I would cut them some slack if they came up with something original ie. dog ate the sales contracts, waiting for the white buffalo, stars not in right alignment, etc.
 
I would cut them some slack if they came up with something original ie. dog ate the sales contracts, waiting for the white buffalo, stars not in right alignment, etc.

I think a white buffalo eating the contracts during a misalignment of the stars is more believable than 80% sold and not under construction.
 
It really makes you wonder what the actual problem is. Is Nassi being less than truthful when he reports a high percentage of deposits and locked in construction prices? Or could it be that he's met all his requirements, but simply can't get the funding. According to news reports, lenders aren't loaded with a lot of cash to invest at this point.
 
I havent drove by the Aura side of the 600 block lately, are they actually pouring the asphalt for the parking lot yet? Also, is the sales office still open?

I'd like to personally go in there and ask Sherryl in person why the status of Aura is while they are in the middle of pouring the parking lot... then I'd like to see what her response is.
 
Walked by there yesterday. I don't see any asphalt going down. The construction fence still encloses the entire block, so the office is still closed. It's gonna need some serious TLC when it does reopen as the landscape tries to reclaim the property...
 
Aura is alive and well, we're just waiting on the lenders to finish up.
Ms. Fleeman might not have long to wait for Aura's lenders to "finish up". Corus closed at 14.56 today, down 40% in six months.
 
yeah the onsite sales office has been closed since the sidewalk etc work started a bit ago.....

looks like some of the cap mall sidewalk is finishing up so maybe it will reopen soon.....also the 7th st sidewalk is beginning to take shape!

PS nassi is probably still in hiding from some other project he took deposits on......
 
I was snooping around "Lot A" today and I noticed what appear to be cement bases for parking lot lights dotting the "Aura" site. I'd like to think they are piles, but a lot would have to be done before Aura got to the pile drilling stage. Only a superficial excavation (more like a flattening/smoothing - perfect if you want to "build" a parking lot) has occurred and there is no pile driller in sight. I guess it's over, at least for the time being.



Someone, please tell me those are piles.
 
Yes, I know, I know. Graswich is the author, and I am not sure whether it is his opinion or fact (it might be a little of both), but I thought I would post this anyway. From Sacramento Magazine:
Aura condos look doomed
Graswich | 30 July, 2007 11:49

The people who know won’t say this officially quite yet, but a second big condo dream on Capitol Mall is poised for the trash heap, at least temporarily. This would be the Aura project, which was supposed to rise next to a big fancy office tower on Sixth and Capitol.

The office building is making nice progress. Nothing is happening on the West side of the block, where Aura is supposed to rise. Well, almost nothing, unless you count paving a parking lot atop the Aura footprint as something.

Aura has been a little dodgy from the start. The project was announced with big fanfare soon after another big condo announcement on Capitol Mall – Capitol Towers, which failed weeks ago.

Aura has a big-league architect from New York and a big-league developer from Colorado. If you’re interested, you can see a very cool model of the project in a restaurant window near Sixth and Capitol Mall. The model comes complete with a tiny swimming pool.

As for the real thing, there were questions from the start. It wasn’t clear when the developer would actually own the land he proposed to build on. It wasn’t clear whether he actually had the financial backing to pound support piers and lift steel into the air.

Residential projects are much tougher to build than office projects, developers tell me. That’s why you see so many more office buildings going up in downtown Sacramento, and so few condos. High rise condos are especially tough, they say. And without financial help from the city and maybe a hotel to share some space and help pay the banks, big high rise condos pretty much won’t happen here.

There will be a collective urge to point fingers and establish blame once the negative fate of Aura is announced. But finger pointing won’t get high rise condos built in Sacramento.

It takes venture money up front – lots of it – and customers willing to pay more for a 1,500 square feet condo downtown than they would for a 3,000 square feet house 20 miles away.

