Looks good man! It will help keep things more tidy and not so overly busy on the main forum thread. Meaning less posts to shift thru..
 
if we are counting cranes that simply have a stationary base, there is an additional smaller crane at union square, working over the parkade in the park. It's not concreted into the ground, but while in place is weighted down at the base with {concrete? cast iron?} ballast and is unable to move, and has been stationary on site for some months.
 
Last edited:
It's still up in the photo's that srperrycgy posted yesterday from his walkaround parts of the WLRT route.
 
Having not seen this other crane at Union Square, I guess I'll put it to you guys. Can it be said to be a "tower crane," and should it be included in the count?
 
The Bow

P1000591.jpg

P1000595.jpg

P1000602.jpg

P1000606.jpg
 
Great pics OptimA. I've reposted these in the Bow Thread, of course reuploaded to imageshack again instead of linking them. Credit also given. I trust you have no objections?
 
If that is the other crane, if one could even call it a crane, at Union Square, I don't see why it should be in the count.
 
It has a horizontal jib not visible in the picture. It is not what we normally refer to as a tower crane, though it is definitely a crane, and a stationary one at that. It sits on a concrete slab, and is held down by a stack of ballast blocks.

I think our definition for inclusion of cranes in the count should probably be based around the common method of achorage: Base tied to poured concrete. By that definition, the second crane at union square would not be included.
 
It has a horizontal jib not visible in the picture. It is not what we normally refer to as a tower crane, though it is definitely a crane, and a stationary one at that. It sits on a concrete slab, and is held down by a stack of ballast blocks.

I think our definition for inclusion of cranes in the count should probably be based around the common method of achorage: Base tied to poured concrete. By that definition, the second crane at union square would not be included.

By that definition we couldn't include Bow Valley College, which most definately is a tower crane.
 