Alfred E Neuman
New member
Also, site prep for Cornerstone Medical Bldg. has begun on P'tree at Collier.
According to Atlanta Business Chronicle,The Federal Transit Administration and MARTA are moving forward with a study of a possible new light rail transit line that would run through the Clifton Corridor.The proposed 8.8 mile line would extend from the Lindbergh MARTA station through the Centers for Disease Control (CDC) headquarters and Emory University and Emory Hospital campuses to the Avondale MARTA station.
The Clifton Corridor, which runs along Clifton Road past the CDC and Emory, is a growing employment center that's not served by either direct Interstate access or high-capacity transit.
The Atlanta Business Chronicle reported last January that the CDC is considering an expansion over 10 years at its campus near Emory University that could lead to a 30 percent increase in workers and the construction of a big new laboratory and parking deck. At a public hearing on March 20, area residents expressed concerns that such an influx of new commuters would be too much for the already congested corridor.
http://www.bizjournals.com/atlanta/...marta-to-launch-study-of-light-rail-line.html
to me this was one of the biggest and most important proposals that was included in the TSPLOST. There is a huge need for this. It would be incredibly beneficial for the Emory/CDC area, but also would connect to Avondale Station east of Decatur if they stick to the initial proposal, which would allow you to travel from Decatur to Lindberg and the northern reaches of Marta without going through five points station. would really make MARTA a much more robust and useful transit system
It would also hook up Decatur with Buckhead. That has long been one of the most annoying traverses in town, and one that many people need to make.
It would be great if the line could continue northwest into the Buckhead Village. With everything going on in the village, it would make sense for it to have rail access. That was one aspect I longed for when I lived there.
Yes. That area already needs it and it would only improve the appeal of the district.
i think what we'll see is streetcar serving this part of Buckhead. it's a long trek on streetcar from downtown up peachtree to buckehad so they'll have to run a good number of cars ( would maybe be a southern segment and a northern segment where you have to transfer? ), but it makes lots of sense as the peachtree corridor is fairly dense and under served by transit. i mean there are buses of course.
Don't forget Buc which is free. They claim to still be running 10 minute headways
http://bucride.com/about-the-buc
you know ive never even heard of that before.. interesting.. looks like it doesnt cover a very big area though and doesnt go over to the Buckhead Atlanta area..
you know ive never even heard of that before.. interesting.. looks like it doesnt cover a very big area though and doesnt go over to the Buckhead Atlanta area..
![]()
Anybody know what's going on at the corner of Piedmont and Westminster? Just passed by earlier today and a construction fence with ongoing sitework/clearing. Perhaps it's just to make the site more marketable?
![]()
According to Atlanta Business Chronicle,The Federal Transit Administration and MARTA are moving forward with a study of a possible new light rail transit line that would run through the Clifton Corridor.The proposed 8.8 mile line would extend from the Lindbergh MARTA station through the Centers for Disease Control (CDC) headquarters and Emory University and Emory Hospital campuses to the Avondale MARTA station.
The Clifton Corridor, which runs along Clifton Road past the CDC and Emory, is a growing employment center that's not served by either direct Interstate access or high-capacity transit.
The Atlanta Business Chronicle reported last January that the CDC is considering an expansion over 10 years at its campus near Emory University that could lead to a 30 percent increase in workers and the construction of a big new laboratory and parking deck. At a public hearing on March 20, area residents expressed concerns that such an influx of new commuters would be too much for the already congested corridor.
http://www.bizjournals.com/atlanta/...marta-to-launch-study-of-light-rail-line.html
Don't forget Buc which is free. They claim to still be running 10 minute headways
http://bucride.com/about-the-buc
I think if Clayton votes yes for MARTA in a few weeks this proposal needs to change from light rail to heavy rail. This would be a great opportunity to create a new line from Jonesboro to Emory/CDC. Instead of Lindberg being the transfer point they can do the transfer at a newly constructed Armour Yard Station. A limited stop shuttle from the new Emory/CDC Station to Decatur station could be created using Clifton Rd, N. Decatur Rd, and Clifton Rd to connect to the Decatur Station. It can be the new Silver Line and new bus route 210. This would unify the system more using existing services instead of trying to build a whole new type of mode that's only going to service a small area. The 210 could easily run at 10 minute headways to make it desirable during the day (5am to 10pm) and then run until train service ends around 1am.
Any new proposals or something that's bout to come to fruition?
i agree. the light rail proposal simply sucks. a good portion of it is actually in mixed traffic on clifton, so the headways will be entirely up to traffic. the project needs to be switched to a heavy rail project, and if they want to do light rail on the stretch between north decatur and avondale, they can do so; the first part needs to be subway.