Billings Development Thread


f22c5966-00a4-11df-b222-001cc4c03286.image.jpg


By Sletten Architects

The only thing I would change on it would be to make the facades more symmetrical. Like having the Southwest facade look like the south facade. Now the south facade has the "columns" look. I emailed Sletten today and suggested this idea.
 
The only thing I would change on it would be to make the facades more symmetrical. Like having the Southwest facade look like the south facade. Now the south facade has the "columns" look. I emailed Sletten today and suggested this idea.

Good call.

Urban boy,

Open space is good but devlopment is even better.
 
I think the second version is beautiful and would help with street level appeal for Billings. Downtown billings has some large towers for a city it's size and things like this courthouse in the midrise category add to density and urbanity of the streetscape. I think it's great
 
Tunnel under Zimmerman Park?

a76b6fe2-3318-11df-bc94-001cc4c002e0.image.jpg

Image from: Billings Gazette

It’s a long shot, and it could take years to complete, but city officials are considering blasting a tunnel through the Rimrocks to replace the tortuous Zimmerman Trail.


The city has long wanted to improve the former sheep trail, which is one of the few roads that descend from above the Rims into the city. The city has $7 million from the 2005 federal highway bill that is supposed to be spent on improving Zimmerman, but the project has languished while other projects, such as Shiloh Road and the Bench Boulevard connector, have taken precedence. The city thought about moving the money to the other projects, but couldn’t do so without an act of Congress.



Now, with the $7 million still waiting for a plan, Public Works Director Dave Mumford is working on three improvement options for Zimmerman Trail: make minor improvements to the road, rebuild it to the arterial street that it has become, or build the tunnel, which would then allow the existing road to become a bike and pedestrian trail.
The city will work with an engineering firm to partially design each of the three options. The early design work should be finished within six months and should give decision-makers an estimated price and other information for each option. “At that point, we go forward with whatever option the community wants,” Mumford said. “Then we start looking for federal highway funds.”


Because federal money is involved, the Policy Coordinating Committee, and not the City Council, will choose one of the options. The PCC includes a representative from the City Council, a Yellowstone County commissioner, the regional head of the Montana Department of Transportation and the president of the county Planning Board.

The options


Mumford said the minor improvement option would add an uphill passing lane on part of Zimmerman Trail, a bike path and some widening in other spots. The $7 million from the highway bill would probably be enough to pay for that option, Mumford said.
“It would be enough to make it a better road than it is today,” he said.


The next option — and probably the least popular among nearby residents — would be to rebuild the road into an arterial, which is wider and busier than ordinary streets. That version of Zimmerman Trail would likely have multiple lanes and would require significant excavating and blasting, something that isn’t appealing to neighbors who live below the roadway. “Of the neighbors in this area that I’ve spoken to, they are at least equally as concerned as we are with these improvements,” said Sharon Ellis, a homeowner who lives on Nolana Drive. Ellis liked the idea of a tunnel, but she wondered about the cost.


At an estimated cost of up to $60 million, the tunnel option would clearly be the most expensive, but it would eliminate the danger of driving on Zimmerman Trail. The 1,000-foot-long tunnel would begin somewhere around the first big bend in Zimmerman Trail as you go uphill. It would go underneath the county-owned Zimmerman Park just west of Zimmerman Trail and come out on the north side of Highway 3, where drivers would loop around to get on that road. The tunnel would have a slight curve, Mumford said, because drivers tend to go too fast when they can, well, see light at the end of the tunnel.

The history


As the city’s West End has grown, so has the amount of traffic on Zimmerman Trail, which can become slippery in the winter and is closed occasionally during bad weather.
The roadway was built over several years beginning in 1910 by Joseph Zimmerman, a cattleman who blasted the path through the Rimrocks as a way to move livestock. The county owned Zimmerman Trail from 1929 until 2005, when commissioners gave the road to the city.


The $7 million appropriation in 2005 from then-Sen. Conrad Burns came as a surprise to county officials, who at the time were responsible for the road but had no immediate plans to work on it. The county had never asked for the federal money. County commissioners were irritated to learn that the city had asked for the money, even though the city didn’t own the road.


