, though. Ideally the deal wouldn't have been necessary, but since it's impossible to have an adult conversation about revenue from reliable sources like Chicago's absurdly low residential property tax anymore, stuff like this is on the table. Remember, the city now has an extra billion in the bank. Put that in risk free treasuries, and that's $30+ million a year in interest income - when just last year, the city was getting about $25 million in meter revenue and had to pay for maintenance etc.

Did you read the IG report? It goes over the Blair report in detail and specifically argues that the Blair report was only tasked with considering what a private company might pay for the meters, and not what the meters were worth to the city. These are two completely different things. The biggest difference is in the discount rate. The private sector employs a much higher one than the public sector because of the need to raise funds and repay lenders at higher rates. The Blair report used a discount rate of "between 10 and 14 percent." I've looked at a lot of cost-benefit analyses. Nobody uses a discount rate as high as even 10 percent for the public sector; 7 percent is typically used as the most conservative discount rate.

Furthermore, this is a 75 year lease. Discount rates start to lose meaning when you are looking that far into the future--the IG report notes that the first 37 years of the lease were valued at $1.08 billion, whereas the last 38 years were valued at only $77 million. Therefore a 75-year lease was not necessary. Do you have any substantive arguments against the IG report?

Second, you're wrong about what the city is doing with the money. The parking meter lease was explicitly intended to go toward filling today's budget holes ($150 million last year alone). That means it's not all going into the bank and collecting interest. As a CTA employee, you know all about diverting capital funds to operating expenses. Second, even if the whole sum were functioning as an endowment and we were living off the interest, the value of the meters is expected to rise over time, while the interest on a billion dollars, drawn out and consumed continuously (i.e. not compounded), is not.

You also omit the fact that the rates were drastically increased with the sale, so they are almost sure to bring in much more than $30 million. In fact the Blair report estimated that in year 5, NET revenue would be "anywhere from $85 million to $135 million." Let me know when you find risk-free Treasuries paying between 8 and 13 percent. (The answer is "in 1981.")
 
Did you read the IG report? It goes over the Blair report in detail and specifically argues that the Blair report was only tasked with considering what a private company might pay for the meters, and not what the meters were worth to the city. These are two completely different things. The biggest difference is in the discount rate. The private sector employs a much higher one than the public sector because of the need to raise funds and repay lenders at higher rates. The Blair report used a discount rate of "between 10 and 14 percent." I've looked at a lot of cost-benefit analyses. Nobody uses a discount rate as high as even 10 percent for the public sector; 7 percent is typically used as the most conservative discount rate.
Well yes, I'm not saying the meters should have been leased out to the private sector, but given that they were the city got a good price. Once public goods/services are taken to the private sector/free market, they have to abide some of the basic groundrules far outside the control of a mere municipal government.

Furthermore, this is a 75 year lease. Discount rates start to lose meaning when you are looking that far into the future--the IG report notes that the first 37 years of the lease were valued at $1.08 billion, whereas the last 38 years were valued at only $77 million. Therefore a 75-year lease was not necessary. Do you have any substantive arguments against the IG report?
Yes. 75 years ago, parking meters didn't exist. 75 years before that, cars didn't exist. To fork over $1.1 billion now is take on a lot of risk over what the future holds. It's not clear that the city could have gotten $1.08 billion for a 37 year lease (if they could have, then by all means they should have, but I suspect that would have changed some of the fundamental assumptions of the private equity investor).

Second, you're wrong about what the city is doing with the money. The parking meter lease was explicitly intended to go toward filling today's budget holes ($150 million last year alone). That means it's not all going into the bank and collecting interest. As a CTA employee, you know all about diverting capital funds to operating expenses. Second, even if the whole sum were functioning as an endowment and we were living off the interest, the value of the meters is expected to rise over time, while the interest on a billion dollars, drawn out and consumed continuously (i.e. not compounded), is not.
Going back to a previous point I made, it's impossible to have an honest adult conversation about revenue in this city (country?) anymore. It's a fallacy to think City government could have raised rates as you say - in fact, raising meter rates was proposed as part of balancing the 2007 operating budget but shot down for political reasons. The BRT money, to be leveraged by downtown peak period surcharges, was forfeited for political reasons, and was otherwise ready to rock and roll from a technical/operational standpoint. Unfortunately, the only way governments around here can raise revenue is to wait for any given structural deficit problem to be a do-or-die crisis, so from the politician/government staff side it's a question of pick your target poison for public backlash (e.g. Cook county going for a sales tax increase since property tax was off the table and decreasing in real terms every year).

