ATLANTA | Development Thread V


Status
Not open for further replies.
Here's a picture this morning of both construction sites:

Photo May 20, 8 49 30 AM-lg.jpg



Photo May 20, 8 49 57 AM-lg.jpg
 
It's definitely going up. It looks like it's pretty close to topping out now.

Hey you are right!!! It's now basically above the other building. When I replied this morning, I'd not even looked out the window. I went straight down to J. Christopher's, and assumed it was in the same position as yesterday.

ps0h.jpg
 
Last edited:
Meanwhile in actual Atlanta development news..

May 2014 DRC Recap:

amli-newest-slide.jpg

(The little yellow frame in the front corner is the new retail space on West Peachtree I referred to. Also it's a little hard to tell from this render, but there is a gap between to top of the two large "frames" and the glass beneath them, which will look quite nice if lit correctly.)

AMLI Arts Center – Following an initial presentation in January 2014, AMLI Residential returned to the DRC to present an update to the proposed AMLI Arts Center at West Peachtree and 15th Street. The project includes 350 apartment units, 4,350 square feet of retail space, and a 552 space precast parking structure across the street from the Arts Center MARTA Station. The DRC anticipates recommending approval for the project but will conduct a final design review with the applicant electronically to approve the proposed parking deck facade.

novare-slide-newest.jpg


1163 West Peachtree Street – Novare Group, the development team behind the recently completed Skyhouse South and Skyhouse Midtown projects, is proposing a new mixed-use project on the southeast corner of 14th and West Peachtree where Einstein’s Bagels is currently located. The project is a 32-story tower with 404 residential units and 11,500 SF of retail. The DRC has recommended approval for this project. In particular, the committee noted their support of proposed community improvements, including a bike lane on West Peachtree and one to two-way conversion of 13th Street from West Peachtree Street to Peachtree Walk.​

post-millenium-new.jpg


33 11th Street – Post Properties presented its proposal for Midtown Millennium, a 23-story residential building on the empty lot behind the Federal Reserve. The project is configured with 327 apartments above 7 levels of fully-enclosed parking. The DRC has recommended conditional approval based on the creation of an additional loading zone for small service vehicles.

http://www.midtownatl.com/about/mid...m/midtown-monthly-may-2014/may-2014-drc-recap


Finally!!! A rendering for the Amli Arts Center tower. The lines are clean with just enough adornment at the base. All three are apartment buildings but all three look different. That is a good thing.
 
Finally!!! A rendering for the Amli Arts Center tower. The lines are clean with just enough adornment at the base. All three are apartment buildings but all three look different. That is a good thing.

Yes it does I hope it adds LEED lights to add some pop to the skyline at night!!!:notacrook::cheers:
 
Ok guys I walked to the 811Peachtree site and asked one of the workers if he knew when construction would start and he said some time in August so looks like this one is a go
 
Ok guys I walked to the 811Peachtree site and asked one of the workers if he knew when construction would start and he said some time in August so looks like this one is a go

YES!!! :D
This is my favorite proposal. I can't wait to see how the green glass looks on the balconies. This is going to have a nice impact in the skyline.
 
YES!!! :D
This is my favorite proposal. I can't wait to see how the green glass looks on the balconies. This is going to have a nice impact in the skyline.

Mine too joecool, by far.

I love the explosion of development that's happening, but none (so far) come close to the beauty of this design imo. ;)
 
Whatever happened to 50 Allen Plaza and Centennial Hill Condo Tower II?

I know those were proposed during the height of the recession, but now that things seem to be picking up again, will there be a breathe of new life?
 
Whatever happened to 50 Allen Plaza and Centennial Hill Condo Tower II?

I know those were proposed during the height of the recession, but now that things seem to be picking up again, will there be a breathe of new life?

as far as i know, the only office and residential projects going on downtown at this time are conversions and remodels, besides the student dorms going up at GSU.
 
as far as i know, the only office and residential projects going on downtown at this time are conversions and remodels, besides the student dorms going up at GSU.

Terminus said Post is going forward with 400 or so apartments, mid-rise construction, in the Allen Plaza area. So there's that. Not to mention the hotel / apartments going up in Luckie-Marietta District.
 
Terminus said Post is going forward with 400 or so apartments, mid-rise construction, in the Allen Plaza area. So there's that. Not to mention the hotel / apartments going up in Luckie-Marietta District.

Also the apartment proposal along edgewood/auburn ave right next to the apartment conversion project.
 
Terminus said Post is going forward with 400 or so apartments, mid-rise construction, in the Allen Plaza area. So there's that. Not to mention the hotel / apartments going up in Luckie-Marietta District.

oh yeah! the one hugging the interstate and spring street; i forgot about that one.
 
Ok guys I walked to the 811Peachtree site and asked one of the workers if he knew when construction would start and he said some time in August so looks like this one is a go

They actually started site prep yesterday. Part of the parking lot closest to the intersection has been torn up. Groundbreaking isn't scheduled until July, but they found a gas tank from an old service station on site that they have to remedy before they can get moving on construction.
 
They actually started site prep yesterday. Part of the parking lot closest to the intersection has been torn up. Groundbreaking isn't scheduled until July, but they found a gas tank from an old service station on site that they have to remedy before they can get moving on construction.

You are correct about site prep and the gas tank I seen that for my self but acorrding to the worker that I personally talked to construction want start till August
 
Status
Not open for further replies.


Back
Top