ATLANTA | Development Thread V


Status
Not open for further replies.
120-Ottley-Drive-Armour-Yards-1024x682.jpeg

120 Ottley Drive NE- 43,379 Square Feet


165-Ottley-Drive-Armour-Parks-1024x681.jpeg

165 Ottley Drive NE – 60,000 Square Feet
255-Ottley-Drive-NE-Armour-Parks-1024x619.jpeg

255 Ottley Drive NE – 51,344 Square Feet

Atlanta-based real estate developer Third and Urban is moving forward with plans to convert several Sweetwater Design District warehouse buildings into Amour Yards, a commercial office complex, according to What Now Atlanta.The project could include “open-air collaborative common areas,” a coffeehouse, a live music venue, a restaurant, fitness studio, bike rentals and storage, and jogging trails

Plans were recently filed with City of Atlanta for part of the project’s first phase — a $2.9 million transformation of 120 Ottley Drive NE, a 44,745-square-foot warehouse, into offices.Armour Yards Phase One totals 150,000 square feet of office space, according to Jones Lang Lasalle (JLL) marketing materials (JLL is brokering the space for Third and Urban.) In all, plans call to increase the size of the project to approximately 300,000 square feet.“Armour Yards will deliver a life and work enhancing environment where business thrives and people want to be.”


http://whatnowatlanta.com/2015/08/0...massive-300k-square-foot-amour-yards-project/


I wish MARTA would have an infill station built here finally. It's such a disconnected area.
 
And the post millennium site, as well as the surface lot for 33 peachtree pl.

I counted 10 projects that I walked by just this week. Loving all of this activity.

On another note: what's up with the torn/unfinished portions of the exterior of University House? There is exposed sheetrock or something in about 5 spots visible from Spring Street, and it looked odd that they hadn't been painted or sealed or what have you. Otherwise, it's making some great progress besides the first level (presumably retail that will come later) and landscaping. They were window-washing today.
 
i love this frank lloyd wright style that's coming back. it seems like most of the buildings being built now are so much classier and refreshing than the crap we've been building for the last 40 years.
 
I counted 10 projects that I walked by just this week. Loving all of this activity.

On another note: what's up with the torn/unfinished portions of the exterior of University House? There is exposed sheetrock or something in about 5 spots visible from Spring Street, and it looked odd that they hadn't been painted or sealed or what have you. Otherwise, it's making some great progress besides the first level (presumably retail that will come later) and landscaping. They were window-washing today.

Those areas are when the frame of the exterior elevators/lifts were attached to the building. They couldn't finish those areas until it was removed.
 
The Beltline (with transit) will eventually go in right next to this area.

Yes there will be a BeltLine/MARTA transit transfer station in this area. But the priority for this portion of the BeltLine transit is low on the list. There are already active MARTA lines running just south of these properties along 85.
 
I counted 10 projects that I walked by just this week. Loving all of this activity.

On another note: what's up with the torn/unfinished portions of the exterior of University House? There is exposed sheetrock or something in about 5 spots visible from Spring Street, and it looked odd that they hadn't been painted or sealed or what have you. Otherwise, it's making some great progress besides the first level (presumably retail that will come later) and landscaping. They were window-washing today.

Those locations are where the adjustable scaffolding were pinned back to the building during construction. you're seeing the substrate where the exterior material couldn't be finished quite yet with the scaffolding up. This is pretty typical and only requires them to go back and patch the exterior finishes from above (or below if not too high).
 
Status
Not open for further replies.


Back