You also omit the fact that the rates were drastically increased with the sale, so they are almost sure to bring in much more than $30 million. In fact the Blair report estimated that in year 5, NET revenue would be "anywhere from $85 million to $135 million." Let me know when you find risk-free Treasuries paying between 8 and 13 percent. (The answer is "in 1981.")
Yes, but:
1. now the city doesn't pay for maintenance, which is in the millions per year
2. the city doesn't have to make the capital investment to upgrade the infrastructure, or rather replace meters with pay-and-display boxes. These boxes would be required as part of any rate increase whether being operated by city government or the private operator. As with all capital investments, the private sector has an inherent advantage over government as the assets can be depreciated to reduce the corporate income tax burden - meaning, when all is said and done, corporations pay around two-thirds to three-quarters what government does for capital improvements depending on their specific tax situation. This is the same logic that was used in the transit industry in recent decades to have equity outfits purchase/own railcars and buses then lease them back to the transit agency, with the agency saving money over buying them directly because the owner passes the tax savings through the lease agreement.
 
Did you read the IG report? It goes over the Blair report in detail and specifically argues that the Blair report was only tasked with considering what a private company might pay for the meters, and not what the meters were worth to the city. These are two completely different things. The biggest difference is in the discount rate. The private sector employs a much higher one than the public sector because of the need to raise funds and repay lenders at higher rates. The Blair report used a discount rate of "between 10 and 14 percent." I've looked at a lot of cost-benefit analyses. Nobody uses a discount rate as high as even 10 percent for the public sector; 7 percent is typically used as the most conservative discount rate.

Furthermore, this is a 75 year lease. Discount rates start to lose meaning when you are looking that far into the future--the IG report notes that the first 37 years of the lease were valued at $1.08 billion, whereas the last 38 years were valued at only $77 million. Therefore a 75-year lease was not necessary. Do you have any substantive arguments against the IG report?

Second, you're wrong about what the city is doing with the money. The parking meter lease was explicitly intended to go toward filling today's budget holes ($150 million last year alone). That means it's not all going into the bank and collecting interest. As a CTA employee, you know all about diverting capital funds to operating expenses. Second, even if the whole sum were functioning as an endowment and we were living off the interest, the value of the meters is expected to rise over time, while the interest on a billion dollars, drawn out and consumed continuously (i.e. not compounded), is not.

You also omit the fact that the rates were drastically increased with the sale, so they are almost sure to bring in much more than $30 million. In fact the Blair report estimated that in year 5, NET revenue would be "anywhere from $85 million to $135 million." Let me know when you find risk-free Treasuries paying between 8 and 13 percent. (The answer is "in 1981.")

If you don't like the opinions, why keep coming back for more? ;)

As for this inspector general report...I view his conclusions with a lot of skepticism. His rebuttals of expected criticism come down to "I'm right and the other people are wrong" and his assumptions, to me, are no more or less valid than Blair's or the alderman's report. In particular, I find his "wholly optimistic" and "wholly pessimistic" valuations of future revenues to be seriously skewed towards an optimistic viewpoint. Given his "midpoint" valuation is much higher than even the alderman's large assumptions gives me reason to pause and consider whether the figures he used were sound. Further, his dismissal of the "impossibility argument" is, IMO, absurd, completely misses the point and is as biased and unscientific as anything Daley pulls out of his arse.

Another point I think the IG minimizes is the cost of upgrades to the meters. The city would not have been able to pay for those upgrades given currently financial constraints, which would have limited their ability to collect all of that supposed new revenue. On that same line of thought, how was the city going to enforce over-night and late night violations? With city/union labor? How much would that have cost them and how does that impact revenue projections?

One point I disagree with YOU on is the fact that Blair's report did do evaluation of the expected future revenues of the meters. The report didn't focus on that aspect, but it certainly provided an estimate, which was dismissed out of hand by the IG as conservative.

And are you really surprised by Daley's reaction? Really? He is, after all, a politician who needs to provide a succinct sound bit to the press. But further, he isn't exactly a man known for his wit and intelligence at press conferences. To me, this is classic Daley...for better or for worse.

I completely agree with the IG regarding the way this particular deal went through (and the way business gets done in this city in general). But I have to come back to: why this deal? Why now? After two decades of making shady deals and ramming his agenda through the city council, why is the public finally going nuts? The answer in my mind is simple: you don't mess with people's "right" to drive EVERYWHERE.

I don't view this deal as particularly great for the long term financial health of the city, but I'm not particularly convinced by the arguments being shopped by the IG or our aldercreatures, either. I do find the public outrage over the entire episode to be completely selfish and, quite frankly, pretty hypocritical given their tolerance over the last two decades.
 
