AtlantaMustang
Member
According to this article the RFQ has been sent out for it.
That's correct. Here's the link to the RFQ documents.
http://www.realestate.gatech.edu/hpc/index.php
According to this article the RFQ has been sent out for it.
Regarding the surface parking on State between 17th and 18th: The charging station has been removed, the playground is being moved, and it looks like they're doing soil testing today. Apparently something big is on the way. I assume it will be a highrise given the footprint of the lot, but your guess is as good as mine. This one has flown completely under the radar. Maybe they're just readying the lot in case a builder comes along..?
Would that be right across State from Twelve Atlantic Station?
wow.. fake storefront windows.. that is just weird. what are they going to do with those spaces? put ads in there or something? at least they included a door so you can get into the tiny window sill space hah.
That's actually exactly how the Spring st frontage of the Publix is. Just windowed display cases.
That's actually exactly how the Spring st frontage of the Publix is. Just windowed display cases.
But does that Skyhouse deck have any stores that could actually use those window displays? If not, how did that ever get through the DRC?
Yes, that's the one.
City of Refuge filed planning permit for a food truck at that site.
My question to pose is when will the rest of Atlantic Station (south side of 17th / empty hole between Twelve and 271 17th) be filled in? That's what I want to know.
Ha! I doubt they're doing soil testing for a food truck, but if there aren't any permits on file as of yet, maybe they really are just prepping it for the market (that seems oddly specific to me, but maybe it's a common practice). It's shown as highrise residential on the original Atlantic Station site plan, so I think it's probably already zoned for that. The area is within the Midtown Alliance but it might not fall under the DRC. Based on those assumptions, we might not hear anything until the first permits are applied for.
It will probably be at least a decade before all those vacant lots are built out, but I have a feeling this will be the year the first major project is announced... maybe 17th and State will be it. I think their office space is still hurting a bit (albeit helped by Worldpay), but the residential and retail spaces around there have very low vacancy rates, so that market seems ready to bear another tower or two.
811 Juniper, (Broadstone Terraces) filed a permit regarding demolition QC. So this one might be inching forward eventually
![]()
Yep, Broadstone Terraces filed land development permit today.
I think it's worth noting that almost all of the lots across the street from this are owned by the same LLC (likely owned by the Loudermilk Companies as that parking lot is advertised on their website) - so it's possible there could be something going up right across the street from this in the near future.
I thought 811 Peachtree was covering that whole lot
811 from my understanding covers only the large parking lot at Peachtree and 6th. It does not include any of the restaurant houses facing Juniper.
Correct, the property stops at the alley.
Speaking of, any updates you can give us Mr. Fox? On the permit website it appears the November 6 submital is still waiting on building and zoning review?