CF Pacific Centre Developments


Not sure either.
My guess is that the remaining levels above the mall have tall enough ceilings to repurpose (former lobby and ballroom, etc) and provide a buffer for future construction. That space could also be useful during construction for a site office and storage.
When the Eatons building was reno'd, columns in the parkade were beefed up, so I'd expect the same here, but don't know about columns through the 2 mall levels that would in theory remain occupied.
Also, I figure those columns would need beefing up if the new tower is a lot taller than the old tower.
 
Last edited:
By me today:

Note that the columns are not in a perfect grid.
PHHhUIG.jpeg


bfzEoc6.jpeg
 
This section of the previous rezoning for the renovated tower has the floorplans with the columns

https://vancouver.ca/files/cov/appendix-c-w-georgia-architectural-pages-19-to-48.pdf

Thanks.

The floor of Level 5 must be a transfer slab based on the column spacing on the floor below (from these abandoned hotel plans).
Whether that transfer slab can support a 50 storey hotel is another matter
(by comparison, the transfer slab at Hotel Georgia Residences was a whole storey tall).
So that's probably why they stopped there.

Tv1iDxm.png

https://vancouver.ca/files/cov/appendix-c-w-georgia-architectural-pages-19-to-48.pdf
 
Last edited:
Williams-Sonoma are opening 3 stores in part of the Nordstrom space at CF Rideau Centre (Ottawa) - Williams-Sonoma, Pottery Barn and West Elm.

Could they be a possibility for one of the spaces here?

Ron.
 
Williams-Sonoma are opening 3 stores in part of the Nordstrom space at CF Rideau Centre (Ottawa) - Williams-Sonoma, Pottery Barn and West Elm.

Could they be a possibility for one of the spaces here?

Ron.

If those stores left their current locations it would be pretty devastating for South Granville's retail strip.
 
If those stores left their current locations it would be pretty devastating for South Granville's retail strip.

I still remember when they were slated to shut down on South Granville even to the point of holding a liquidation sale over an entire weekend with everything 50-70% off only to go back to staying open at the last moment. I got some good espresso cups for dirt cheap haha.

I do like that row of furniture stores and boutiques in South Granville.
 
The floor of Level 5 must be a transfer slab based on the column spacing on the floor below (from these abandoned hotel plans).
Whether that transfer slab can support a 50 storey hotel is another matter
(by comparison, the transfer slab at Hotel Georgia Residences was a whole storey tall).
So that's probably why they stopped there.

Damn, you're good! :tup:
 
By me Sept 29th.

You can see the 5th floor slab.
The remaining column stubs look shorter than before and there's no rebar exposed.
Curious whether they can rough up the surface and tie-in extra thickness to that slab on top of it,
maybe to the height of the stubby columns remaining.
Those lines look new.

tMFZ7Ir.jpeg


Full size:
kWzSUM0.jpeg
 
Last edited:
Sent around the office today.

This weekend they'll be craning some construction materials through an opening in the curtain wall for the Lululemon office renovations (5th floor)
(above the old Nordstrom).

Lyldym7.png
 
Williams-Sonoma are opening 3 stores in part of the Nordstrom space at CF Rideau Centre (Ottawa) - Williams-Sonoma, Pottery Barn and West Elm.

Could they be a possibility for one of the spaces here?

Ron.

They're opening a big store at Oakridge Park so who knows what that means for South Granville.
 
By me Sept 29th.

You can see the 5th floor slab.
The remaining column stubs look shorter than before and there's no rebar exposed.
Curious whether they can rough up the surface and tie-in extra thickness to that slab on top of it,
maybe to the height of the stubby columns remaining.
Those lines look new.

My structural engineer friend said "it doesn't work that way".:haha:
 
My structural engineer friend said "it doesn't work that way".:haha:

Well you were partially right, the transfer slab will need to be strengthened to support a tower returning on this site, but the columns are not a part of that. They were just demolished there for easy of demo and to avoid too much detail work around the L5 slab that now needs to be waterproofed.
 
Well you were partially right, the transfer slab will need to be strengthened to support a tower returning on this site, but the columns are not a part of that. They were just demolished there for easy of demo and to avoid too much detail work around the L5 slab that now needs to be waterproofed.

Thanks!
 


Back