^ No, it will come out to the sidewalk. For staging reasons, they are framing the back first (so the crane can sit on their lot instead of in the street). The next phase of construction will probably require a lane closure on Chicago.
 
Well yes, I'm not saying the meters should have been leased out to the private sector, but given that they were the city got a good price. Once public goods/services are taken to the private sector/free market, they have to abide some of the basic groundrules far outside the control of a mere municipal government.

So if I have something that's worth $100 and I sell it to somebody for $50, I should be satisfied knowing nobody else would have paid more? I realize you're not necessarily defending the decision to lease the meters, but it seems silly to start with the assumption that they were going to be leased, and that the terms of the lease we wound up with were the only possible terms. The IG report has a list of different lease terms that would have raised the necessary revenue if the city really needed it.

Yes. 75 years ago, parking meters didn't exist. 75 years before that, cars didn't exist. To fork over $1.1 billion now is take on a lot of risk over what the future holds. It's not clear that the city could have gotten $1.08 billion for a 37 year lease (if they could have, then by all means they should have, but I suspect that would have changed some of the fundamental assumptions of the private equity investor).

Considering the relatively trivial cost of the second half of the lease term, it's not that huge a risk. Furthermore, the city has already told an alderman that it can't change meter pricing without paying back the company for the foregone revenue. If that's part of the lease, then if we all get our jet packs in 20 years and leave parking meters behind, Morgan Stanley will just get its money back (money, of course, that we would have already spent). As for your second point, by the analysis used by the city itself, the valuation of a 37-year lease would have been around $1.08 billion. What are you saying would be so different about a shorter-term lease?

Going back to a previous point I made, it's impossible to have an honest adult conversation about revenue in this city (country?) anymore.

Sure, I agree with this, but...

It's a fallacy to think City government could have raised rates as you say - in fact, raising meter rates was proposed as part of balancing the 2007 operating budget but shot down for political reasons.

I'm sorry, this is absolute BS. The City DID change the meter rates! It just did it as part of a long-term lease. Let me ask you, exactly how many people in the city of Chicago are falling for this ruse? How many people somehow believe that the City leased the meters and the big bad private company is the one that jacked up the rates in a way that the City couldn't have foreseen? I'm guessing roughly zero. Who is everybody in the city pissed off at? Morgan Stanley? No. They're pissed at the City because they have the basic competence to understand that the City is the main actor here. This issue was also explicitly addressed in the IG report.

Unfortunately, the only way governments around here can raise revenue is to wait for any given structural deficit problem to be a do-or-die crisis, so from the politician/government staff side it's a question of pick your target poison for public backlash (e.g. Cook county going for a sales tax increase since property tax was off the table and decreasing in real terms every year).

Yes, the government funding system all over the country, especially in Cook County, is broken. It's especially broken here because the local levels of government (we can at least agree on county and state, right?) are flagrantly corrupt and nobody trusts their tax money with them. None of this is an excuse for the City to enter into such a lousy lease. On the contrary, when the City does something like this, in the disastrous manner in which it was done--rushed, secretively, with zero room for public comment--it makes people trust government less and makes the problem worse.

Yes, but:
1. now the city doesn't pay for maintenance, which is in the millions per year

$3-4 million per year, with a significant increase to install pay boxes. But note the word "net" in my sentence.

2. the city doesn't have to make the capital investment to upgrade the infrastructure, or rather replace meters with pay-and-display boxes. These boxes would be required as part of any rate increase whether being operated by city government or the private operator. As with all capital investments, the private sector has an inherent advantage over government as the assets can be depreciated to reduce the corporate income tax burden - meaning, when all is said and done, corporations pay around two-thirds to three-quarters what government does for capital improvements depending on their specific tax situation. This is the same logic that was used in the transit industry in recent decades to have equity outfits purchase/own railcars and buses then lease them back to the transit agency, with the agency saving money over buying them directly because the owner passes the tax savings through the lease agreement.

This is yet another thing that is addressed in the supposedly amateur IG report:

According to federal tax law, in order to claim accelerated depreciation, the private concessionaire must demonstrate effective ownership of the asset, which requires the lease term to be at least 75 percent of the useful life of the asset. These larger tax deductions allow the private concessionaire to realize a return on its investment faster than it otherwise would [...] However, based on available research and a depreciation schedule from another jurisdiction, the useful life of the parking meters is not likely to exceed 10 years. Thus, extending the length of the lease to 75 years was not necessary to allow the concessionaire to claim accelerated depreciation and thus increase the size of the upfront payment.

Besides that, the tax advantage on an expenditure estimated at $50 million does not outweigh foregoing over $900 million in net present value.
 