Libertarian
New member
I assumed it will run on the semi-abandoned track that goes from Emory to Armour yards, just south of Lindbergh Marta.
So is the difference between light rail and heavy rail essentially whether or not you have a dedicated ROW separate from vehicular traffic?
Is there even anywhere above ground that you *could* put a heavy rail line? Or would it have to be all underground.
I assumed it will run on the semi-abandoned track that goes from Emory to Armour yards, just south of Lindbergh Marta.
Well these folks in cabbage town paint krog street tunnelAlot of memories gone now.
It looks like, for midtown, we will see:
as the next projects starting in the very near term.
- Seventh Midtown
- 60 11th St
- One Museum Place
i agree. the light rail proposal simply sucks. a good portion of it is actually in mixed traffic on clifton, so the headways will be entirely up to traffic. the project needs to be switched to a heavy rail project, and if they want to do light rail on the stretch between north decatur and avondale, they can do so; the first part needs to be subway.
It will be back Sunday night. Don't worry.
Not necessarily true. Have you ever been to Long Beach to see how their light rail is actually within a dedicated ROW in the center of the streets - not like the downtown Atlanta Streetcar. So thus traffic doesn't have as much of an impact on headways since it's coordinated with the intersection lights as well. The only way traffic would impede would be if it's blocking intersections in which case you can be ticketed - and which can/should be enforced more here in Atlanta.
it's in the MARTA documents, somewhere out there. their LPA included "shared right of way" with cars on clifton road.
i would like to see a heavy rail line like this eventually happen, with the clifton corridor being the first leg of it:
http://goo.gl/maps/q51WI
i would like to see a heavy rail line like this eventually happen
it's in the MARTA documents, somewhere out there. their LPA included "shared right of way" with cars on clifton road.
i would like to see a heavy rail line like this eventually happen, with the clifton corridor being the first leg of it:
http://goo.gl/maps/q51WI
I think you're route has a lot of merit. It would undoubtedly by used by a lot of people, including myself, but I don't think heavy rail is the way to go. For one, it'd be insanely expensive and the other issue is there simply isn't the land available, unless this was underground most of the time, which again, would be insanely expensive. Light rail would make a lot more sense and if they did it correctly, like having a dedicated lane where the light rail had to run on a road, it'd be fine.
I agree underground routes generally tend to cost around 250 million per kilometer this rout would cost 7.5 billion. I don't see that happening in GA ever.
I agree underground routes generally tend to cost around 250 million per kilometer this rout would cost 7.5 billion. I don't see that happening in GA ever.
Funny 'it' happens in the 1970s and 80s in GA with regularity-- that's how MARTA got built-- BTW without ANY state funds--
AMLI Roxboro Rd. filed permits and preparing to move forward
https://www.bisnow.com/archives/new...nta/3184-will-rite-aid-move-1m-sf-to-atlanta/
The crown on 1180 Peachtree has been out for several days. I wonder if they're modifying it..?