It's not really a very viable model anymore outside of the already-existing ones. Too few screens, too small capacity, and without stadium seating, they can't effectively compete - and they're almost always cheaply done, with small screens, weirdly shaped rooms, sound bleed. Then you get into code issues and it makes it even trickier at this point than it was in the 70s and 80s when most of these splits occurred. It would almost be easier to build out a vacant big-box into a multiplex. Assuming they're using essentially the same layout as the Hyde Park had previously rather than gutting it and re-dividing, I'm betting they'll squeeze one more screen out of the stage.
The Harper was converted much like the Evanston was, by extending the balcony floor towards stage, so it has seats in the 350 range. (That also made other reuse possibilities more difficult). So each auditorium is roughly twice the size of the screens at the 400. They've done a good job bringing the 400 back from a really bad condition, so maybe they can pull it off here - and the 400 obviously draws a lot from Loyola. The LaGrange was spruced up nicely too. It will be difficult. I'm extremely surprised that it's come back to a proposal like this after all these plans. But no, I don't think it would be a viable model elsewhere in the city.
It's still easier usually to do a new build than to go into existing space. Some chains still do it but you end up with weird layouts and non-optimal theater shapes.
A shitload of corners were cut by everyone who did splits into the twins, tris, and quads. None of it would stand a chance in hell of passing code for structural, electrical, ect. It might be better done today if whoever is holding the purse strings is willing to spend on a quality conversion. Still it is definitely true that a small operator in this city is working at a major disadvantage to the circuits that have 10+ screens in a complex. The only exception would be Landmark but that is another animal.