Thanks Shawn. Barely remember that AHA building.

I was looking for a photo of the old Park Hyatt, but there isn't one on Emporis. Google wasn't all that helpful either, since most hits refer to the new one. But buried in there finally was the following from the website anthemion-dot-com:

oldparkhyatt.jpg
 
Thanks for the pics EarlyBuyer! Will those parkhomes have a green roof? If not, what a missed opportunity. After all, they are "park homes", and given the low density land use, they really should be an extension of the park. Not to mention the thousands of units that look down upon these roofs... please, plant something.
 
I posted about this before but now we have a rendering:

Last updated: August 25, 2008 11:53am
Bold Begins $10M Apts Over Stove Factory
By Cari Brokamp News

chi_boldlandhlofts.jpg

Bold L&H Lofts

CHICAGO-Bold Development has begun a $10 million redevelopment of a historic East Garfield Park property to bring 114,000 sf in 68 apartment units to the building. The six-story 2620 W. Washington Blvd. building was purchased by Bold last month for $3.7 million. The building, which was designed in the 1920s by architect Paul Gerhardt, is up for landmark status on both city and national levels, according to Bold president Steve Olsher.
 
^ I don't really see that as worthy of national landmark consideration, but ok. If preservation tax credits are helping the project happen in lieu of being turned into a vacant lot, I'm all for it.
 
.......I know this is a little off topic, but ........does anyone know when the Carson's Store (Sullivan Center) rehab (at least the exterior) will be complete ?

A little bird told me ....

"According to architects working on the project, the restoration of the cast iron ornament at the base of Sullivan Center (former Carson Pirie Scott store) should be completed in mid-2009. Harboe Architects is supervising the restoration process."
 
Is the building that will replace it going to be taller, denser? If not, then screw it all :whip:

This is what a professor at Loyola told me...and a late response at that with respect to Damen Hall.

The building that will replace it will be 4 or 5 stories and will share architectural features similar to the Cudahy Library and Information Commons.

I am told the reason is to make it 'fit' better with a lot of the buildings that already exist on campus. Damen Hall also apparently as a lot of issues in terms of quality which is prompting the tear down. Also, since they now have the former Mundelin College building, the plan is to shift any left over classes from Damen to there.

Either way there is a lot of things being built in and around Loyola right now, including a pretty sizable mixed use TOD near the station.
 
Its all right, but between that and the Grandville, the Loyola area is starting to look mighty dense from my view at Sheridan and Foster.

^ You're kidding, they're going to tear that whole thing down? All 10 stories of it? What an effing waste. :hell:

I suppose that Loyola's new PoMo-compromised library, blocking views of the lake and messing up its most historic buildings, really fits in with their original master plan too?

It's a B-grade building, but I'm with VivaL - it has merit and no sense in tearing it down. The architects were Graham, Anderson, Probst and White I believe.

Trust me Honte, it really does need to go. Not only is the whole inside of the building outdated, but the exterior has major structural flaws that have been patched with metal plates and concrete patches for probably 20 years. Also, the building has major circulation issues (traffic wise) that would require the complete gutting and reconstruction of all of the floors. The inside right now is only served by escalators and one elevator. The escalators are actually now in violation of the fire code since they are an open stair well all the way up 10 floors with no fire door isolation. On top of all that, the 10 floor structure is a horrible shape for classrooms, it causes massive congestion as hundreds of students try and switch floors all at once, there is no solution to that.

Re Info Commons, it doesn't actually do any damage to original library or Chapel. It connects to the library through the previous mutation from the same 60's campus expansion that brought us Damen Hall. The covered Walkway only connects to the Chapel through a doorway that was rebuilt in the 60's as well and didn't require any alteration to the building itself at all. As far as Lakefront views, if you have ever been in the info commons you might agree that it was completely worth it. Its actually one of my favorite buildings in the city. It has little swing out window vents on the lake side that it uses to draw in cool lake air to cool the building and you can hear the waves crash as you study. Also, it has a roof deck where you can go out and enjoy the lake from outside. I really like the IC as does every student at LUC that I have talked to about it.

The building that will replace it will be 4 or 5 stories and will share architectural features similar to the Cudahy Library and Information Commons.

I am told the reason is to make it 'fit' better with a lot of the buildings that already exist on campus. Damen Hall also apparently as a lot of issues in terms of quality which is prompting the tear down. Also, since they now have the former Mundelin College building, the plan is to shift any left over classes from Damen to there.

The Damen replacement is not going to be in the Deco style of the Library, IC, and Chapel, it is going to be in the older, red brick style of Dumbach Hall and Cudahy Science building. It will basically be a copy of Dumbach hall, balancing that half of the campus between three red brick olde style buildings and 3 limestone deco style buildings.

All of the Classroom space in Damen is moving into the newly renovated Mundelein building.

Also, re the new quad. They were laying sod today on the quad, word is it is supposed to be ready by the end of September. Its looking really good. Can't wait for the East Quad, between the line of red buildings and the IC, to be ready next spring. Loyola will be a whole new school when all this is done... We'll finally have a real campus for once!
 
A little bird told me ....

"According to architects working on the project, the restoration of the cast iron ornament at the base of Sullivan Center (former Carson Pirie Scott store) should be completed in mid-2009. Harboe Architects is supervising the restoration process."

....thanks, so, Carsons and 108 will finish up at about the same time (within a couple of months anyway)
 