There aren’t a lot of people willing to do that right now. Until there are, I wouldn’t necessarily believe anything a developer says about world class views in a world class city, by which they mean Sacramento.

R.E. Graswich writes a column for Sacramento magazine. He co-hosts the afternoon news on radio KFBK and reports nightly for CBS 13. Reach him at [email protected]

http://sacmag.com/blog/index.php?op=ViewArticle&articleId=214&blogId=8

Of course, this "article" is not really needed. Anyone can see that the Aura half of Lot A is being prepared to become a parking lot. No, those are not piles sticking up out of the ground.

I would love to confirm this, but my calls and e-mails to Ms. Fleeman, Mr. Nassi and BCN's info desk have gone unanswered.

I really thought this project could do it. It was not too big (For those who think Sacramento cannot handle twin towers); I thought it had a butt-load of buyers (Of course, Nassi could have been lying through his teeth about that); and I thought the construction price had been locked in (Could also be a lie). Even with those three things going for it, you need money to build buildings; and I guess lenders are not willing to hand out piles of cash right now.
 
Last edited:
Yeah I don't really get it. Seemed like this project was handed to Nassi on a platter but still didn't happen.

I just don't get it.
 
Too bad for Aura. Not to be cynical but any high-rise that gets approve or propose I'm not going to get giddy about until I see steel rising. I guess we will won't see Epic anytime soon.
 
tombstone.jpg

I guess that's it... it's a sad year being that this was suppose to be the year of the crane in Sacramento.
 
unbelievable.

what is worse in my mind, is that nothing will be built on that parcel for a long time. the land is expensive and the lot seems a bit awkward. i just can't imagine a project coming along soon that would replace that surface parking lot.
 
Well this is the absolutely the worst possible news. I guess we can hopefully wait for what CIM proposes and what Saca does at J Street
 
unbelievable.

what is worse in my mind, is that nothing will be built on that parcel for a long time. the land is expensive and the lot seems a bit awkward. i just can't imagine a project coming along soon that would replace that surface parking lot.


Hey now. Wouldn't that be a great place for a new downtown Sacramento Nordstrom with a garden rooftop terrace restaurant and sidewalk cafe/bistro -designed by say Herzog and de Meuron? This would really liven up Capitol Mall. And they could design it so that when the market heats up again a condo tower could easily be added to the L Street side. Who needs a parking garage facing Capitol Mall anyway?
 
Last edited:
Did I miss something here? Did the city finally call BS on Nassi for the 10 mill loan option? Don't be so quick to throw in the towel. As we have all heard, Aura is alive and well and just waiting on the lenders to retract their loan proposals errrrrr uuuhhh..... I mean "finish" up the paperwork.
 
I’ve been wanting to get some real answers, so after rattling many cages, I got myself a source. This person spoke to me on the condition of anonymity, so excuse the way this post is worded.

I have great reason to trust my source’s information. This person confirmed a couple of things I’ve heard from other trusted “informants” – pieces of information not many other people know.

What follows is PARAPHRASED information I gleaned from a half hour conversation with my source. It has been checked by my source for accuracy; also, I invited this person to add any additional information I missed. I'm not interested in being overly negative, I just want to know the truth:


What’s the bottom line?
According to my source, the Aura project has about a “on a scale of 1 to 10, a 1” chance of occurring under current management (Craig Nassi). A better developer would have a greater opportunity for success. The building itself could be very successful – it is spectacular.

We’ve had a couple of other failures (most notably the Towers on Capitol Mall); is Sacramento the problem? Can we just not handle a big project?
My source says “NO!” Sacramento is “ripe” for a project (or projects) like Aura. It is capable of supporting high-rise residential buildings.

If it’s not Sacramento, why will Aura (most likely) fail?

