Anyone have any details on the new Science building?

Also, according to the ABC the Georgia House approved tax credits for an upcoming expansion. I couldn't find anything.

"During a marathon session that stretched into Wednesday night, the House voted 142-28 to refund to the Georgia Aquarium sales taxes paid on construction materials used during an upcoming expansion."

Downtown DRC just got the plans. It's all internal to the structure. It's more of a reconfiguration of underused interior space. No exterior construction is planned.
 
i think the only lasting solution to the connector in downtown and midtown is going to be tunnelling it. i don't think anyone else is thinking that far ahead, but in 25 years this is actually going to be something serious to consider.

Bridging the Connector in strategic locations is a smart idea where the terrain allows, but tunneling....not so much.
 
Buckhead is looking at capping 400 with a park around the Marta station. ~9 acres worth of new park capping 400.

http://buckheadview.com/2015/03/11/bcid-studying-new-buckhead-park-ga-400-marta/

Maybe if this goes through and is a huge success it can start the ball rolling on parts of the connector being capped.

That is just awesome.

Also - just thinking about the feasibility over the Connector: the grade is such in Midtown that northbound 75/85 could be capped, but southbound 75/85 north of 10th is almost at street-level for the most part. It would be extremely difficult to cap properly to connect Georgia Tech/Home Park with Midtown.
 
Buckhead is looking at capping 400 with a park around the Marta station. ~9 acres worth of new park capping 400.

http://buckheadview.com/2015/03/11/bcid-studying-new-buckhead-park-ga-400-marta/

Maybe if this goes through and is a huge success it can start the ball rolling on parts of the connector being capped.

Buckhead really needs this!!!

From Today's Atlanta Business Chronicle
  • 2015 should see the start of the first substantial condo projects. Albeit size will likely only be in the 100 - 150 units. TPX Works, based in Atlanta, is rumored to be looking for intown sites.
  • Wood Partners presented it's plans to the Buckhead Development Review Committee for a 24 story tower by Phipps Plaza.
 
Buckhead is looking at capping 400 with a park around the Marta station. ~9 acres worth of new park capping 400.

http://buckheadview.com/2015/03/11/bcid-studying-new-buckhead-park-ga-400-marta/

Maybe if this goes through and is a huge success it can start the ball rolling on parts of the connector being capped.

There have been several discussions in our office for a similar approach to capping the Connector in sections downtown....provide a balance of public park land and also allow for air rights to developers to build over the interstate and expand the borders of Midtown/Downtown and create more park space (mind you this adds the Federal entity versus GA 400 which is a state route).

The challenge is the funding source and whether you can have a suitable developer willing to take the risk to get a public-private partnership together to make it happen. I see Midtown pulling this off more around the 14th street bridge a la a former proposal to connect 15th street across the Connector as well with a park between the 14th and 15th street bridges.

14thtreetBridge-1.jpg
 
I just came across this. Is this an updated rendering for Amli Arts Center? This looks AWESOME!!!

Yes, that's AMLI Arts Center... I was waiting for someone to post this again since it kept getting broken the first time and I never got to see it... nothing new design-wise but a better quality rendering.

It will be nice *if* it gets built, but I'm starting to wonder. With AMLI behind it I expected it to happen quickly, but unless I've missed something it seems to have gone quiet.
 
Yes, that's AMLI Arts Center... I was waiting for someone to post this again since it kept getting broken the first time and I never got to see it... nothing new design-wise but a better quality rendering.

It will be nice *if* it gets built, but I'm starting to wonder. With AMLI behind it I expected it to happen quickly, but unless I've missed something it seems to have gone quiet.

I definitely think it is going to happen. There was a recent article (can't remember where I read it) where AMLI's Managing Director stated they are working on a $450 Million pipeline of projects for Atlanta and he also went on to say all of the financing is in place.
 
Whats the deal with the Marta renovations? I found these today:

10th Street/Midtown Station


Arts Center Station


I couldnt find anything on the Arts Center Station fronting Spring.
 
Whats the deal with the Marta renovations? I found these today:

10th Street/Midtown Station


Arts Center Station


I couldnt find anything on the Arts Center Station fronting Spring.

::As part of this first phase, the consultant will also be expected to facilitate a visioning/brainstorming session with the client team, which will include representatives
from Midtown Alliance, MARTA, ARC and other stakeholders to identify project goals,
objectives, and potential concepts (and critical success factors) for the enhancement
efforts.::

Essentially these were more or less envisioning a framework/concept for "facelifts" for the stations. Much has to do with securing financing/grant money for these short-term projects. Also now that MARTA is seeking to sell air rights above much of these in-town stations means a complete overhaul of these stations that could possibly null these concepts completely say someone wanted to put a high-rise above them.



http://www.midtownatl.com/_files/docs/rfp---transit-station-enhancement-plans.pdf
 
Photo Update

Va-Hi Project across from FLIP:
IMG_20150313_122527967.jpg


Apartments on Morosgo:
IMG_20150313_133450780_TOP.jpg


AMLI Piedmont Heights:
IMG_20150313_133743246.jpg


ACE:
IMG_20150313_144743374.jpg


Broadstone:
IMG_20150313_144801692.jpg


5th & Peachtree:
IMG_20150313_144851050.jpg


New Einstein's Bagels on Peachtree:
IMG_20150313_145004350_TOP.jpg


New Midtown Fado:
IMG_20150313_145049216.jpg


Crescent Highrise:
IMG_20150313_145233214_TOP.jpg


IMG_20150313_145236744.jpg


Post Millenium (they were doing light work):
IMG_20150313_145250301.jpg


Novare on 14th:
IMG_20150313_145351949.jpg


Heights on Bishop:
IMG_20150313_150031325.jpg
 
From the Zoning Review Board meeting: Atlantic Station plans to develop the surface parking at 17th and State. The project will be a 7-story, 210,000 sq ft office building with 10,000 sq ft of ground floor retail and--you'll like this--no parking, pending approval. The adjacent park will remain.

Soil testing and clearing has already begun, so it appears they want to move fast with this one.
 