Aura?


Wow 550,000 sq ft is a mammoth building for that footprint. Nice find Tower. Maybe Shallit can stop writing fluff articles for a moment and dig into this.
 
Wow 550,000 sq ft is a mammoth building for that footprint. Nice find Tower. Maybe Shallit can stop writing fluff articles for a moment and dig into this.

That's what I was thinking. Maybe we will get something over 500ft on CM sooner that we thought.
 
Really all one needs to do is call the Development Services Help Line and ask if Permit #COM-0711097 pertains to the US Bank building already under construction, or a new building.

#916-808-5656

i'm just too chicken shit. heh
 
Really all one needs to do is call the Development Services Help Line and ask if Permit #COM-0711097 pertains to the US Bank building already under construction, or a new building.

#916-808-5656

i'm just too chicken shit. heh

They said a new building, 900 feet tall! (just kidding).
Dang place closes at 3:30!
 
This is most likely a project that went through Economic Development Dept.
without planning entitlements so I would not have the history of the scope of
work. The building department would not have any detailed information
because there have been no plans submitted for review or any preapplication
meeting. (A building estimate is just a form the applicant faxes
in to get an estimate for future fees.) I'll check into it tomorrow.
 
Cool. I figured the DSD could atleast distinguish which parcel this pertained to. And that would determine whether of not we were talking about a new building.
 
The wheels of the City move slow, be patient :sleep: I'm certain it's because
it went through the Economic Development Dept. for a fee estimate.

Seriously though, a 550,000sf proposed office tower in Sacramento won’t
happen. Unless someone with deep pockets pays for 80% of the costs or
a big tenet is found to meet the banks requirements. It took 621CM five years
to get an anchor tenet big enough to meet the banks requirements for a 365,000sf tower.
A mixed use building would have a better shot at getting built at this size.

We should hear something on Aura in the month on August… up or down
 
Last edited:
Really all one needs to do is call the Development Services Help Line and ask if Permit #COM-0711097 pertains to the US Bank building already under construction, or a new building.

#916-808-5656

i'm just too chicken shit. heh


I doubt the help desk will know the height of buildings. It depends on what information is in the system.
 
i was just wondering if it was the US Bank building, Aura, or a new building... that's all.

but you say it's 450' which is the height of Aura. The description there says it's a commericial building not condos... it's still confusing.
 
Last edited:
450' is aura which is at 621 CM
US bank is at 601 Cm and is 400'

I'm going from memory so don't quote me on this.
 
US Bank is 621, not 601. Aura is 601.

The Contact listed on the permit search site for this mystery project is the San Joaquin Partnership. I called and they said..........................................................................................















They don't know a damn thing about this project. They only take part in much smaller commercial projects in San Joaquin County. The person with whom I spoke (a very friendly person) was flabbergasted that the SJQ Partnership's name was listed. He suspects there is a corrupted field entry in the database (which would make sense because the 621 address is also incorrect - you can't have two objects occupying the same space).
 