In 2007, Mumford told The Billings Gazette that former City Administrator Kristoff Bauer had requested the money in 2005 because Bauer didn’t want the city to accept the road unless it could be brought up to city standards. But the city could never come up with matching funds for road improvements, so Zimmerman Trail was never improved.
“They have to do something with Zimmerman Trail, whether it’s done in place or they do a tunnel or they go some other route, because the traffic on it is unbelievable,” said Bill Johnson, who has owned a home on Nolana Drive below Zimmerman Trail for 19 years. “It seems like it’s a bottleneck. In the mornings, there’s an awful lot of traffic on it.”


The city also plans to begin work this year on an “inner belt loop” that would connect the Heights to the West End at or near Zimmerman Trail with a new road that will run north of Billings Logan International Airport. It should be years before the land inside the inner loop is fully developed, but city planners are expecting significant growth in that area in the coming decades.
Many local officials are convinced that something needs to be done with Zimmerman Trail, given its growing role as a link between the Heights and the West End. Funding the tunnel option would likely take several years of heavy congressional lobbying.
 
^

That looks great. I would perfer the tunnel. Also how much land are they talking about with the inner belt loop that will be devloped?
 
I'm curious how many lanes they're considering for the tunnel option. It seems like it would be a waste not to at least have two lanes each direction to handle future growth, but it sounds like the neighbors around there don't really care for it.
 
Protest of federal courthouse contract denied

The Government Accountability Office on Wednesday denied a protest filed by Sletten Construction of Great Falls over the contract award for construction of a new federal courthouse in downtown Billings.
The GAO’s dismissal of the protest means that planning and construction on the courthouse can resume, according to the General Services Administration, the agency that is in charge of the project.
“What does this mean to Billings? It means that GSA will move forward as originally planned,” GSA spokeswoman Sally Mayberry said. “Next steps include having GSA’s project team meet with the project stakeholders and contractors to work out the new plan for project completion.”


Sletten was one of six finalist companies for the courthouse contract, but in late December the GSA chose Mortenson Construction of Minneapolis and awarded the company a $59.4 million contract. Sletten’s bid was $8 million less, company officials said.
A few weeks later, Sletten filed its protest. The company claimed that the GSA violated the terms of its own request for proposals by failing to consider price, especially as the proposals became more equal on technical grounds during the scoring. The GSA has said repeatedly that it used a “best value” approach and that price was just one of several factors used to score the proposals.


The GAO, known as the investigative arm of Congress, had 100 days to investigate Sletten’s protest after the company filed it in January. GAO head procurement attorney Ralph O. White said Wednesday that the agency’s ruling is sealed until both Sletten and Mortenson have a chance to review it. Proprietary information will be redacted, and a copy of the ruling should be released by next week, White said.
Sletten CEO Erik Sletten declined to comment, saying that his company hadn’t reviewed the ruling yet.
The GSA released a statement after receiving the GAO’s ruling. GSA spokeswoman Mayberry said the courthouse project can now continue as planned. She said there will be a stakeholders’ meeting in early May where everyone involved in the project will regroup and plan the next steps.


“GSA’s goal is to focus on getting people to work and getting the project under way as soon as possible,” Mayberry said. “More information will be available once the project team has had the opportunity to meet and assess the revised project schedule.”
The 146,700-square-foot courthouse will be built on a 63,000-square-foot site next to the Yellowstone County Courthouse. The GSA paid $3 million for the site, which was pieced together like a jigsaw puzzle from different landowners. Half a block of North 26th Street near the courthouse has already been permanently closed to traffic, and the site is ready for construction. Two buildings were dismantled to clear the site.


he new courthouse will replace the James F. Battin Federal Courthouse, which is laden with asbestos and will likely be torn down someday. The new courthouse will house the federal courts, the U.S. Attorney’s office and the U.S. Marshal. The Bureau of Indian Affairs and the Bureau of Reclamation, now in the Battin courthouse, will be moved to new offices eventually.


For several years, those involved in the project were expecting a privately owned courthouse that would be leased back to the GSA. But a year ago, Sen. Max Baucus, D-Mont., announced that the GSA would spend up to $80 million in stimulus funds on a courthouse owned by the GSA.


Had the GAO agreed with Sletten’s protest, the GSA could have been ordered to restart the bidding process. GSA officials were worried about that prospect, because the lengthy process would have to be completed before the end of the fiscal year on Sept. 30.
 
