Canadian 1
New member
Country: Canada
State/Province: Alberta
City: Edmonton
Building Name: The Shift
Native Name:
Other Names:
Street Address: 106 st and 102 Ave
Postal Code:
Architect(s):
Developer: Autograph Development
Official sources:
Unofficial sources:
Interesting Facts/Records (in own words): Replaced Previous Twin Tower Proposal
Official Building Website URL:
Wikipedia.org URL:
CTBUH.org URL :
Structurae.de URL:
Coordinates (with decimal fraction): 53.54269632512116, -113.50257882520786
Heights--
PLEASE PROVIDE SOURCES FOR HEIGHTS, OTHERWISE WE WILL ASSUME THEY ARE ESTIMATES AND HEIGHTS NOT BE SHOWN.
Reminder: (Use Meters)
- antenna:
- spire:
- roof: 50m
- top floor:
- other heights:
Current Building Status (Built, Proposed, Cancelled, Destroyed, etc...): Proposed
Construction Dates--
- started: 2026
- finished: 2033
- destroyed:
Above ground floors: 12
Underground floors: 2
Unit count:
Building Use(s): Residential, Retail
Structure Type(s): Highrise
State/Province: Alberta
City: Edmonton
Building Name: The Shift
Native Name:
Other Names:
Street Address: 106 st and 102 Ave
Postal Code:
Architect(s):
Developer: Autograph Development
Official sources:
Unofficial sources:
Interesting Facts/Records (in own words): Replaced Previous Twin Tower Proposal
Official Building Website URL:
Wikipedia.org URL:
CTBUH.org URL :
Structurae.de URL:
Coordinates (with decimal fraction): 53.54269632512116, -113.50257882520786
Heights--
PLEASE PROVIDE SOURCES FOR HEIGHTS, OTHERWISE WE WILL ASSUME THEY ARE ESTIMATES AND HEIGHTS NOT BE SHOWN.
Reminder: (Use Meters)
- antenna:
- spire:
- roof: 50m
- top floor:
- other heights:
Current Building Status (Built, Proposed, Cancelled, Destroyed, etc...): Proposed
Construction Dates--
- started: 2026
- finished: 2033
- destroyed:
Above ground floors: 12
Underground floors: 2
Unit count:
Building Use(s): Residential, Retail
Structure Type(s): Highrise