According to my source, Aura will most likely fail because of mismanagement. Aura’s design is one of the most efficient my source has ever seen; it has very little dead space. So the mismanagement does not start with the architect – the building itself is fine. However, Mr. Nassi underestimated the project’s cost and sold (non refundable deposits) the units at too low a price. Mr. Nassi sold about 53% of the condos (however, buyers may be pulling out as we speak) averaging around $650 a square foot. In order to make the project “pencil out”, he may have to sell the other 47% at around $750-800 a square foot. In this market $750-800 a square foot is next to impossible. Put another way, Mr. Nassi planned for the project to cost around $125 million, most experts put the cost at around 138 million. But who knows the exact amount? Nassi only has a partial set of “hard” numbers. My source mentioned $160+ million as a potential cost. Basically, Mr. Nassi cannot collect enough money to make Aura profitable, because the market cannot bare costs of up to $800 a square foot.

Why are we not seeing any movement on Nassi’s end right now?
According to my source, Aura is at an impasse because WexTrust Capital’s (the “mezzanine” lender) accountants could not make the project pencil out. WexTrust took a long look at the project, but did not see it as a profitable enterprise (with 53% of the condos sold at around $650 a square foot – too low). Nassi is still looking for another mezzanine lender; however, he may be very near canceling the project.

Is Corus Bank still on board?
According to my source, Corus Bank (the primary lender – around 70%) is still on board, HOWEVER, it has not completed its “due diligence” yet, and it may be a while. This could lead to some scenarios that may severely damage the City of Sacramento – especially if Nassi is able to find a mezzanine lender. For example:

1) Corus won’t hand out money until later on in the building process, which means Nassi will be operating on the mezzanine lender’s money (maybe) and Sacramento’s money (definitely) to do the site prep, foundation work and, possibly, some of the structure. (Chances are, Nassi will have to hit up the City for further funds.) If Nassi gets building and Corus pulls out of the project, Aura will fail. That will set up a situation where the mezzanine lender gets its claim first. The City will get what is left over - maybe nothing.

2)If Corus gives funding to the project and it fails, Corus would be first in line to be repaid, then the mezzanine lender…………………then the City of Sacramento.

So, according to my source, Sacramento could stand to lose a lot of money if Aura continues and ultimately fails. If it loses money on the Aura deal, I (snfenoc) seriously doubt we will see the City provide other major projects with subsidies.

Do you dislike Craig Nassi?
My source does not have a problem with Mr. Nassi. However, he believes this project was (most likely) killed by his mismanagement and underestimation of costs. It is nothing personal. In fact, my source credits Mr. Nassi’s “vision”. However, Aura could seriously damage the City of Sacramento’s reputation, so the truth should get out. Members of the City Council should seriously consider NOT loaning Mr. Nassi $10 million (or more). It could be financially troubling for Sacramento.

Here are some additional pieces of information that speak to this project’s shaky ground:
1) There is no general contractor for the project – the reason why Nassi does not have a complete set of hard numbers.
2) Mr. Nassi only has THREE people working for him (including an assistant), which does not seem like enough to carry a project as complicated as Aura.
3) Mr. Nassi does not own the plans for Aura. Libeskind and the architectural firm do – they have not been paid. (When this goes to Council (September?) it will be interesting to see if Libeskind is there or not). This could be good for anyone who wants to buy the plans and build the project themselves – A combination of David Taylor and CIM??
4) Looking through the public record to investigate Mr. Nassi’s legal troubles, I found examples of lawsuits and liens.
5) Nassi’s option on the property has expired (no kidding). If he wants to buy it, it’ll cost around $13.5 million.

Why did the Towers on Capital Mall fail?
According to my source, it failed partly for the same reason Aura will fail: Underestimation of the costs. My source also noted that the Towers plan was relatively inefficient. It had a lot of costly dead space. Accountants saw it as unprofitable and the funding dried up.

In five years will I wake up and see high-rise residential in down town Sacramento?
My source seemed very positive about this. (I know this is kind of superfluous, but I had to end it on a happy note.)



There you have it. This information is according to my source. I believe this person to be very credible.
 