This sucks! The majority of people liked the Sletten design way better than :gaah:Mortenson's ugly design and plus, Sletten's beautiful design came in at 8 million dollars cheaper at around 52 Million bucks vs Mortensons at around 60 Million Bucks. Stupid move of the GSA!!!
 
Last edited:
This sucks! The majority of people liked the Sletten design way better than :gaah:Mortinson's ugly design and plus, Sletten's beautiful design came in at 8 million dollars cheaper the Mortinsons. Stupid move of the GSA!!!

Thanks. I agree with you 100%
 
Status on new courthouse...

There has been much news about the new courthouse but here is some good news I think...the judge Richard Cebull, didn't like the Mortinsen design in favor for a more traditional design. Hopefully, there might be a new design in the works?:shrug:
 
Skyrise406 said:
This sucks! The majority of people liked the Sletten design way better than Mortenson's ugly design and plus, Sletten's beautiful design came in at 8 million dollars cheaper at around 52 Million bucks vs Mortensons at around 60 Million Bucks. Stupid move of the GSA!!!

I'm with you - to a certain extent. I would choose the Sletten design providing what's shown in the rendering isn't stucco and cast concrete. If it is I would prefer Mortenson's design in that it appears to be using marble and stone.
 
GSA unviels new "Tweeked" design

The new federal courthouse in downtown Billings will be five stories, with three courtrooms on the top two floors. The building is being designed to reflect the character of the surrounding area, from infusing sandstone into precast concrete to building local landscape features into doors and walls, building designers said Wednesday. “We’re looking to find materials that really connect to this place,” said Kate Diamond, an employee of NBBJ, the company tasked with designing the building.Local officials and the public got their first extended look at the courthouse design at an open house Wednesday in downtown Billings. The General Services Administration hosted the event, with representatives from NBBJ and Mortenson Construction, the company that will build the $60 million courthouse. The first floor will house the federal Clerk of District Court’s office, while the U.S. Marshals Service will be on the second floor and the U.S. Attorney’s Office will be on the third floor. A federal magistrate’s courtroom will be on the fourth floor and two courtrooms on the fifth floor will be for the U.S. District Court. Solar panels on the roof will collect 3 percent of the building’s energy needs, while pumps at the other end of the building will pull energy from underground to warm and cool the building. The courthouse is expected to earn a LEED Gold certification, a rating that recognizes the building’s high sustainability, NBBJ officials said. The building is designed to use daylight whenever possible and features a walkout terrace over the third floor. Anyone who passes security and is in the courthouse can access the rooftop terrace. “The notion is people can go out there for some respite,” said NBBJ’s Jeanne Iannucci. The building’s final design will be reviewed and approved in mid-July by GSA officials, and construction is expected to begin in the fall. Work will continue through the end of 2012. Marvin Doster, project head for Mortenson, said his company intends to award 60 percent of the subcontracting work to Montana companies. Interested contractors can contact the company directly, but Doster strongly recommended signing up with the federal government’s contractor database at www.ccr.gov.

Turnout for the meeting was light compared with Monday night, when more than 200 people showed up to hear more about job opportunities on the project. Bidding will begin this summer and will be done in phases, Doster said Monday night. Local officials seemed pleased with the design. Yellowstone County Commissioner Bill Kennedy said the courthouse will fit in well with other downtown buildings and reflect natural features like the Rimrocks. Kennedy said he is particularly excited about the GSA’s next building project, which will relocate two federal agencies from the James F. Battin Federal Courthouse to a new home. The Battin courthouse is contaminated with asbestos, which must be carefully removed if the building is to be torn down or reused. The GSA is working on the new building project now and will know more this summer, according to Sue Damour, regional head of the GSA. The agencies’ new home could be a new building or a renovated building, but it will be privately owned and leased to the GSA, she said. Kennedy said the county was interested in obtaining the Battin courthouse in the future and renovating it for a joint city-county justice center, possibly with courtrooms on the first few floors and private offices above. That would require a federal appropriation, but exploration is already under way, Kennedy said.


872e99b0-7423-11df-8605-001cc4c03286.image.jpg

(C) NBBJ
 
Last edited:


Back
Top